Power converter control and operation

Inventors: Javier Sanchez Navarro (Barcelona, ES); Domenico Ricchiuto (Barcelona, ES); Leonardo Mandrioli (Milan, IT); Oriol Caubet Busquet (Barcelona, ES)
Assignee: General Electric Renovables Espana, S.L.
F03D7/0284F03D9/25F03D7/0272F05B2270/337H02J3/48
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,448,188
App. No.
16/924,333
Granted
Sep 20, 2022
Kind
B2
Abstract

Methods of operating a wind turbine ( 1 ) having a generator ( 10 ) and a power converter ( 60 ). The methods may comprise: determining a reduced first power setpoint ( 94 ) in response to an operational condition; reducing active power from a line-side converter ( 66 ) to an electrical grid ( 80 ) according to the reduced first power setpoint ( 94 ); determining a reduced power setpoint ( 92 ) for a machine-side converter ( 62 ); reducing a torque applied to the generator ( 10 ) by the machine-side converter ( 62 ) such that active power according to the reduced second power setpoint ( 92 ) is produced by the generator ( 10 ); and dissipating a power surplus in one or more resistive elements ( 68 ) as long as the second power setpoint is superior to the first power setpoint. Wind turbines configured for such methods are also provided.

Claims (24)

1. A method of operating a wind turbine having a generator and a power converter, the method comprising:

in a normal operating state, supplying active power from the generator to an electrical grid through a power converter having a line-side converter and a machine-side converter;

in response to an operational grid condition, determining a first power setpoint for control of the line-side converter to reduce active power supplied from the line side converter to the electrical grid as compared to the active power from the generator to the machine-side converter;

controlling the first power setpoint to reduce the active power from the line-side converter to the electrical grid at a first reduction rate;

at a same time as determining the first power setpoint, determining a second power setpoint for control of the machine-side converter such that a torque applied to the generator by the machine-side converter reduces the active power from the generator and maintains the active power from the generator greater than the active power from the line-side converter to the electrical grid;

controlling the second power setpoint to reduce the active power from the generator at a second reduction rate that is less than the first reduction rate, wherein the active power from the generator reduces at the second reduction rate and remains greater than the active power from the line-side converter to the electrical grid as the active power from the line-side converter reduces at the first reduction rate; and

dissipating an active power surplus between the active power from the generator and the active power from the line-side converter to the electrical grid in one or more resistive elements as long as the second power setpoint is greater than the first power setpoint.

2. The method according to claim 1 , wherein the operational condition of the electrical grid is an increase in frequency of the grid.

3. The method according to claim 1 , wherein the operational condition of the electrical grid is a voltage sag.

4. The method according to claim 1 , wherein the second power setpoint is reduced according to a maximum reduction rate.

5. The method according to claim 4 , wherein the maximum reduction rate is determined to avoid an overspeed of a rotor of the wind turbine.

6. The method according to claim 1 , wherein the first power setpoint is received by the wind turbine from a grid operator.

7. The method according to claim 1 , wherein the first power setpoint is determined by the wind turbine in response to a measured electrical grid variable.

8. The method according to claim 1 , further comprising pitching blades of a wind turbine rotor to reduce rotational speed of the wind turbine rotor.

9. The method according to claim 1 , further comprising monitoring an operation of the resistive elements to avoid the resistive elements reaching an operational limit, and dissipating less energy in the resistive elements if one or more of the resistive elements reach an operational limit.

10. The method according to claim 1 , further comprising increasing the active power from the generator once the condition of the electrical grid has been resolved.

11. A wind turbine comprising:

a wind turbine rotor with a plurality of blades;

a generator operatively connected with the wind turbine rotor;

a power converter electrically connecting the generator to an electrical grid, wherein the power converter includes a line-side converter, a machine-side converter and a DC-link, and a controller, wherein

the controller is configured to operate the wind turbine in accordance with the method of claim 1 .

12. The wind turbine according to claim 11 , further comprising one or more resistive elements in the DC-link, and wherein the power converter is configured to dissipate the surplus of active power in the resistive elements in the DC-link.

13. The wind turbine according to claim 11 , wherein the controller is configured to lower the second power setpoint as quickly as possible.

14. The wind turbine according to claim 11 , wherein the generator is a permanent magnet generator, and the power converter is a full power converter.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 7, 2022
From: GE RENEWABLE GERMANY GMBH
To: GENERAL ELECTRIC RENOVABLES ESPANA, S.L.
Reel/Frame 060119/0235 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 9, 2020
From: SANCHEZ NAVARRO, JAVIER; RICCHIUTO, DOMENICO; CAUBET BUSQUET, ORIOL
To: GENERAL ELECTRIC RENOVABLES ESPANA, S.L.
Reel/Frame 053160/0962 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 9, 2020
From: MANDRIOLI, LEONARDO
To: GE RENEWABLE GERMANY GMBH
Reel/Frame 053161/0011 →
Priority Claims (1)
EP 19382586 · Jul 9, 2019 · regional
Continuity (1)
Related Publication 20210010456A1 · Jan 14, 2021
Cited By (1)