Control of power generation system during online maintenance using multiple maintenance modes

Inventors: Bryan Edward Sweet (Valatie, NY); Christian-Anghel Solacolu (Cravanche, FR); Melinda Stephanie Ammerman (Simpsonville, SC); Bret Stephen Dalton (Greer, SC)
Assignee: General Electric Company
H02J13/00006H02J3/0012H02J3/0073H02J13/00002H02J13/00004H02J2203/10
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,489,364
App. No.
16/935,318
Granted
Nov 1, 2022
Kind
B2
Abstract

Embodiments of the disclosure provide a method for controlling a power generation system during on-line maintenance. The method includes operating the power generation system in a first maintenance mode, which causes a controller of the power generation system to disable an automated response to at least one operational fault of the power generation system; monitoring a risk parameter of the power generation system or at least one sensor within the power generation system while operating the power generation system in the first maintenance mode; and operating the power generation system in a second maintenance mode in response to detecting an override command, an elapsed time exceeding a time limit, or the monitored risk parameter exceeding a safety threshold. The second maintenance mode causes the controller of the power generation system to enable the automated response to the at least one operational fault of the power generation system.

Claims (58)

1. A method for controlling a power generation system during on-line maintenance, the method comprising:

modeling the power generation system in a first maintenance mode and a second maintenance mode;

operating the power generation system in the first maintenance mode,

wherein the operating the power generation system in the first maintenance mode causes a controller of the power generation system to programmatically disable an automated response to at least one operational fault of the power generation system,

wherein modeling the power generation system determines the automated response to the at least one operational fault of the power generation system;

calculating an elapsed time of operating the power generation system in the first maintenance mode, wherein calculating the elapsed time includes accumulating time from previous instances of operating in the first maintenance mode;

monitoring a risk parameter of the power generation system or at least one sensor within the power generation system while operating the power generation system in the first maintenance mode; and

operating the power generation system in the second maintenance mode in response to detecting the elapsed time in the first maintenance mode exceeding a time limit, or the monitored risk parameter exceeding a safety threshold,

wherein operating the power generation system in the second maintenance mode causes the controller of the power generation system to programmatically enable the automated response to the at least one operational fault of the power generation system,

wherein modeling the power generation system determines the time limit of the elapsed time and the safety threshold of the monitored risk parameter.

2. The method of claim 1 , wherein the monitored risk parameter includes a hazardous fluid concentration within a sensing line of the power generation system, or each of an air flow within the sensing line and a sensor quality for a gas sensor in fluid communication with the sensing line of the power generation system.

3. The method of claim 1 , further comprising maintaining operation of the power generation system in the first maintenance mode in response to not detecting the elapsed time in the first maintenance mode not exceeding a time limit, and the monitored risk parameter not exceeding the safety threshold.

4. The method of claim 1 , further comprising, while operating the power generation system in the second maintenance mode:

in response to detecting an authorization to operate the power generation system in the first maintenance mode, determining whether the power generation system complies with a set of preconditions for the first maintenance mode;

operating the power generation system in the first maintenance mode in response to the power generation system complying with the set of preconditions; and

maintaining operation of the power generation system in the second maintenance mode in response to the power generation system not complying with the set of preconditions.

5. The method of claim 1 , wherein the monitored risk parameter includes a plurality of risk parameters each having a corresponding safety threshold.

6. The method of claim 1 , further comprising disabling further operation of the power generation system in the first maintenance mode in response to detecting the elapsed time in the first maintenance mode exceeding the time limit.

7. The method of claim 1 , further comprising disabling further operation of the power generation system in the first maintenance mode in response to detecting an override command.

8. A program product stored on a non-transitory computer readable storage medium for controlling a power generation system during on-line maintenance, the computer readable storage medium comprising program code for causing a computer system to perform actions including:

modeling the power generation system in a first maintenance mode and a second maintenance mode;

operating the power generation system in the first maintenance mode,

wherein the operating the power generation system in the first maintenance mode causes a controller of the power generation system to programmatically disable an automated response to at least one operational fault of the power generation system,

wherein modeling the power generation system determines the automated response to the at least one operational fault of the power generation system;

calculating an elapsed time of operating the power generation system in the first maintenance mode, wherein calculating the elapsed time includes accumulating time from previous instances of operating in the first maintenance mode;

monitoring a risk parameter of the power generation system or at least one sensor within the power generation system while operating the power generation system in the first maintenance mode; and

operating the power generation system in the second maintenance mode in response to detecting the elapsed time in the first maintenance mode exceeding a time limit, or the monitored risk parameter exceeding a safety threshold,

wherein operating the power generation system in the second maintenance mode causes the controller of the power generation system to programmatically enable the automated response to the at least one operational fault of the power generation system,

wherein modeling the power generation system determines the time limit of the elapsed time and the safety threshold of the monitored risk parameter.

9. The program product of claim 8 , wherein the monitored risk parameter includes a hazardous fluid concentration within a sensing line of the power generation system, or each of an air flow within the sensing line and a sensor quality for a gas sensor in fluid communication with the sensing line of the power generation system.

10. The program product of claim 8 , further comprising program code for maintaining operation of the power generation system in the first maintenance mode in response to not detecting the elapsed time in the first maintenance mode not exceeding a time limit, and the monitored risk parameter not exceeding the safety threshold.

11. The program product of claim 8 , further comprising program code for actions including, while operating the power generation system in the second maintenance mode:

in response to detecting an authorization to operate the power generation system in the first maintenance mode, determining whether the power generation system complies with a set of preconditions for the first maintenance mode;

operating the power generation system in the first maintenance mode in response to the power generation system complying with the set of preconditions; and

maintaining operation of the power generation system in the second maintenance mode in response to the power generation system not complying with the set of preconditions.

12. The program product of claim 8 , wherein the monitored risk parameter includes a plurality of risk parameters each having a corresponding safety threshold.

13. The program product of claim 8 , further comprising program code for disabling further operation of the power generation system in the first maintenance mode in response to detecting the elapsed time in the first maintenance mode exceeding the time limit.

14. The program product of claim 8 , further comprising program code for disabling further operation of the power generation system in the first maintenance mode in response to detecting an override command.

15. A system comprising:

a power generation system configured to operate in an on-line maintenance setting;

a system controller in communication with the power generation system, the system controller being configured to perform actions during operation of the power generation system in the on-line maintenance setting, the actions including:

model the power generation system in a first maintenance mode and a second maintenance mode;

operate the power generation system in the first maintenance mode,

wherein the operating the power generation system in the first maintenance mode causes a controller of the power generation system to programmatically disable an automated response to at least one operational fault of the power generation system,

wherein modeling the power generation system determines the automated response to the at least one operational fault of the power generation system;

calculate an elapsed time of operating the power generation system in the first maintenance mode, wherein calculating the elapsed time includes accumulating time from previous instances of operating in the first maintenance mode;

monitor a risk parameter of the power generation system or at least one sensor within the power generation system while operating the power generation system in the first maintenance mode; and

operate the power generation system in the second maintenance mode in response to detecting the elapsed time in the first maintenance mode exceeding a time limit, or the monitored risk parameter exceeding a safety threshold,

wherein operating the power generation system in the second maintenance mode causes the controller of the power generation system to programmatically enable the automated response to the at least one operational fault of the power generation system,

wherein modeling the power generation system determines the time limit of the elapsed time and the safety threshold of the monitored risk parameter.

16. The system of claim 15 , wherein the monitored risk parameter includes a hazardous fluid concentration within a sensing line of the power generation system, or each of an air flow within the sensing line and a sensor quality for a gas sensor in fluid communication with the sensing line of the power generation system.

17. The system of claim 15 , wherein the system controller is further configured to maintain operation of the power generation system in the first maintenance mode in response to not detecting the elapsed time in the first maintenance mode not exceeding a time limit, and the monitored risk parameter not exceeding the safety threshold.

18. The system of claim 15 , wherein the system controller is further configured, while operating the power generation system in the second maintenance mode, to perform actions including:

in response to detecting an authorization to operate the power generation system in the first maintenance mode, determine whether the power generation system complies with a set of preconditions for the first maintenance mode;

operate the power generation system in the first maintenance mode in response to the power generation system complying with the set of preconditions; and

maintain operation of the power generation system in the second maintenance mode in response to the power generation system not complying with the set of preconditions.

19. The system of claim 15 , wherein the monitored risk parameter includes a plurality of risk parameters each having a corresponding safety threshold.

20. The system of claim 15 , wherein the system controller is further configured to disable further operation of the power generation system in the first maintenance mode in response to detecting the elapsed time in the first maintenance mode exceeding the time limit.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 17, 2023
From: GENERAL ELECTRIC COMPANY
To: GE INFRASTRUCTURE TECHNOLOGY LLC
Reel/Frame 065727/0001 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 25, 2020
From: SWEET, BRYAN EDWARD; SOLACOLU, CHRISTIAN-ANGHEL; AMMERMAN, MELINDA STEPHANIE; DALTON, BRET STEPHEN
To: GENERAL ELECTRIC COMPANY
Reel/Frame 053889/0387 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 22, 2020
From: SWEET, BRYAN EDWARD; SOLACOLU, CHRISTIAN-ANGHEL; AMMERMAN, MELINDA STEPHANIE; DALTON, BRET STEPHEN
To: GENERAL ELECTRIC COMPANY
Reel/Frame 053275/0925 →
Continuity (1)
Related Publication 20220029454A1 · Jan 27, 2022