Power conversion apparatus that judges system power failure based on system frequency and voltage

Inventors: Yuusuke Kouno (Tachikawa, JP); Yoichi Morishima (Tokyo, JP)
Assignees: KABUSHIKI KAISHA TOSHIBA; Toshiba Infrastructure Systems & Solutions Corporal
H02M7/537G01R19/16538G01R19/2513G01R23/15H02H3/353H02H7/1225H02J3/42H02M1/0003
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,527,966
App. No.
17/073,605
Granted
Dec 13, 2022
Kind
B2
Abstract

An apparatus according to an embodiment includes a control circuit to control operations of an inverter and a switch. The control circuit judges whether or not a power system has a power failure, based on values of the system voltage and a frequency of the power system; and calculates a phase difference between a phase of the output voltage of the inverter and a phase of the system voltage and generate, by means of the phase difference, an output frequency pattern for changing a frequency of the output voltage of the inverter. The control circuit, when it is judged that the power system has recovered from the power failure, controls the inverter to change the frequency of the output voltage of the inverter in line with the output frequency pattern, and closes the switch after the phase difference becomes smaller than or equal to a threshold.

Claims (28)

1. A power conversion apparatus comprising:

a power supply;

an inverter configured to convert DC power supplied from the power supply into AC power and AC power supplied from a power system into DC power;

a switch configured to switch an electrical connection state of an AC line between an AC terminal of the inverter and an input terminal from the power system;

a first voltage detector configured to detect an output voltage of the inverter;

a second voltage detector configured to detect a system voltage of the power system; and

a control circuit configured to control the inverter and the switch,

wherein the control circuit:

judges whether or not the power system has a power failure, based on values of the system voltage and a frequency of the power system,

calculates, when the power system has recovered from the power failure, a phase difference between a phase of the output voltage of the inverter and a phase of the system voltage and generate, by using the phase difference, an output frequency pattern including a first period in which the frequency is changed at a predetermined frequency change rate and a second period in which the frequency has a predetermined constant value for changing a frequency of the output voltage of the inverter, and

controls the inverter to change the frequency of the output voltage of the inverter using the output frequency pattern, and closes the switch when the phase difference becomes smaller than or equal to a threshold.

2. The power conversion apparatus according to claim 1 , wherein the predetermined constant value is at a frequency upper limit or a frequency lower limit.

3. A power conversion apparatus comprising:

a power supply;

an inverter configured to convert DC power supplied from the power supply into AC power and AC power supplied from a power system into DC power;

a switch configured to switch an electrical connection state of an AC line between an AC terminal of the inverter and an input terminal from the power system;

a first voltage detector configured to detect an output voltage of the inverter;

a second voltage detector configured to detect a system voltage of the power system; and

a control circuit configured to control the inverter and the switch,

wherein the control circuit:

judges whether or not the power system has a power failure, based on values of the system voltage and a frequency of the power system,

when the power system has recovered from the power failure,

calculates a phase difference between a phase of the output voltage of the inverter and a phase of the system voltage and generate, by using the phase difference, a first output frequency pattern for changing a frequency of the output voltage of the inverter, and controls the inverter to change the frequency of the output voltage of the inverter using the first output frequency pattern,

re-calculates the phase difference when it is judged that the phase difference is larger than the predetermined threshold after controlling the inverter using the first output frequency pattern, and generates, by using the re-calculated phase difference, a second output frequency pattern for changing the frequency of the output voltage of the inverter, and controls the inverter to change the frequency of the output voltage of the inverter using the second output frequency pattern, and

closes the switch when the phase difference becomes smaller than or equal to a threshold.

4. The power conversion apparatus according to claim 3 , wherein the output frequency pattern includes a first period in which the frequency is changed at a predetermined frequency change rate.

5. The power conversion apparatus according to claim 4 , wherein the output frequency pattern further includes a second period in which the frequency has a constant value.

6. The power conversion apparatus according to claim 5 , wherein the constant value is at a frequency upper limit or a frequency lower limit.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 14, 2024
From: KABUSHIKI KAISHA TOSHIBA; TOSHIBA INFRASTRUCTURE SYSTEMS & SOLUTIONS CORPORATION
To: KABUSHIKI KAISHA TOSHIBA; TOSHIBA ENERGY SYSTEMS & SOLUTIONS CORPORATION
Reel/Frame 067728/0762 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 19, 2020
From: KOUNO, YUUSUKE; MORISHIMA, YOICHI
To: KABUSHIKI KAISHA TOSHIBA; TOSHIBA INFRASTRUCTURE SYSTEMS & SOLUTIONS CORPORATION
Reel/Frame 054093/0680 →
Priority Claims (1)
JP JP2020-041699 · Mar 11, 2020 · national
Continuity (1)
Related Publication 20210288592A1 · Sep 16, 2021