IP Library Granted Patent US 11,539,640
Granted Patent B2
US 11,539,640 · App. 16/766,560 · Granted Dec 27, 2022

Target resource operation method, node device, terminal device and computer-readable storage medium

Inventors: Junjie Zhao (Beijing, CN); Qian Zhang (Beijing, CN)
Assignee: BEIJING BOE TECHNOLOGY DEVELOPMENT CO., LTD.
H04L47/82G16Y30/00
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,539,640
App. No.
16/766,560
Granted
Dec 27, 2022
Kind
B2
Abstract

A target resource operation method, a node device, a terminal device and a computer-readable storage medium. The method includes: receiving a request to carry out an operation by using a first resource as a target resource; determining at least one resource associated with the first resource; and selecting a target resource from among the at least one resource associated with the first resource to carry out the operation. According to the described method and device, an associated resource may be selected as a target resource for carrying out an operation according to the relevance of each resource.

Claims (47)

1. A method for operating a target resource on a common service entity, comprising:

receiving a request for operating a first resource as the target resource;

retrieving at least one resource correlated with the first resource, the at least one resource includes a second resource; and

selecting the target resource from the first resource and the at least one resource correlated with the first resource for operation,

wherein,

attributes of the first resource include an identifier of the second resource, or

a member list of a first resource group includes an identifier of the second resource and an identifier of the first resource, and a member list of a second resource group includes an identifier of the second resource and a member list of a first resource group includes an identifier of the first resource and an attribute that directs to an identifier of the second resource group.

2. The method of claim 1 , further comprising:

creating the first resource group, wherein a member list of the first resource group includes the identifier of a first resource, so that the first resource is a member of the created first resource group.

3. The method of claim 2 , in a case where the first resource group is created, the member list of the first resource group further includes the identifier of the second resource, so that the second resource is a member of the first resource group.

4. The method of claim 2 , further comprising:

creating the second resource group, wherein a member list of the second resource group includes the identifier of the second resource, so that the second resource is a member of the created second resource group; and

setting an attribute in the first resource group that directs to an identifier the identifier of the second resource group, so as to correlate the first resource group with the second resource group.

5. The method of claim 1 , further comprising:

setting an attribute in the first resource that directs to the identifier of the second resource.

6. The method of claim 3 , further comprising:

accessing the first resource group or the first resource, and acquiring the second resource correlated with the first resource.

7. The method of claim 6 , further comprising:

selecting the first resource or the second resource as the target resource according to at least one of: update time, update precision, and updated content of data recorded by the first resource and the second resource, and operating the target resource.

8. The method of claim 3 , wherein the first resource group includes an attribute of a start time for resource correlation, the method further comprising:

setting the start time for resource correlation to a time at which the creation of the first resource group is completed.

9. The method of claim 3 , wherein the first resource group includes an attribute of a start time for resource correlation and an enable flag for resource correlation, the method further comprises:

in a case where an update request for the first resource group for establishing a correlation between the first resource and the second resource is received, setting the enable flag for resource correlation to true, and setting the start time for resource correlation to a time at which the update of the first resource group is completed.

10. The method of claim 2 , wherein the first resource group includes an attribute of a start time for resource correlation, the method further comprises:

in a case where an update request for the first resource group for establishing a correlation between the first resource and the second resource is received, adding the identifier of the second resource to the member list of the first resource group so that the second resource is a member of the first resource group, and setting the start time for resource correlation to a time at which the update of the first resource group is completed.

11. The method of claim 4 , wherein the first resource group further includes a start time for resource correlation, the method comprises:

setting the start time for resource correlation to a time at which the setting of the attribute in the first resource group that directs to the identifier of the second resource group is completed.

12. The method of claim 8 , wherein the first resource group further includes an attribute of an end time for resource correlation, the method further comprises:

in a case where an update request for the first resource group for releasing the correlation between the first resource and the second resource is received, setting the end time for resource correlation to a time at which the update of the first resource group is completed.

13. The method of claim 5 , wherein the first resource includes a start time for resource correlation, the method further comprises:

setting the start time for resource correlation to a time at which when the setting of the attribute in the first resource group that directs to the identifier of the second resource is completed.

14. The method of claim 13 , wherein the first resource further includes an end time for resource correlation, the method further comprises:

in a case where an update request for the first resource for releasing the correlation between the first resource and the second resource is received, setting the end time for resource correlation to a time at which the update of the first resource is completed.

15. The method of claim 4 , wherein in addition to the second resource, the member list of the second resource group further includes at least one member correlated with the second resource;

the method further comprises:

selecting one or more members listed in the member list of the second resource group as the target resource for operation.

16. The method of claim 2 , further comprising:

selecting one or more members listed in the member list of the first resource group as the target resource for operation.

17. The method of claim 4 , further comprising:

determining one or more resources correlated with the first resource as the target resource for operation according to at least one of: update time, update precision and updated content of data recorded by members listed in the member lists of the first resource group and the second resource group.

18. A node device comprises a processor, wherein the processor is configured to perform the steps of the method according to claim 1 .

19. A terminal apparatus for operating a target resource, comprising a processor, wherein the processor is configured to:

transmit, to the node device of claim 18 , a request for operating a first resource as the target resource; and

receive, from the node device, a response result of operating at least one resource correlated with the first resource.

20. The terminal apparatus of claim 19 , wherein the first resource and the at least one resource correlated therewith are members of a first resource group; or

wherein the first resource and the at least one resource correlated therewith are a member of the first resource group and a member of the second resource group, respectively, and the first resource group including an attribute that directs to the identifier of the second resource group; or

wherein the first resource includes an attribute that directs to the identifier of the at least one resource.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Nov 2, 2022
From: BOE TECHNOLOGY GROUP CO., LTD.
To: BEIJING BOE TECHNOLOGY DEVELOPMENT CO., LTD.
Reel/Frame 061628/0380 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 22, 2020
From: ZHAO, JUNJIE; ZHANG, QIAN
To: BOE TECHNOLOGY GROUP CO., LTD.
Reel/Frame 052736/0618 →
Priority Claims (2)
CN 201711176350.3 · Nov 22, 2017 · national
CN 201810360225.6 · Apr 20, 2018 · national
Continuity (1)
Related Publication 20200389415A1 · Dec 10, 2020
Cited By (1)
US 12,362,910