IP Library › Granted Patent US 11,546,864
Granted Patent B2
US 11,546,864 · App. 17/248,447 · Granted Jan 3, 2023

Uplink power control in dual connectivity

Inventors: Aris Papasakellariou (Houston, TX); Jung Hyun Bae (San Diego, CA)
Assignee: Samsung Electronics Co., Ltd.
H04W52/346H04L41/0803H04W24/10H04W52/36H04W72/044H04W72/1278H04W74/0833H04W88/06
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,546,864
App. No.
17/248,447
Granted
Jan 3, 2023
Kind
B2
Abstract

Methods and apparatuses for managing dual connectivity. A method for operating a UE includes receiving a configuration for dynamic power sharing (DPS) between transmissions on a master cell group (MCG) and transmissions on a secondary cell group (SCG) and determining a time offset as a function of sub-carrier spacing (SCS) configurations and of configurations for a PUSCH processing capability on the MCG and on the SCG. The method further includes determining a maximum power for a PUSCH transmission on the SCG, at a beginning of the PUSCH transmission on the SCG, when each of the transmissions on the MCG is scheduled by a downlink control information (DCI) format in a PDCCH reception that ends at least the time offset before the beginning of the PUSCH transmission on the SCG. The method further includes transmitting the transmissions on the MCG and the PUSCH transmission on the SCG.

Claims (73)

1. A method for a user equipment (UE), the method comprising:

receiving a configuration for dynamic power sharing (DPS) between transmissions on a master cell group (MCG) and transmissions on a secondary cell group (SCG);

determining a time offset T offset as a function of sub-carrier spacing (SCS) configurations and of configurations for a physical uplink shared channel (PUSCH) processing capability on the MCG and on the SCG;

determining a maximum power for a PUSCH transmission on the SCG, at a beginning of the PUSCH transmission on the SCG, when each of the transmissions on the MCG is scheduled by a downlink control information (DCI) format in a physical downlink control channel (PDCCH) reception that ends at least the T offset before the beginning of the PUSCH transmission on the SCG; and

transmitting the transmissions on the MCG and the PUSCH transmission on the SCG, wherein a power for the PUSCH transmission on the SCG is not larger than the maximum power.

2. The method of claim 1 , wherein the function is one of:

a first maximum between a processing time for multiplexing uplink control information (UCI) in a PUSCH transmission on the MCG and a processing time for multiplexing UCI in a PUSCH transmission on the SCG, wherein the UCIs do not include a channel state information (CSI) report triggered by a DCI format, and

a second maximum between a processing time for multiplexing a CSI report in a PUSCH transmission on the MCG and a processing time for multiplexing a CSI report in a PUSCH transmission on the SCG, wherein the CSI reports are triggered by a DCI format.

3. The method of claim 2 , further comprising transmitting an indication for a DPS capability to determine the T offset according to the first maximum or according to the second maximum.

4. The method of claim 1 , further comprising:

determining a total power {circumflex over (P)} MCG actual for transmissions on the MCG that overlap with a PUSCH transmission on the SCG;

receiving a configuration for a maximum power P Total NR-DC for transmissions on the MCG and on the SCG; and

receiving a configuration for a maximum power P SCG for transmissions on the SCG,

wherein:

the maximum power for the PUSCH transmission on the SCG is a minimum between {circumflex over (P)} SCG and {circumflex over (P)} Total NR-DC −{circumflex over (P)} MCG actual ,

{circumflex over (P)} SCG is a linear value of P SCG , and

P Total NR-DC is a linear value of P Total NR-DC .

5. The method of claim 1 , further comprising determining a total power {circumflex over (P)} MCG actual to include a power for a transmission on the MCG that is adjusted based on a value of a transmission power control (TPC) command in a second DCI format only when the second DCI format is provided by a second PDCCH reception that ends at least the T offset before the beginning of the PUSCH transmission on the SCG, wherein the transmission on the MCG is configured by higher layer signaling.

6. The method of claim 1 , wherein the transmissions on the MCG include at least one of a PUSCH, a physical uplink control channel (PUCCH), a physical random access channel (PRACH), and a sounding reference signal (SRS).

7. A user equipment (UE) comprising:

a processor configured to determine:

a time offset T offset as a function of sub-carrier spacing (SCS) configurations and of configurations for a physical uplink shared channel (PUSCH) processing capability on a master cell group (MCG) and on a secondary cell group (SCG), and

a maximum power for a PUSCH transmission on the SCG, at a beginning of the PUSCH transmission on the SCG, when each of transmissions on the MCG is scheduled by a downlink control information (DCI) format in a physical downlink control channel (PDCCH) reception that ends at least the T offset before the beginning of the PUSCH transmission on the SCG; and

a transceiver, operably coupled to the processor, the transceiver configured to:

receive a configuration for dynamic power sharing (DPS) between the transmissions on the MCG and transmissions on the SCG, and

transmit the transmissions on the MCG and the PUSCH transmission on the SCG, wherein a power for the PUSCH transmission on the SCG is not larger than the maximum power.

8. The UE of claim 7 , wherein the function is one of:

a first maximum between a processing time for multiplexing uplink control information (UCI) in a PUSCH transmission on the MCG and a processing time for multiplexing UCI in a PUSCH transmission on the SCG, wherein the UCIs do not include a channel state information (CSI) report triggered by a DCI format, and

a second maximum between a processing time for multiplexing a CSI report in a PUSCH transmission on the MCG and a processing time for multiplexing a CSI report in a PUSCH transmission on the SCG, wherein the CSI reports are triggered by a DCI format.

9. The UE of claim 8 , wherein the transceiver is further configured to transmit an indication for a DPS capability to determine the T offset according to the first maximum or according to the second maximum.

10. The UE of claim 7 , wherein:

the processor is further configured to determine a total power {circumflex over (P)} MCG actual for transmissions on the MCG that overlap with a PUSCH transmission on the SCG,

the transceiver is further configured to receive:

a configuration for a maximum power P Total NR-DC for transmissions on the MCG and on the SCG, and

a configuration for a maximum power P SCG for transmissions on the SCG,

the maximum power for the PUSCH transmission on the SCG is a minimum between {circumflex over (P)} SCG and {circumflex over (P)} Total NR-DC −{circumflex over (P)} MCG actual ,

{circumflex over (P)} SCG is a linear value of P SCG , and

{circumflex over (P)} Total NR-DC is a linear value of P Total NR-DC .

11. The UE of claim 7 , wherein the processor is further configured to determine a total power {circumflex over (P)} MCG actual to include a power for a transmission on the MCG that is adjusted based on a value of a transmission power control (TPC) command in a second DCI format only when the second DCI format is provided by a second PDCCH reception that ends at least the T offset before the beginning of the PUSCH transmission on the SCG and wherein the transmission on the MCG is configured by higher layer signaling.

12. The UE of claim 7 , wherein the transmissions on the MCG include at least one of a PUSCH, a physical uplink control channel (PUCCH), a physical random access channel (PRACH), and a sounding reference signal (SRS).

13. A network node comprising:

a processor configured to determine a time offset as a maximum of a first time offset and a second time offset, wherein:

the first time offset is applicable on the network node, and

the second time offset is applicable on a second network node; and

a transceiver, operably connected to the processor, the transceiver configured to:

transmit a configuration for dynamic power sharing (DPS) between transmissions to the network node and transmissions to the second network node;

transmit a first physical downlink control channel (PDCCH) that provides a first downlink control information (DCI) format, wherein:

the first DCI format schedules a transmission of a first physical uplink shared channel (PUSCH),

a beginning of transmission of first PUSCH transmission is after an end of the first PDCCH transmission by at least the time offset; and

receive the first PUSCH.

14. The network node of claim 13 , wherein the processor is further configured to determine the first time offset based on one of:

a first processing time for multiplexing a channel state information (CSI) report triggered by a DCI format in a PUSCH, and

a second processing time for multiplexing uplink control information (UCI) in a PUSCH, wherein the UCI does not include a CSI report triggered by a DCI format.

15. The network node of claim 14 , wherein:

the first PUSCH is received from a user equipment (UE), and

determination of the first time offset is based on an indication received from the UE of a DPS capability to determine a power for the first PUSCH transmission based on the first processing time or based on the second processing time.

16. The network node of claim 13 , wherein:

the first PUSCH transmission includes a channel state information (CSI) report triggered by the first DCI format, and

the first time offset is equal to a processing time for a PUSCH transmission that does not include a CSI report triggered by a DCI format.

17. The network node of claim 13 , wherein:

the transceiver is further configured to transmit a second PDCCH that provides a second DCI format,

the second DCI format provides a transmission power control (TPC) command with a value adjusting a power of a second PUSCH transmission,

the second PUSCH transmission is configured by higher layer signaling, and

a beginning of the second PUSCH transmission is after an end of the second PDCCH transmission by at least the time offset.

18. The network node of claim 13 , wherein:

the transceiver is further configured to transmit a second PDCCH that provides a second DCI format,

the second DCI format triggers a transmission of a physical random access channel (PRACH), and

a beginning of the PRACH transmission is after an end of the second PDCCH transmission by at least the time offset.

19. The network node of claim 13 , wherein:

the transceiver is further configured to transmit a second PDCCH that provides a second DCI format,

the second DCI format triggers a transmission of a sounding reference signal (SRS), and

a beginning of the SRS transmission is after an end of the second PDCCH transmission by at least the time offset.

20. The network node of claim 13 , wherein the transceiver is further configured to transmit a physical downlink shared channel (PDSCH) that provides the second time offset.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 25, 2021
From: PAPASAKELLARIOU, ARIS; BAE, JUNG HYUN
To: SAMSUNG ELECTRONICS CO., LTD.
Reel/Frame 055024/0288 →
Continuity (4)
Provisional Application 63064064 · Aug 11, 2020
Provisional Application 63050364 · Jul 10, 2020
Provisional Application 62976649 · Feb 14, 2020
Related Publication 20210258891A1 · Aug 19, 2021