PDCCH monitoring after DRX configuration or reconfiguration
A method and apparatus for a user equipment (UE) operating based on a DRX (Discontinuous Reception) configuration are disclosed. According to these, the UE receives a message including configuration or reconfiguration of DRX; and monitors a PDCCH (Physical Downlink Control Channel) during an active time according to the configuration or reconfiguration of DRX. Here, the active time includes a time period during a PDCCH indicating a new transmission has not been received after receiving the message including configuration or reconfiguration of DRX.
1. A method for a user equipment (UE) operating based on a DRX (Discontinuous Reception) configuration, the method comprising:
receiving a message including a DRX configuration or reconfiguration; and
monitoring a PDCCH (Physical Downlink Control Channel) during an active time according to the DRX configuration or reconfiguration,
wherein the active time includes a first time period during a first PDCCH indicating a new transmission by the UE has not been received after successful reception of a random access response for a preamble not selected by the UE, a second time period during a second PDCCH indicating a new transmission by the UE has not been received after receiving the message including the DRX configuration or reconfiguration, and a third time period during which a scheduling request is sent on a PUCCH (Physical Uplink Control Channel) and is pending,
wherein the UE has a capability of supporting a scheduling request prohibition mechanism as it applies to a first scheduling request in response to receiving the message including the DRX configuration or reconfiguration such that the third time period of the active time is not activated in response to receiving the message, and
wherein the UE monitors the second PDCCH during the second time period of the active time in response to the scheduling request prohibition mechanism being applied to the first scheduling request after receiving the message.
2. The method of claim 1 , wherein the active time includes the second time period even when a scheduling request is not sent on a PUCCH (Physical Uplink Control Channel) and is not pending.
3. The method of claim 1 , wherein the UE starts DRX-inactivity timer after receiving the second PDCCH.
4. The method of claim 3 , wherein the UE doesn't use a DRX related timer before receiving the second PDCCH, based on the UE not being configured for DRX when receiving the message including the DRX configuration or reconfiguration.
5. The method of claim 3 , wherein the UE uses a DRX related timer before receiving the second PDCCH, based on the UE being configured for DRX when receiving the message including the DRX configuration or reconfiguration.
6. A user equipment (UE) configured to operate based on a DRX (Discontinuous Reception) configuration, the UE comprising:
a transceiver configured to receive a message including a DRX configuration or reconfiguration; and
a processor configured to control the transceiver and to monitor a PDCCH (Physical Downlink Control Channel) during an active time according to the DRX configuration or reconfiguration,
wherein the processor further controls the transceiver based on the active time,
wherein the active time includes a first time period during a first PDCCH indicating a new transmission by the UE has not been received after successful reception of a random access response for a preamble not selected by the UE, a second time period during a second PDCCH indicating a new transmission by the UE has not been received after receiving the message including the DRX configuration or reconfiguration, and a third time period during which a scheduling request is sent on a PUCCH (Physical Uplink Control Channel) and is pending,
wherein the UE has a capability of supporting a scheduling request prohibition mechanism as it applies to a first scheduling request in response to receiving the message including the DRX configuration or reconfiguration such that the third time period of the active time is not activated in response to receiving the message, and
wherein the UE monitors the second PDCCH during the second time period of the active time in response to the scheduling request prohibition mechanism being applied to the first scheduling request after receiving the message.
7. The UE of claim 6 , wherein the processor further controls the transceiver based on the active time including the second time period even when a scheduling request is not sent on a PUCCH (Physical Uplink Control Channel) and is not pending.
8. The UE of claim 6 , wherein the processor starts a DRX-inactivity timer after receiving the second PDCCH.
9. The UE of claim 8 , wherein the processor doesn't use a DRX related timer before receiving the second PDCCH, based on the UE not being configured for DRX when receiving the message including the DRX configuration or reconfiguration.
10. The UE of claim 8 , wherein the processor uses a DRX related timer before receiving the second PDCCH, based on the UE being configured for DRX when receiving the message including the DRX configuration or reconfiguration.