IP Library › Granted Patent US 11,555,402
Granted Patent B2
US 11,555,402 · App. 17/119,281 · Granted Jan 17, 2023

Split flow probe for reactive reservoir sampling

Inventors: Christopher Michael Jones (Katy, TX); Anthony Herman van Zuilekom (Houston, TX); Darren George Gascooke (Houston, TX)
Assignee: Halliburton Energy Services, Inc.
E21B49/0875E21B33/12E21B34/08E21B49/081E21B49/082
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,555,402
App. No.
17/119,281
Granted
Jan 17, 2023
Kind
B2
Abstract

A downhole tool comprises at least one inlet and a first pump coupled to the at least one inlet via a first flow line. The first pump is to pump at a first pump rate to extract fluid via the at least one inlet from a subsurface formation in which a borehole is created and in which the downhole tool is to be positioned. A sample chamber is coupled to the inlet via a second flow line, and a second pump is coupled to the inlet via the second flow line. The second pump is to pump at a second pump rate to extract the fluid via the at least one inlet from the subsurface formation and for storage in the sample chamber. The first pump rate is greater than the second pump rate.

Claims (41)

1. A method comprising:

positioning a downhole tool in a borehole at a location from which a fluid is to be extracted from a subsurface formation surrounding the borehole;

extracting the fluid from the subsurface formation via at least one inlet of the downhole tool using a first pump that is coupled to the at least one inlet through a first flow line, wherein the fluid initially extracted is composed of at least a portion of drilling fluid filtrate;

monitoring a level of a reactant in the fluid; and

in response to determining that the level of the reactant in the fluid is greater than a fluid reactant threshold,

closing a first valve in the first flow line to stop flow of the fluid through the first flow line;

opening a second valve in a second flow line to enable flow of the fluid through the second flow line based on pumping by a second pump coupled to the at least one inlet through the second flow line, wherein a pump rate of the first pump is greater than a pump rate of the second pump; and

capturing the fluid extracted from the subsurface formation and flowing through the second flow line in a sample chamber.

2. The method of claim 1 , wherein the at least one inlet comprises a probe.

3. The method of claim 1 , further comprising:

in response to determining that the level of the reactant in the fluid is greater than the fluid reactant threshold, activating the second pump.

4. The method of claim 1 , wherein a surface area of the first flow line is greater than a surface area of the second flow line.

5. The method of claim 1 , wherein a distance from the at least one inlet to the second pump is greater than a distance from the at least one inlet to the second pump.

6. The method of claim 1 , wherein a diameter of the first flow line is greater than a diameter of the second flow line.

7. The method of claim 1 ,

wherein the at least one inlet comprises a focused probe that includes a center probe and an outer guard probe, and

wherein extracting the fluid from the subsurface formation via the at least one inlet comprises extracting the fluid from the center probe.

8. The method of claim 7 , further comprising:

extracting a fluid from the outer guard probe; and

determining fluid properties by pulsing the fluid on the outer guard probe.

9. The method of claim 1 , further comprising:

wherein the downhole tool comprises a first packer and a second packer,

wherein the at least one inlet comprises a lower inlet and an upper inlet that are positioned between the first packer and the second packer,

wherein the upper inlet is positioned above the lower inlet, and

wherein the lower inlet is coupled to the first flow line and the upper inlet is coupled to the second flow line.

10. A system comprising:

a downhole tool to be positioned in a borehole formed in a subsurface formation, the downhole tool comprising,

at least one inlet;

a first flow line having a first valve;

a first pump coupled to the at least one inlet via the first flow line;

a second flow line having a second valve;

a sample chamber coupled to the at least one inlet via the second flow line; and

a second pump coupled to the at least one inlet via the second flow line;

a processor; and

a computer-readable medium having instructions stored thereon that are executable by the processor to cause the processor to,

activate the first pump to cause the first pump to extract at a first pump rate a fluid from the subsurface formation via the at least one inlet;

monitor a level of a reactant in the fluid being extracted by the first pump; and

in response to determining that the level of the reactant in the fluid is greater than a fluid reactant threshold,

close the first valve in the first flow line; and

open the second valve such that fluid being extracted by operation of the second pump at a second pump rate and from the subsurface formation via the at least one inlet is captured in the sample chamber through the second flow line.

11. The system of claim 10 , wherein a distance from the at least one inlet to the first pump is greater than a distance from the at least one inlet to the second pump.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Dec 11, 2020
From: JONES, CHRISTOPHER MICHAEL; VAN ZUILEKOM, ANTHONY HERMAN; GASCOOKE, DARREN GEORGE
To: HALLIBURTON ENERGY SERVICES, INC.
Reel/Frame 054617/0914 →
Continuity (2)
Provisional Application 62972171 · Feb 10, 2020
Related Publication 20210246785A1 · Aug 12, 2021