IP Library › Granted Patent US 11,560,893
Granted Patent B2
US 11,560,893 · App. 16/438,852 · Granted Jan 24, 2023

Method for operation control of compressor and the compressor

Inventors: Takahiro Oguma (Tsubame, JP); Hiroyuki Ota (Tsubame, JP)
Assignee: HOKUETSU INDUSTRIES CO., LTD.
F04C28/24F04B41/02F04B49/002F04B49/06F04B49/20F04C28/06F04C28/08F16K15/18F04B49/03F04C2270/051
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,560,893
App. No.
16/438,852
Granted
Jan 24, 2023
Kind
B2
Abstract

In a method for operation control of a compressor, full-load running in which a gas intake control valve is fully open and a target rotation speed of a drive source is set to a full-load rotation speed that is a maximum rotation speed in a speed control band when pressure of compressed gas supplied to the consumption side is a datum pressure or less is carried out; then no-load running in which the valve is fully closed and a no-load rotation speed is set as the target rotation speed of the drive source when the supply pressure is a no-load running pressure or less that is a pressure higher than the datum pressure is carried out. The no-load running is started from the standard no-load rotation speed, however, after a transition time, the target rotation speed is reduced to a low speed no-load rotation speed.

Claims (35)

1. A method for operation control of a compressor to perform capacity control configured by control of a gas intake rate using a gas intake control valve provided in a gas intake port of a compressor body and by control of a rotation speed of a drive source driving the compressor body so that a pressure of a compressed gas supplied to a consumption side lies within a predetermined range, the capacity control comprising:

full-load running in which the gas intake control valve is fully open and a target rotation speed of the drive source is set to a full-load rotation speed that is a maximum rotation speed in a speed control band when a supply pressure that is the pressure of the compressed gas supplied to the consumption side is equal to or less than a predetermined datum pressure; and

no-load running in which the gas intake control valve is fully closed and a predetermined no-load rotation speed is set as the target rotation speed of the drive source, when the supply pressure is equal to or greater than a no-load running pressure that is a predetermined pressure higher than the datum pressure;

the no-load rotation speed has a predetermined standard no-load rotation speed that is lower than the full-load rotation speed and a low speed no-load rotation speed that is a predetermined rotation speed lower than the standard no-load rotation speed, starting each of the no-load running with the standard no-load rotation speed set as the target rotation speed, when each time the no-load running is performed; and

performing target speed change processing in which the target rotation speed is reduced in speed to the low speed no-load rotation speed after a predetermined transition time has elapsed from the starting of the no-load running, and then continuing to perform the no-load running.

2. The method of claim 1 , wherein the transition time is configured so as to be variable.

3. The method of claim 1 , wherein the target speed change processing is not performed in the no-load running until a discharge gas temperature or a lubrication oil temperature of the compressor body is a predetermined temperature or higher.

4. The method of claim 2 , wherein the target speed change processing is not performed in the no-load running until a discharge gas temperature or a lubrication oil temperature of the compressor body is a predetermined temperature or higher.

5. The method of claim 1 , wherein:

a check valve is provided partway along a passage extending to the consumption side from a discharge port of the compressor body;

the capacity control is performed using a pressure on a secondary side of the check valve as the supply pressure; and

purging is performed during the no-load running by opening a discharge side of the compressor body to the atmosphere at a primary side of the check valve.

6. The method of claim 2 , wherein:

a check valve is provided partway along a passage extending to the consumption side from a discharge port of the compressor body;

the capacity control is performed using a pressure on a secondary side of the check valve as the supply pressure; and

purging is performed during the no-load running by opening a discharge side of the compressor body to the atmosphere at a primary side of the check valve.

7. The method of claim 3 , wherein:

a check valve is provided partway along a passage extending to the consumption side from a discharge port of the compressor body;

the capacity control is performed using a pressure on a secondary side of the check valve as the supply pressure; and

purging is performed during the no-load running by opening a discharge side of the compressor body to the atmosphere at a primary side of the check valve.

8. The method of claim 4 , wherein:

a check valve is provided partway along a passage extending to the consumption side from a discharge port of the compressor body;

the capacity control is performed using a pressure on a secondary side of the check valve as the supply pressure; and

purging is performed during the no-load running by opening a discharge side of the compressor body to the atmosphere at a primary side of the check valve.

9. The method of claim 5 , wherein the purging is performed after the starting of the no-load running and after the transition time has elapsed.

10. The method of claim 6 , wherein the purging is performed after the starting of the no-load running and after the transition time has elapsed.

11. The method of claim 7 , wherein the purging is performed after the starting of the no-load running and after the transition time has elapsed.

12. The method of claim 8 , wherein the purging is performed after the starting of the no-load running and after the transition time has elapsed.

13. A compressor comprising:

a capacity control device configured to perform control of a gas intake rate using a gas intake control valve provided to a gas intake port of a compressor body and to perform control of a rotation speed of a drive source driving the compressor body so that compressed gas is supplied to a consumption side at a pressure lying within a predetermined range;

the capacity control device being configured to

perform full-load running in which the gas intake control valve is fully open and a target rotation speed of the drive source is set to a full-load rotation speed that is a maximum rotation speed in a speed control band when a supply pressure that is the pressure of the compressed gas supplied to the consumption side is equal to or less than a predetermined datum pressure; and

perform no-load running in which the gas intake control valve is fully closed and a predetermined no-load rotation speed is set as the target rotation speed of the drive source, when the supply pressure is equal to or greater than a no-load running pressure that is a predetermined pressure higher than the datum pressure;

start each of the no-load running with a predetermined standard no-load rotation speed that is lower than the full-load rotation speed set as the target rotation speed, when each time the no-load running is performed; and

perform target speed change processing in which the target rotation speed is reduced in speed to a low speed no-load rotation speed that is a predetermined rotation speed lower than the standard no-load rotation speed after a predetermined transition time has elapsed from the starting of the no-load running, and then continue to perform the no-load running.

Assignments (2)
CHANGE OF NAME Recorded Jul 18, 2025
From: HOKUETSU INDUSTRIES CO., LTD.
To: AIRMAN CORPORATION
Reel/Frame 072067/0538 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 12, 2019
From: OGUMA, TAKAHIRO; OTA, HIROYUKI
To: HOKUETSU INDUSTRIES CO., LTD.
Reel/Frame 049446/0016 →
Priority Claims (1)
JP JP2018-139626 · Jul 25, 2018 · national
Continuity (1)
Related Publication 20200032801A1 · Jan 30, 2020