IP Library › Granted Patent US 11,567,493
Granted Patent B2
US 11,567,493 · App. 16/771,956 · Granted Jan 31, 2023

Method and system for controlling communication of a mining and/or construction machine

Inventors: Wesley Santos (Örebro, SE); Roland Pettersson (Örebro, SE); Rickard Egbäck (Kumla, SE); Håkan Lundvall (Lillkyrka, SE)
Assignee: EPIROC ROCK DRILLS AKTIEBOLAG
G05D1/0022G05D1/0088G05D1/0212H04B17/318H04L43/0864E21F17/18G05D2201/021G05D2201/0202
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,567,493
App. No.
16/771,956
Granted
Jan 31, 2023
Kind
B2
Abstract

The present invention relates to a method for 1 for controlling transmission of data in a data communication network, the transmission of data being a transmission of data between a mining and/or construction machine and a network node of said data communication network, said transmission of data being carried out at least partly over a wireless communication link. The method comprises: —estimating a measure of the communication capacity of said wireless link, the estimation being based at least partly on a round-trip time of a transmission over said wireless communication link, and —adapting the data transmission load of said mining and/or construction machine on the wireless communication link on the basis of said measure. The invention also relates to a system and a mining and/or construction machine.

Claims (29)

1. A method for controlling transmission of data in a data communication network, the transmission of data is between a mining and/or construction machine and a network node of said data communication network, said transmission of data being carried out at least partly over a wireless communication link, the method comprising:

estimating, using a processor, a measure of a communication capacity of said wireless communication link, the estimation being based at least partly on a round-trip time of a transmission over said wireless communication link;

adapting, using the processor, a data transmission load of said mining and/or construction machine on the wireless communication link on the basis of said measure; and

comparing, using the processor, the data transmission load a transmission load that the mining and/or construction machine intends to impose on the wireless communication link with said measure of the communication capacity of the wireless communication link, and adapting the data transmission load of said mining and/or construction machine on the wireless communication link on the basis of said comparison.

2. The method according to claim 1 , further comprising: determining the round-trip time by transmitting at least one data packet over the wireless communication link to and/or from the machine; and

determining the round-trip time as the time it takes for a transmitter to receive an acknowledgment of receipt of said at least one data packet from the receiver.

3. The method according to claim 2 , further comprising: transmitting said at least one data packet from said mining and/or construction machine to a network node of said data communication network.

4. The method according to claim 1 , comprising: estimating the measure of the communication capacity of the wireless communication link by means of said mining and/or construction machine.

5. The method according to claim 1 , further comprising: estimating the measure of the communication capacity of the wireless communication link prior to the mining and/or construction machine commencing transmission of data to said network node.

6. A method for controlling transmission of data in a data communication network, the transmission of data is between a mining and/or construction machine and a network node of said data communication network, said transmission of data being carried out at least partly over a wireless communication link the method comprising:

estimating, using a processor, a measure of the communication capacity of said wireless communication link, the estimation being based at least partly on a round-trip time of a transmission over said wireless communication link; and

adapting, using the processor, a data transmission load of said mining and/or construction machine on the wireless communication link on the basis of said measure: when adapting the data transmission load of said mining and/or construction machine on the wireless communication link, prioritising data to be transmitted on the wireless communication link based on the adaptation, wherein lower prioritised data to be transmitted is reduced or stopped from being transmitted to allow transmission of higher prioritised data.

7. The method according to claim 1 , further comprising: determining if transmission load that the mining and/or construction machine imposes and/or intends to impose on the wireless communication link exceeds the estimated available communication capacity, and if the data transmission load exceeds the estimated available capacity, reducing a data transmission rate of the mining and/or construction machine to a data transmission rate resulting in a load being below the estimated capacity of said wireless communication link.

8. The method according to claim 1 , further comprising: determining a plurality of consecutive round-trip times, and controlling the load that the mining and/or construction machine imposes on the wireless communication link on the basis of changes in time of the round-trip time being determined from said plurality of consecutive round-trip delays.

9. The method according to claim 8 , further comprising: increasing the transmission rate of transmission of data from the mining and/or construction machine when the derivative over time of the round-trip time decreases, and/or decreasing the data transmission rate of transmission of data from the mining and/or construction machine when the derivative over time of the round-trip time increases.

10. The method according to claim 1 , further including: when changing a transmission rate of transmission from said mining and/or construction machine, changing the transmission rate to one of a plurality of predefined transmission rates, said predefined transmission rates comprising a maximum transmission rate and at least one lower than said maximum transmission rate.

11. The method according to claim 1 , further comprising: determining a position of the machine, and controlling the data transmission load that the mining and/or construction machine imposes on the wireless communication link on the basis of the round-trip time and said determined position of the machine.

12. The method according to claim 1 , further comprising: estimating said measure of the communication capacity of the wireless communication link on the basis of, in addition to the round-trip time, one or more from the group: jitter, signal strength, the number of lost data packages per unit time, signal-to-noise ratio, bit error rate and/or data throughput.

13. The method according to claim 1 , further comprising: when decreasing the transmission rate of transmission from said mining and/or construction machine, decreasing a transmission rate by any one or more from the group: reducing a video frame rate, reducing a resolution of video frames, reducing a number of transmitted video streams, preventing or reducing transmission of data being less critical than data required for remote control of the mining and/or construction machine and/or less critical than video data.

14. A non-transitory readable medium comprising instructions which, when executed by a computer, cause the computer to perform operations including:

estimating, using a processor, a measure of the communication capacity of a wireless communication link, the estimation being based at least partly on a round-trip time of a transmission over said wireless communication link; and

adapting, using the processor, a data transmission load of said mining and/or construction machine on the wireless communication link on the basis of said measure; and

comparing a transmission load that the mining and/or construction machine imposes and/or intends to impose on the wireless communication link with said measure of the communication capacity of the wireless communication link, and adapting the load of said mining and/or construction machine on the wireless communication link on the basis of said comparison.

15. A system for controlling transmission of data in a data communication network, the transmission of data being a transmission of data between a mining and/or construction machine and a network node of said data communication network, said transmission of data being carried out at least partly over a wireless communication link, the system comprising:

a processor configured to estimate a measure of the communication capacity of said wireless communication link, the estimation being based at least partly on a round-trip time of a transmission over said wireless communication link,

the processor configured to adapt the data transmission load of said mining and/or construction machine on the wireless communication link on the basis of said measure, the processor configured to determine if the data transmission load that the mining and/or construction machine imposes and/or intends to impose on the wireless communication link exceeds the estimated available communication capacity, and if the data transmission load exceeds the estimated available capacity, reducing a data transmission rate of the mining and/or construction machine to a data transmission rate resulting in a load being below the estimated capacity of said wireless communication link.

16. A mining and/or construction machine comprising a system for controlling transmission of data in a data communication network, the transmission of data being a transmission of data between a mining and/or construction machine and a network node of said data communication network, said transmission of data being carried out at least partly over a wireless communication link, the system comprising:

processor configured to estimate a measure of the communication capacity of said wireless communication link, the estimation being based at least partly on a round-trip time of a transmission over said wireless communication link,

the processor configured to adapt the data transmission load of said mining and/or construction machine on the wireless communication link on the basis of said measure, the processor configured to determine if the data transmission load that the mining and/or construction machine imposes and/or intends to impose on the wireless communication link exceeds the estimated available communication capacity, and if the data transmission load exceeds the estimated available capacity, reducing a data transmission rate of the mining and/or construction machine to a data transmission rate resulting in a load being below the estimated capacity of said wireless communication link.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 12, 2020
From: SANTOS, WESLEY; PETTERSSON, ROLAND; EGBÄCK, RICKARD; LUNDVALL, HÅKAN
To: EPIROC ROCK DRILLS AKTIEBOLAG
Reel/Frame 052926/0055 →
Priority Claims (1)
SE 1751633-7 · Dec 22, 2017 · national
Continuity (1)
Related Publication 20210173392A1 · Jun 10, 2021