IP Library › Granted Patent US 11,570,775
Granted Patent B2
US 11,570,775 · App. 16/768,386 · Granted Jan 31, 2023

Method and apparatus for improving in and relating to integrated access and backhaul and non terrestrial networks

Inventors: Mythri Hunukumbure (Staines Middlesex, GB); Yinan Qi (Staines Middlesex, GB)
Assignee: SAMSUNG ELECTRONICS CO., LTD.
H04W72/0453H04L5/0048
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,570,775
App. No.
16/768,386
Granted
Jan 31, 2023
Kind
B2
Abstract

A first relay node in a wireless communication system receives, from a second relay node via a backhaul link, coordination information including an index indicating a density pattern of a second phase tracking reference signal (PTRS). The first relay node transmits, to a terminal, configuration information including information on a first subcarrier offset for a first PTRS. The first relay node transmits to the terminal the first PTRS based on the coordination information and the information on the first subcarrier offset. The first subcarrier offset for the first PTRS is different from a second subcarrier offset for the second PTRS.

Claims (34)

1. A method performed by a first relay node in a wireless communication system, the method comprising:

receiving, from a second relay node via a backhaul link, coordination information including an index indicating a density pattern of a second phase tracking reference signal (PTRS);

transmitting, to a terminal, configuration information including information on a first subcarrier offset for a first PTRS; and

transmitting, to the terminal, the first PTRS based on the coordination information and the information on the first subcarrier offset,

wherein the first subcarrier offset for the first PTRS is different from a second subcarrier offset for the second PTRS.

2. The method of claim 1 , wherein the first PTRS is configured based on a pre-configured pattern which corresponds to either the most dense or the least dense PTRS pattern, and

wherein the index indicates an amount of change of the density pattern of the second PTRS.

3. The method of claim 2 , wherein the first PTRS pattern is for transmitting PTRS on every 2nd symbol.

4. The method of claim 2 , wherein the first PTRS pattern is for transmitting PTRS on all available symbols.

5. The method of claim 2 , wherein the amount of the change is a ratio of 2.

6. The method of claim 5 , wherein the density pattern of the second PTRS indicates at least one of a time density or a frequency density.

7. The method of claim 6 , the frequency density is changed based on the ratio of 2, after the time density is changed based on the ratio of 2.

8. The method of claim 1 , wherein the first subcarrier offset indicates a location of the first PTRS in a physical resource block (PRB), and

wherein the second subcarrier offset indicates a location of the second PTRS in a PRB.

9. The method of claim 1 , wherein at least one chunk including the first PTRS is inserted into middle position of a symbol for transmitting the first PTRS.

10. The method of claim 1 , the first relay node is operated in one of a non-terrestrial network (NTN) and an integrated access and backhaul (IAB) network.

11. A first relay node in a communication system, the base station comprising:

communication interface; and

a controller configured to:

receive, from a second relay node via a backhaul link, coordination information including an index indicating a density pattern of a second phase tracking reference signal (PTRS);

transmit, to a terminal, configuration information including information on a first subcarrier offset for a first PTRS; and

transmit, to the terminal, the first PTRS based on the coordination information and the information on the first subcarrier offset,

wherein the first subcarrier offset for the first PTRS is different from a second subcarrier offset for the second PTRS.

12. The first relay node of claim 11 , wherein the first PTRS is configured based on a pre-configured pattern which corresponds to either the most dense or the least dense PTRS pattern, and

wherein the index indicates an amount of change of the density pattern of the second PTRS.

13. The first relay node of claim 12 , wherein the first PTRS pattern is for transmitting PTRS on every 2nd symbol.

14. The first relay node of claim 12 , wherein the most dense PTRS pattern is for transmitting PTRS on all available symbols.

15. The first relay node of claim 12 , the amount of the change is a ratio of 2.

16. The first relay node of claim 15 , wherein the density pattern of the second PTRS indicates at least one of a time density or a frequency density.

17. The first relay node of claim 16 , the frequency density is changed based on the ratio of 2, after the time density is changed based on the ratio of 2.

18. The first relay node of claim 11 , wherein the first subcarrier offset indicates a location of the first PTRS in a physical resource block (PRB), and

wherein the second subcarrier offset indicates a location of the second PTRS in a PRB.

19. The first relay node of claim 11 , wherein at least one chunk including the first PTRS is inserted into middle position of a symbol for transmitting the first PTRS.

20. The first relay node of claim 11 , the first relay nodes is operated in one of a non-terrestrial network (NTN) and an integrated access and backhaul (IAB) network.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 29, 2020
From: HUNUKUMBURE, MYTHRI; QI, YINAN
To: SAMSUNG ELECTRONICS CO., LTD.
Reel/Frame 052796/0672 →
Priority Claims (1)
GB 1720080 · Dec 1, 2017 · national
Continuity (1)
Related Publication 20200322953A1 · Oct 8, 2020
Cited By (1)
US 12,335,942