IP Library › Granted Patent US 11,607,925
Granted Patent B2
US 11,607,925 · App. 17/775,803 · Granted Mar 21, 2023

Method for a thermal management of a motor vehicle

Inventors: Felix Artmeier (Munich, DE); Niko Fontein (Unterschleissheim, DE); Torsten Frank (Vatterstetten, DE); Alexander Lichtenberger (St. Peter in der Au, AT)
Assignee: Bayerische Motoren Werke Aktiengesellschaft
B60H1/00899B60H1/00278B60H2001/00307B60H2001/00928B60H2001/00949
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,607,925
App. No.
17/775,803
Granted
Mar 21, 2023
Kind
B2
Abstract

A method for thermal management of a motor vehicle includes circulating of coolant, in a first operating state, at least in a motor cooling circuit through a series circuit that includes a motor circuit pump, an electric motor, and a low temperature (LT) radiator where the motor circuit pump is activated and where the coolant flows in a first direction through the LT radiator. The method further includes, time-shifted with respect to the first operating state, circulating of coolant, in a second operating state, at least in a chiller cooling circuit through a series circuit including a chiller, a chiller section pump, the motor circuit pump, and the LT radiator where the chiller section pump is activated, where the motor circuit pump is deactivated, where the coolant flows in a second direction through the LT radiator, and where the second direction is opposed to the first direction.

Claims (8)

1. A method for thermal management of a motor vehicle, comprising the steps of:

circulating of coolant, in a first operating state, at least in a motor cooling circuit through a series circuit comprising a motor circuit pump, an electric motor, and a low temperature radiator, wherein the motor circuit pump is activated and wherein the coolant flows in a first direction through the LT radiator; and

time-shifted with respect to the first operating state, circulating of coolant, in a second operating state, at least in a chiller cooling circuit through a series circuit comprising a chiller, a chiller section pump, the motor circuit pump, and the low temperature radiator, wherein the chiller section pump is activated, wherein the motor circuit pump is deactivated, wherein the coolant flows in a second direction through the low temperature radiator, and wherein the second direction is opposed to the first direction.

2. The method according to claim 1 , further comprising a third operating state with the steps of:

circulating of coolant in a motor/chiller circuit through the electric motor, the chiller, and the chiller section pump; and

circulating, at a same time of circulating of coolant in the motor/chiller circuit, coolant in a high voltage store/chiller circuit with coolant circulating through an energy store, the chiller, the chiller section pump and back to the energy store.

3. The method according to claim 2 , wherein a changeover is carried out between the third operating state and the first operating state in a manner which is dependent on a sum of a waste heat from the electric motor and the energy store.

4. The method according to claim 1 , further comprising in the first operating state, circulating of coolant in a high voltage store/chiller circuit with coolant circulating through an energy store, the chiller, the chiller section pump and back to the energy store.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 10, 2022
From: ARTMEIER, FELIX; FONTEIN, NIKO; FRANK, TORSTEN; LICHTENBERGER, ALEXANDER
To: BAYERISCHE MOTOREN WERKE AKTIENGESELLSCHAFT
Reel/Frame 059885/0012 →
Priority Claims (1)
DE 10 2019 130 803.8 · Nov 14, 2019 · national
Continuity (1)
Related Publication 20220379687A1 · Dec 1, 2022
Cited By (1)
US 12,735,112