IP Library › Granted Patent US 11,689,336
Granted Patent B2
US 11,689,336 · App. 17/365,810 · Granted Jun 27, 2023

Integrated circuit

Inventors: Rojan Chitrakar (Singapore, SG); Lei Huang (Singapore, SG); Yoshio Urabe (Nara, JP)
Assignee: Panasonic Intellectual Property Corporation of America
H04L5/0053H04L5/0007H04L27/2602H04L27/2603H04L27/2613H04W48/12H04W52/0229H04W72/0446H04W72/12H04L27/2601H04W84/12
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,689,336
App. No.
17/365,810
Granted
Jun 27, 2023
Kind
B2
Abstract

The present disclosure provides a transmission apparatus that comprises a first payload generator configured to generate payload of a packet of a first signal type; a second payload generator configured to generate payload of a packet of a second signal type; a packet scheduler that controls the transmission timings of the first and the second packet; and a transmitter which, in operation, transmits, under the timing control of the packet scheduler, the packet of the first signal type followed by the packet of the second signal type.

Claims (32)

1. An integrated circuit, comprising:

control circuitry, which, in operation, controls:

scheduling a 802.11 Beacon frame and a wake-up-radio (WUR) Beacon frame, wherein a transmission of the 802.11 Beacon frame is followed by a transmission of the WUR Beacon frame; and

transmitting the 802.11 Beacon frame and the WUR Beacon frame; and

at least one output, which is coupled to the control circuitry and which, in operation, outputs a signal.

2. The integrated circuit according to claim 1 ,

wherein the WUR Beacon frame includes a duration field which indicates a time period, and sets a Network Allocation Vector (NAV) for the time period.

3. The integrated circuit according to claim 1 ,

wherein the transmission of the WUR Beacon frame is scheduled a determined time after the transmission of the 802.11 Beacon frame.

4. The integrated circuit according to claim 3 ,

wherein the determined time is a Short Interframe Space (SIFS).

5. The integrated circuit according to claim 3 ,

wherein the determined time is less than a Short Interframe Space (SIFS).

6. The integrated circuit according to claim 1 ,

wherein a transmission of any other frames is not scheduled between the transmission of the 802.11 Beacon and the transmission of the WUR Beacon frame.

7. The integrated circuit according to claim 1 ,

wherein the 802.11 Beacon frame and the WUR Beacon frame are scheduled at the same time.

8. An integrated circuit, comprising:

control circuitry, which, in operation, schedules a 802.11 Beacon frame and a wake-up-radio (WUR) Beacon frame, wherein a transmission of the 802.11 Beacon frame is followed by a transmission of the WUR Beacon frame; and

transmission circuitry, which, in operation, transmits the 802.11 Beacon frame and the WUR Beacon frame.

9. The integrated circuit according to claim 8 ,

wherein the WUR Beacon frame includes a duration field which indicates a time period, and sets a Network Allocation Vector (NAV) for the time period.

10. The integrated circuit according to claim 8 ,

wherein the transmission of the WUR Beacon frame is scheduled a determined time after the transmission of the 802.11 Beacon frame.

11. The integrated circuit according to claim 10 ,

wherein the determined time is a Short Interframe Space (SIFS).

12. The integrated circuit according to claim 10 ,

wherein the determined time is less than a Short Interframe Space (SIFS).

13. The integrated circuit according to claim 8 ,

wherein a transmission of any other frames is not scheduled between the transmission of the 802.11 Beacon and the transmission of the WUR Beacon frame.

14. The integrated circuit according to claim 8 ,

wherein the 802.11 Beacon frame and the WUR Beacon frame are scheduled at the same time.

Priority Claims (1)
JP 2017-133120 · Jul 6, 2017 · national
Continuity (2)
Continuation 16619582
Related Publication 20210337558A1 · Oct 28, 2021