IP Library › Granted Patent US 11,753,931
Granted Patent B2
US 11,753,931 · App. 16/019,731 · Granted Sep 12, 2023

Tool string failure control in a bottom hole assembly

Inventor: Jianying Chu (Houston, TX)
Assignee: Halliburton Energy Services, Inc.
E21B47/13H04L12/40E21B47/18
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,753,931
App. No.
16/019,731
Granted
Sep 12, 2023
Kind
B2
Abstract

A system for remediating a bus sectioning events, such as a bus failure or controlled sectioning, comprises a plurality of nodes coupled together by a bus in a tool string used in a bottom hole assembly (BHA). Each node comprises a bus switch configured to isolate the node from a section of the bus. Upon a bus sectioning event, a first sub-tool string and a second sub-tool string are created on either side of the bus section to be isolated, each of which independently operate in parallel. Communication between the first and second sub-tool buses is established through respective nodes connected to each sub-tool bus that comprise a wireless communication transceiver configured to convey signals along the tool string. Alternatively or additionally, each of the sub-tool buses has a node with telemetry for communicating with the surface. Accordingly, each of the sub-tool busses continues independently operating normally.

Claims (11)

1. A method, comprising:

detecting a failure has occurred in a bus section in a tool string used in a bottom hole assembly (BHA) positioned in a borehole; and

in response to detecting the failure,

isolating the bus section by disconnecting the bus section at a first node of the tool string from a first side of the bus section and disconnecting the bus section at a second node of the tool string from a second side of the bus section that is below the bus section relative to the surface of the borehole, wherein isolating the bus section creates a first sub-bus on the first side comprising the first node and a second sub-bus on the second side comprising the second node;

operating the first sub-bus independently of the second sub-bus;

communicating the signals from the first sub-bus to the surface of the borehole with a first telemetry; and

communicating the signals from the second sub-bus to the surface of the borehole with a second telemetry.

2. The method of claim 1 , wherein the first telemetry operates and the second telemetry is not used in normal operations without the detection of the failure.

3. The method of claim 2 , wherein the second telemetry comprises wireless communications.

4. The method of claim 1 , wherein operating the first sub-bus independently of the second sub-bus comprises operating the first sub-bus in parallel with operating the second sub-bus.

5. The method of claim 1 , wherein operating the first sub-bus independently of the second sub-bus comprises generating bus signals associated with the first sub-bus and bus signals associated with the second sub-bus.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 3, 2020
From: CHU, JIANYING
To: HALLIBURTON ENERGY SERVICES, INC.
Reel/Frame 051408/0569 →
Continuity (1)
Related Publication 20200003047A1 · Jan 2, 2020