IP Library › Granted Patent US 11,770,776
Granted Patent B2
US 11,770,776 · App. 16/272,838 · Granted Sep 26, 2023

Simultaneous transmission in multiple timing advance groups

Inventors: Anthony Edet Ekpenyong (Houston, TX); Ralf Matthias Bendlin (Plano, TX); Pierre Bertrand (Antibes, FR)
Assignee: TEXAS INSTRUMENTS INCORPORATED
H04W52/325H04W74/0833H04W52/281H04W52/40H04W52/48
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,770,776
App. No.
16/272,838
Granted
Sep 26, 2023
Kind
B2
Abstract

Systems and methods for specifying UE power control allocation for simultaneous transmission of PRACH in a secondary serving cell and PUCCH/PUSCH/SRS in a different serving cell in another timing advance group are disclosed. Rules are provided for prioritizing transmission of PRACH and/or other UL channels/signals. Additionally, UE power allocation is controlled for misaligned subframes across different timing advance groups. Latency of UL synchronization for a secondary serving cell is reduced by prioritizing PRACH retransmission.

Claims (58)

1. A method comprising:

performing by one or more processors in a user equipment device,

receiving a Physical Downlink Control Channel (PDCCH) order to initiate a random access procedure on a first serving cell that belongs to a first timing advance group;

identifying a Physical Uplink Control Channel (PUCCH) transmission for a second serving cell other than the first serving cell, the second serving cell belonging to a second timing advance group different than the first timing advance group, wherein if a channel state information (CSI) report is scheduled for the PUCCH transmission, and there is no HARQ-ACK feedback in the same subframe as a Physical Random Access Channel (PRACH) transmission on the first serving cell, the CSI report is dropped and the PRACH transmission is transmitted;

transmitting a PRACH transmission to the first serving cell in a subframe;

transmitting the PUCCH transmission to the second serving cell in the same subframe when the CSI report is not dropped; and

adjusting a transmission power of the PUCCH transmission to prioritize the PRACH transmission over the PUCCH transmission.

2. The method of claim 1 , further comprising:

scaling a transmission power level during the subframe so that a combined transmission power level for the PRACH transmission and the PUCCH transmission does not exceed a maximum transmission power for the user equipment.

3. The method of claim 1 , further comprising:

adjusting the transmission power of the PUCCH transmission during the subframe so that a combined transmission power for the PRACH transmission and the PUCCH transmission does not exceed a maximum transmission power for the user equipment.

4. The method of claim 3 , wherein:

said scaling down results in a PRACH transmission and no transmission of a PUCCH.

5. The method of claim 1 , further comprising:

determining that the PRACH transmission will be retransmitted in a second subframe; and

increasing a power level of the PRACH transmission during the second subframe.

6. The method of claim 1 , further comprising:

determining that the PRACH transmission will be retransmitted in a second subframe;

identifying one or more other uplink transmissions during the second subframe; and

increasing a transmission priority value for the PRACH transmission during the second subframe.

7. The method of claim 1 , further comprising:

determining that the PRACH transmission will be retransmitted in a second subframe;

identifying one or more other uplink transmissions during the second subframe; and

increasing a power level of the PRACH transmission during the second subframe.

8. The method of claim 1 , further comprising:

determining that the PRACH transmission will be retransmitted in a second subframe;

identifying one or more other uplink transmissions during the second subframe;

increasing a transmission priority value for the PRACH transmission during the second subframe; and

increasing a power level of the PRACH transmission during the second subframe.

9. A user equipment device, comprising:

a processor configured to:

identify a Physical Downlink Control Channel (PDCCH) order to initiate a random access procedure on a first serving cell that belongs to a first timing advance group;

identify a Physical Uplink Control Channel (PUCCH) transmission for a second serving cell other than the first serving cell, the second serving cell belonging to a second timing advance group different than the first timing advance group, wherein if a channel state information (CSI) report is scheduled for the PUCCH transmission, and there is no HARQ-ACK feedback in the same subframe as a Physical Random Access Channel (PRACH) transmission on the first serving cell, the CSI report is dropped and the PRACH transmission is transmitted;

generate a PRACH transmission for the first serving cell in a subframe; and

generate the PUCCH transmission for the second serving cell in the same subframe when the CSI report is not dropped; and

a modem configured to, when the CSI report is not dropped, transmit the PUCCH and PRACH transmissions to one or more base stations, and to adjust a transmission power of the PUCCH transmission to prioritize the PRACH transmission over the PUCCH transmission.

10. The user equipment device of claim 9 , the processor further configured to:

scale a transmission power level during the subframe so that a combined transmission power level for the PRACH transmission and the PUCCH transmission does not exceed a maximum transmission power for the user equipment.

11. The user equipment device of claim 9 , the processor further configured to:

adjust the transmission power of the PUCCH transmission during the subframe so that a combined transmission power for the PRACH transmission and the PUCCH transmission does not exceed a maximum transmission power for the user equipment.

12. The user equipment device of claim 11 , wherein:

the scaling down results in no transmission of a PUCCH when a combined transmission of PRACH and PUCCH would exceed a maximum transmission power for the user equipment.

13. The user equipment device of claim 9 , the processor further configured to:

determine that the PRACH transmission will be retransmitted in a second subframe; and

increase a power level of the PRACH transmission during the second subframe.

14. The user equipment device of claim 9 , the processor further configured to:

determine that the PRACH transmission will be retransmitted in a second subframe;

identify one or more other uplink transmissions during the second subframe; and

increase a transmission priority value for the PRACH transmission during the second subframe.

15. The user equipment device of claim 9 , the processor further configured to:

determine that the PRACH transmission will be retransmitted in a second subframe;

identify one or more other uplink transmissions during the second subframe; and

increase a power level of the PRACH transmission during the second subframe.

16. The user equipment device of claim 9 , the processor further configured to:

determine that the PRACH transmission will be retransmitted in a second subframe;

identify one or more other uplink transmissions during the second subframe;

increase a transmission priority value for the PRACH transmission during the second subframe; and

increase a power level of the PRACH transmission during the second subframe.

Continuity (3)
Continuation 13752863 · Jan 29, 2013
Provisional Application 61592155 · Jan 30, 2012
Related Publication 20190191391A1 · Jun 20, 2019
Cited By (1)
US 12,621,029