IP Library Granted Patent US 11,799,765
Granted Patent B2
US 11,799,765 · App. 18/049,248 · Granted Oct 24, 2023

Failure modes in multi-hop networks

Inventors: Mehrdad Shariat (Staines, GB); Milos Tesanovic (Staines, GB)
Assignee: Samsung Electronics Co., Ltd.
H04L45/28H04L41/0654H04L45/22H04L45/302H04L45/44H04L69/40H04W24/04H04W40/12
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,799,765
App. No.
18/049,248
Granted
Oct 24, 2023
Kind
B2
Abstract

The present disclosure relates to a communication method and system for converging a 5th-Generation (5G) communication system for supporting higher data rates beyond a 4th-Generation (4G) system with a technology for Internet of Things (IoT). The present disclosure may be applied to intelligent services based on the 5G communication technology and the IoT-related technology, such as smart home, smart building, smart city, smart car, connected car, health care, digital education, smart retail, security and safety services. Disclosed is a method of fault recovery in a multi-hop network having a plurality of nodes, defining a route, comprising the steps of: determining that a fault exists between two of the plurality of nodes (B, C); performing a hierarchical fault recovery process.

Claims (35)

1. A method performed by a first integrated access and backhaul (IAB) node in a communication system, the method comprising:

receiving, from a central unit (CU), configuration information including information on at least one path for data routing;

identifying a first link for data routing based on the configuration information;

identifying whether a link failure is detected; and

in case that the link failure is detected, selecting a second link for data routing based on the configuration information.

2. The method of claim 1 ,

wherein a second TAB node associated with the first link and a third TAB node associated with the second link are a next hop of the first TAB node, and

wherein the configuration information includes a first mapping between the second TAB node and a first path for data routing to a destination, and a second mapping between the third TAB node and a second path for data routing to the destination.

3. The method of claim 1 , further comprising:

transmitting data via the second link.

4. The method of claim 1 , further comprising:

selecting a bearer corresponding to the second link,

wherein at least one channel is configured for the selected bearer based on a quality of service (QoS) requirement.

5. The method of claim 2 , wherein an indication indicating the link failure is triggered by the second IAB node.

6. The method of claim 1 , wherein the link failure is detected, based on one or more of:

A1 if a projected or estimated change in link quality is below a threshold;

A2 if a quality of service (QoS) of a bearer as previously communicated by the CU can be maintained;

A3 if a loss in QoS of the bearer as communicated by the CU is kept within a pre-determined limit;

A4 if a new number of backhaul bearer is kept below a defined threshold;

A5 if a new set of a data radio bearer (DRB) has similar properties to a previous set of a DRB; or

A6 if a signaling overhead change is within an agreed limit.

7. A first integrated access and backhaul (IAB) node in a communication system, the first IAB node comprising:

an interface configured to transmit and receive signals between a distributed unit (DU) of the first IAB node and a central unit (CU); and

a controller coupled to the interface and configured to control an adaptation layer of a user plane (UP) to:

receive, from the CU via the interface, configuration information including information on at least one path for data routing,

identify a first link for data routing based on the configuration information,

identify whether a link failure is detected, and

in case that the link failure is detected, select a second link for data routing based on the configuration information.

8. The first IAB node of claim 7 ,

wherein a second TAB node associated with the first link and a third TAB node associated with the second link are a next hop of the first TAB node, and

wherein the configuration information includes a first mapping between the second IAB node and a first path for data routing to a destination, and a second mapping between the third IAB node and a second path for data routing to the destination the second IAB node is associated with a first path for routing the data to the destination.

9. The first IAB node of claim 8 ,

wherein the controller is further configured to select a bearer corresponding to the second link, and transmit data via the selected bearer, and

wherein at least one channel is configured for the selected bearer based on a quality of service (QoS) requirement.

10. The first IAB node of claim 8 , wherein an indication indicating the link failure is triggered by the second IAB node.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 24, 2022
From: SHARIAT, MEHRDAD; TESANOVIC, MILOS
To: SAMSUNG ELECTRONICS CO., LTD
Reel/Frame 061520/0183 →
Priority Claims (1)
GB 1807602 · May 10, 2018 · national
Continuity (2)
Continuation 17054147
Related Publication 20230075709A1 · Mar 9, 2023