IP Library › Granted Patent US 11,840,910
Granted Patent B2
US 11,840,910 · App. 17/830,825 · Granted Dec 12, 2023

Systems and methods for creating a fluid communication path between production wells

Inventors: Kinzo Kishida (Kobe, JP); Ge Jin (Houston, TX); Dana M. Jurick (Houston, TX)
Assignee: NEUBREX ENERGY SERVICES, INC.
E21B43/26
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,840,910
App. No.
17/830,825
Granted
Dec 12, 2023
Kind
B2
Abstract

A method creates a fluid communication path between a first production well and a second production well. At least one hydraulic fracture intersects the first production well and is separated from the second production well by a wall thereof. The method includes identifying, from the second production well, a location of the hydraulic fracture of the first production well, and perforating the wall of the second production well at the identified location. The perforating creates the fluid communication path between the production wells. Injection of fracking fluid and proppant at the first production well allows for additional fluids to be extracted from the second production well, thus generating a flow between the two production wells through the hydraulic fracture.

Claims (21)

1. A method for creating a fluid communication path between production wells including a first production well and a second production well, wherein at least one hydraulic fracture intersects the first production well and is separated from the second production well by a wall of the second production well, the method comprising:

identifying, from the second production well, at least one location of the at least one hydraulic fracture of the first production well;

perforating the wall of the second production well at the at least one location, wherein the perforating creates the fluid communication path between the production wells; and

deploying optical sensing fibers in the second production well, the optical sensing fibers being configured to sense, from the second production well, the at least one hydraulic fracture of the first production well.

2. The method of claim 1 , wherein the first and second production wells are first and second horizontal production wells, respectively.

3. The method of claim 1 , comprising:

setting a plug in the second production well prior to perforating the wall of the second production well at the at least one location.

4. The method of claim 1 , comprising:

hydraulically fracturing the first production well to form the at least one hydraulic fracture.

5. The method of claim 1 , comprising:

injecting hydraulic fracturing fluid from the first production well, through the at least one hydraulic fracture, and into the second production well.

6. The method of claim 5 , comprising:

extracting the hydraulic fracturing fluid from the second production well as hydraulic fracturing fluid is injected into the first production well, through the at least one hydraulic fracture, and into the second production well.

7. The method of claim 6 , comprising:

pushing, by pressure, proppant into the first production well and into the at least one hydraulic fracture toward the at least one location of the perforating of the wall of the second production well.

8. The method of claim 1 , comprising:

injecting hydraulic fracturing fluid from the second production well, through the at least one hydraulic fracture, and into the first production well.

9. The method of claim 1 , comprising:

hydraulically fracturing the second production well to form at least one second production well hydraulic fracture;

identifying, from a third production well, at least one location of the at least one second production well hydraulic fracture; and

perforating a wall of the third production well at the at least one location of the at least one second production well hydraulic fracture.

Assignments (2)
CHANGE OF ADDRESS Recorded Oct 16, 2023
From: NEUBREX ENERGY SERVICES, INC.
To: NEUBREX ENERGY SERVICES, INC.
Reel/Frame 065239/0306 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 2, 2022
From: KISHIDA, KINZO; JIN, GE; JURICK, DANA M.
To: NEUBREX ENERGY SERVICES, INC.
Reel/Frame 060087/0267 →
Continuity (2)
Provisional Application 63255730 · Oct 14, 2021
Related Publication 20230120731A1 · Apr 20, 2023
Cited By (2)
US 12,276,186 US 12,534,985