IP Library › Granted Patent US 11,870,843
Granted Patent B2
US 11,870,843 · App. 18/199,220 · Granted Jan 9, 2024

Process-line-changeable process management method, and smart process system

Inventors: Hak Ju Kang (Gyeonggi-do, KR); Hyun Soo Do (Gyeonggi-do, KR)
Assignee: ULALA LAB, INC
H04L67/1008H04L67/1004H04L67/12G05B19/4184G05B19/41865
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,870,843
App. No.
18/199,220
Granted
Jan 9, 2024
Kind
B2
Abstract

A smart process system includes a main server, a plurality of process servers, a worktable, and a plurality of process display terminals arranged on the worktable in order of process and connected to respective process severs. A process-line-changeable process management method includes (a) one server from among servers related to processing of the current step detects that process progress has stopped because a server different from the one server is down; (b) the one server transmits a process command signal to a different process server; and (c) the different process server provides process work information about work after stopping of the process progress to a process display terminal connected to the different process server, on the basis of the process command signal. The main server and the plurality of process servers include a process DB area assigned independently for each process.

Claims (54)

1. A process management method that is performed by a smart process system including a main server, a plurality of process servers, a worktable, and a plurality of process display terminals arranged on the worktable in order of process and respectively connected to the plurality of process servers and is capable of changing a process line, the process management method comprising:

(a) detecting, by one server of the plurality of process servers involved in performing a current process, stop of process progress due to a server different from the one server being down;

(b) transmitting a process command signal to a another process server by the one server; and

(c) providing, by the another process server, process work information of a work after the process progress is stopped to a process display terminal connected to the another process server based on the process command signal,

wherein the main server and the plurality of process servers each include a plurality of process DB areas independently allocated for each process.

2. The process management method of claim 1 , wherein the plurality of process servers prioritize a process DB area corresponding to a preset process among the plurality of process DB areas, collect process state information generated during the process progress in the prioritized process DB area, and transmit the process state information to the main server.

3. The process management method of claim 1 , further comprising:

before the process (a),

receiving workpiece identification information from a workpiece sensor previously installed on the worktable by one process server of the plurality of process servers, and transmitting the workpiece identification information to the main server;

transmitting, by the main server, work description information to the one process server based on the work identification information;

providing, by the one process server, the work description information to a process display terminal connected to the one process server and controlling activation of a process apparatus corresponding to the work description information; and

collecting, by the one process server, process state information generated based on work performed of the process apparatus in a prioritized process DB area and transmitting the process state information to the main server,

wherein the work description information includes at least one of performance method information, component information, precaution information, error solution information, and process apparatus description information according to a preset work sequence for each process.

4. The process management method of claim 1 , wherein

the worktable is arranged in a form of a line and configured to move a workpiece to a position, in which a next process is performed, along the line when one work process is finished,

the plurality of process display terminals and the plurality of process servers are arranged at positions respectively corresponding to each process on the worktable, and

the main server is one of a local server and a cloud server and controlled by a manager terminal.

5. The process management method of claim 4 , wherein, in the process (c),

automatically moving a workpiece placed on a worktable line corresponding to the server being down to a worktable line corresponding to the another process server.

6. The process management method of claim 1 , wherein, in the process (a), when the server being down is a first process server, detecting, by the main server, absence of a LIVE signal periodically transmitted by the first process server for a preset time.

7. The process management method of claim 6 , wherein, in the process (b),

transmitting, by the main server, process state information received from the first process server and work description information corresponding to a first process work together with the process command signal to a second process server, and

the work description information includes at least one of performance method information, component information, precaution information, error solution information, and process apparatus description information according to a work sequence to be performed subsequently after the first process work is stopped.

8. The process management method of claim 7 , wherein, in the process (c),

providing, by the second process server, the work description information to a second process display terminal based on the process state information received from the main server to subsequently perform the first process work;

canceling prioritization of a second process DB area and changing the prioritization to a first process DB area by the second process server; and

collecting process state information generated during the first process work subsequently performed in the first process DB area and transmitting the process state information to the main server by the second process server.

9. The process management method of claim 1 , wherein, in the process (a),

when the server being down is the main server, detecting absence of a transmission signal of work description information corresponding to a first process work received from the main server for a preset time by a first process server; and

canceling prioritization of a first process DB area by the first process server.

10. The process management method of claim 9 , wherein

work description information corresponding to all processes to be performed on the worktable is stored in advance in the plurality of process DB areas included in the first process server, and

the work description information includes at least one of performance method information, component information, precaution information, error solution information, and process apparatus description information according to a preset work sequence for each process.

11. The process management method of claim 9 , wherein, in the process (b),

transmitting, by the first process server, a main server change signal notifying that the main server is changed to the first process server to the plurality of process servers except for the first process server, and

transmitting, by the first process server, first process state information collected so far and work description information corresponding to the first process work together with the process command signal to a second process server,

the work description information includes at least one of performance method information, components information, precaution information, error solution information, and process apparatus description information according to a work sequence to be performed subsequently after the first process work is stopped.

12. The process management method of claim 11 , wherein, in the process (c),

providing, by the second process server, the work description information to a second process display terminal based on the process state information received from the first process server to subsequently perform the first process work;

canceling prioritization of a second process DB area and changing the prioritization to a first process DB area by the second process server; and

collecting process state information generated during the first process work subsequently performed in the first process DB area and transmitting the process state information to the first process server by the second process server.

13. The process management method of claim 9 , further comprising:

when the main server is recovered,

transmitting, by the main server, a main server recovery signal to the plurality of process servers;

transmitting, by the first process server, process state information received from the plurality of process servers except for the first process server to the main server according to the main server recovery signal;

prioritizing, by the first process server, the first process DB area; and

updating, by the main server, information collected in the plurality of process DB areas included in the main server based on the process state information received from the first process server.

14. A smart process system that performs a process management method capable of changing a process line, the smart process system comprising:

a main server;

a plurality of process servers;

a worktable; and

a plurality of process display terminals arranged on the worktable in order of process and respectively connected to the plurality of process servers;

wherein a process of performing the process management method capable of changing the process line comprises detecting, by one server of the plurality of process serves involved in performing a current process, stop of process progress due to a server different from the one server being down, transmitting a process command signal to a another process server by the one server, and providing, by the another process server, process work information of a work after the process progress is stopped to a process display terminal connected to the another process server based on the process command signal, and

the main server and the plurality of process servers each include a plurality of process DB areas independently allocated for each process.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 22, 2023
From: KANG, HAK JU; DO, HYUN SOO
To: ULALA LAB. INC
Reel/Frame 063714/0693 →
Priority Claims (1)
KR 10-2020-0174158 · Dec 14, 2020 · national
Continuity (2)
Continuation PCTKR2021002937 · Mar 10, 2021
Related Publication 20230291793A1 · Sep 14, 2023