IP Library › Granted Patent US 11,903,071
Granted Patent B2
US 11,903,071 · App. 17/821,037 · Granted Feb 13, 2024

Beam failure recovery and related timing determination techniques

Inventors: Tianyang Bai (Somerville, NJ); Yan Zhou (San Diego, CA); Kiran Venugopal (Green Brook, NJ); Jung Ho Ryu (Fort Lee, NJ); Tao Luo (San Diego, CA); Junyi Li (Fairless Hills, PA)
Assignee: QUALCOMM Incorporated
H04W76/19H04W16/28H04W72/1268H04W72/21H04W72/23H04W76/15
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,903,071
App. No.
17/821,037
Granted
Feb 13, 2024
Kind
B2
Abstract

Aspects of the present disclosure provide techniques for beam failure detection and related timing determinations, such as for applying a default beam after beam failure recovery response (BFRR) message. A method by a user equipment (UE) may include detecting failure of a beam associated with a first cell. The detecting can include performing beam failure detection (BFD) of a beam pair link (BPL) associated with the first cell (e.g., secondary cell (Scell)). The first cell can be in carrier aggregation (CA) with a second cell. The UE may send a beam failure recovery request (BFRQ) message on a second cell (e.g., a primary cell (Pcell)). The BFRQ message can include a candidate recovery beam for the first cell. The UE can receive a BFRR message on the second cell and determine a duration from reception of the BFRR message until using a default beam for communications on the first cell.

Claims (51)

1. An apparatus configured for wireless communications, comprising:

a memory comprising computer-executable instructions; and

a processor configured to execute the computer-executable instructions and cause the apparatus to:

receive a beam failure recovery response (BFRR) message on a second cell, wherein the BFRR message is associated with failure of a beam associated with a first cell; and

communicate on the first cell using a default beam after a duration starting from reception of the BFRR message, wherein the duration comprises a larger of a first duration of a fixed number of symbols based on a first subcarrier spacing (SCS) of the first cell and a second duration of the fixed number of symbols based on a second SCS of the second cell.

2. The apparatus of claim 1 , wherein the processor is configured to execute the computer-executable instructions and cause the apparatus to:

detect failure of the beam based on performing beam failure detection (BFD) of a beam pair link (BPL) associated with the first cell.

3. The apparatus of claim 1 , wherein the processor is configured to execute the computer-executable instructions and cause the apparatus to:

send a beam failure recovery request (BFRQ) message on the second cell.

4. The apparatus of claim 3 , wherein the default beam comprises a candidate recovery beam for the first cell indicated in the BFRQ message.

5. The apparatus of claim 3 , wherein the processor being configured to execute the computer-executable instructions and cause the apparatus to send the BFRQ message comprises the processor being configured to execute the computer-executable instructions and cause the apparatus to:

send a scheduling request (SR) on the second cell in a physical uplink control channel (PUCCH); and

send a medium access control (MAC) control element (CE) in a physical uplink shared channel (PUSCH), the MAC-CE including a component carrier (CC) index of the first cell and an indication of a candidate recovery beam.

6. The apparatus of claim 3 , wherein the processor configured to execute the computer-executable instructions and cause the apparatus to indicate the determined duration in the BFRQ message.

7. The apparatus of claim 1 , wherein the duration is configured by a base station (BS), preconfigured at the apparatus according to a wireless standard, or determined from a predefined rule.

8. The apparatus of claim 1 , wherein the duration comprises a larger of a time to update to the default beam in the first cell and a time to update to the default beam in the second cell.

9. The apparatus of claim 1 , wherein the duration is based on a capability of the apparatus.

10. The apparatus of claim 9 , wherein the capability of the apparatus comprises a beam switch latency capability.

11. The apparatus of claim 1 , wherein the processor being configured to execute the computer-executable instructions and cause the apparatus to determine the duration comprises the processor being configured to execute the computer-executable instructions and cause the apparatus to:

determine the duration when the first SCS of the first cell is equal to or smaller than the second SCS of the second cell.

12. The apparatus of claim 1 , wherein the processor being configured to execute the computer-executable instructions and cause the apparatus to communicate on the first cell using the default beam comprises the processor being configured to execute the computer-executable instructions and cause the apparatus to:

use the default beam for at least one of: receiving a physical downlink shared channel (PDSCH) transmission, receive a physical downlink control channel (PDCCH) transmission, send a physical uplink control channel (PUCCH) transmission, or send a sounding reference signal (SRS).

13. A method for wireless communication by a user equipment (UE), comprising:

receiving a beam failure recovery response (BFRR) message on a second cell, wherein the BFRR message is associated with failure of a beam associated with a first cell; and

communicating on the first cell using a default beam after a duration starting from reception of the BFRR message, wherein the duration comprises a larger of a first duration of a fixed number of symbols based on a first subcarrier spacing (SCS) of the first cell and a second duration of the fixed number of symbols based on a second SCS of the second cell.

14. The method of claim 13 , further comprising:

detecting the failure of the beam based on performing beam failure detection (BFD) of a beam pair link (BPL) associated with the first cell.

15. The method of claim 13 , further comprising sending a beam failure recovery request (BFRQ) message on the second cell.

16. The method of claim 15 , wherein the default beam comprises a candidate recovery beam for the first cell indicated in the BFRQ message.

17. The method of claim 15 , wherein sending the BFRQ message comprises:

sending a scheduling request (SR) on the second cell in a physical uplink control channel (PUCCH); and

sending a medium access control (MAC) control element (CE) in a physical uplink shared channel (PUSCH), the MAC-CE including a component carrier (CC) index of the first cell and an indication of a candidate recovery beam.

18. The method of claim 15 , further comprising:

indicating the determined duration in the BFRQ message.

19. The method of claim 13 , wherein the duration is configured by a base station (BS), preconfigured at the UE according to a wireless standard, or determined from a predefined rule.

20. The method of claim 13 , wherein the duration comprises a larger of a time to update to the default beam in the first cell and a time to update to the default beam in the second cell.

21. The method of claim 13 , wherein the duration is based on a capability of the UE.

22. The method of claim 21 , wherein the capability of the UE comprises a beam switch latency capability.

23. The method of claim 13 , further comprising determining the duration when the first SCS of the first cell is equal to or smaller than the second SCS of the second cell.

24. The method of claim 13 , wherein communicating on the first cell using a default beam comprises:

using the default beam for at least one of: receiving a physical downlink shared channel (PDSCH) transmission, receiving a physical downlink control channel (PDCCH) transmission, sending a physical uplink control channel (PUCCH) transmission, or sending a sounding reference signal (SRS).

25. An apparatus for wireless communication, comprising:

means for receiving a beam failure recovery response (BFRR) message on a second cell, wherein the BFRR message is associated with failure of a beam associated with a first cell; and

means for communicating on the first cell using a default beam after a duration starting from reception of the BFRR message, wherein the duration comprises a larger of a first duration of a fixed number of symbols based on a first subcarrier spacing (SCS) of the first cell and a second duration of the fixed number of symbols based on a second SCS of the second cell.

26. The apparatus of claim 25 , wherein the duration is configured by a base station (BS), preconfigured at the apparatus according to a wireless standard, or determined from a predefined rule.

27. The apparatus of claim 25 , wherein the duration comprises a larger of a time to update to the default beam in the first cell and a time to update to the default beam in the second cell.

28. A non-transitory computer-readable medium comprising computer-executable instructions that, when executed by a processor of an apparatus, cause the apparatus to:

receive a beam failure recovery response (BFRR) message on a second cell, wherein the BFRR message is associated with failure of a beam associated with a first cell; and

communicate on the first cell using a default beam after a duration starting from reception of the BFRR message, wherein the duration comprises a larger of a first duration of a fixed number of symbols based on a first subcarrier spacing (SCS) of the first cell and a second duration of the fixed number of symbols based on a second SCS of the second cell.

29. The non-transitory computer-readable medium of claim 28 , wherein the duration is configured by a base station (BS), preconfigured at the apparatus according to a wireless standard, or determined from a predefined rule.

30. The non-transitory computer-readable medium of claim 28 , wherein the duration comprises a larger of a time to update to the default beam in the first cell and a time to update to the default beam in the second cell.

Assignments (2)
CORRECTIVE ASSIGNMENT TO CORRECT THE NAME OF THE 2ND INVENTOR ZHOU YAN PREVIOUSLY RECORDED ON REEL 063275 FRAME 0082. ASSIGNOR(S) HEREBY CONFIRMS THE ASSIGNMENT. Recorded Apr 27, 2023
From: BAI, TIANYANG; ZHOU, YAN; VENUGOPAL, KIRAN; RYU, JUNG HO; LUO, TAO; LI, JUNYI
To: QUALCOMM INCORPORATED
Reel/Frame 063485/0371 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 10, 2023
From: BAI, TIANYANG; YAN, ZHOU; VENUGOPAL, KIRAN; RYU, JUNG HO; LUO, TAO; LI, JUNYI
To: QUALCOMM INCORPORATED
Reel/Frame 063275/0082 →
Continuity (5)
Continuation 16995552 · Aug 17, 2020
Continuation 16805406 · Feb 28, 2020
Provisional Application 62926233 · Oct 25, 2019
Provisional Application 62910642 · Oct 4, 2019
Related Publication 20220394800A1 · Dec 8, 2022