IP Library › Granted Patent US 11,930,447
Granted Patent B2
US 11,930,447 · App. 17/312,002 · Granted Mar 12, 2024

Communication device and communication method

Inventors: Yusuke Tanaka (Tokyo, JP); Naoki Kusashima (Tokyo, JP)
Assignee: SONY GROUP CORPORATION
H04W48/18H04W72/0453H04W72/51
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 11,930,447
App. No.
17/312,002
Granted
Mar 12, 2024
Kind
B2
Abstract

The present technology relates to a communication device and a communication method capable of achieving low-delay communication stably on an unlicensed band. The communication device includes a first communication unit configured to communicate on a first frequency band that is an unlicensed band and a second communication unit configured to communicate on a second frequency band that is an unlicensed band different from the first frequency band. A controller of the communication device is configured to control transmission of data using either one frequency band of communication on the first frequency band or communication on the second frequency band on the basis of information regarding a resource on the second frequency band transmitted from a first communication device. The present technology is applicable to, for example, a communication device and the like that conducts wireless communication standardized by IEEE 802.11.

Claims (79)

1. A communication device comprising:

a transceiver configured to communicate on:

a first frequency band that is an unlicensed band, and

a second frequency band that is an unlicensed band different from the unlicensed band of the first frequency band; and

a control circuitry configured to:

send a notification to a base station to notify the base station that the communication device has data to transmit,

receive a notification from the base station that identifies a scheduled resource of the second frequency band,

attempt to transmit the data on an unscheduled resource of the first frequency band,

based upon a usage condition of the unscheduled resource of the first frequency band, determine that the communication device must delay a start of a transmission of the data via the unscheduled resource of the first frequency band by a determined time delay,

based on determined time delay, determine whether or not the communication device is able to complete a transmission of the data via the scheduled resource of the second frequency band before the communication device would be able to complete a transmission of the data via the unscheduled resource of the first frequency band,

upon determining that the communication device is able to complete the transmission of the data via the scheduled resource of the second frequency band before the communication device would be able to complete the transmission of the data via the unscheduled resource of the first frequency band, transmit the data via the scheduled resource of the second frequency band, and

upon determining that the communication device is not able to complete the transmission of the data via the scheduled resource of the second frequency band before the communication device would be able to complete the transmission of the data via the unscheduled resource of the first frequency band, transmit the data via the unscheduled resource of the first frequency band after the determined time delay.

2. The communication device according to claim 1 , wherein the notification to the base station comprises:

a signal type field indicating that the notification to the base station is related to traffic,

a length field indicating a length of the notification to the base station,

a maximum acceptable delay field indicating a maximum acceptable delay time for the data to be transmitted,

a priority field indicating a priority of the data to be transmitted,

a data amount field indicating an amount of the data to be transmitted, and

a frequency of data field indicating a frequency of the data to be transmitted.

3. The communication device according to claim 2 , wherein the notification from the base station comprises:

a signal type field indicating that the notification from the base station is related to traffic,

a length field indicating a length of the notification from the base station,

an allocated ID field indicating an identifier of a communication device to which the scheduled resource of the second frequency band is allocated,

a time resource field indicating a time resource of the second frequency band to be used to transmit the data,

a frequency resource field indicating a frequency resource of the second frequency band to be used to transmit the data,

a spatial stream resource field indicating a spatial resource of the second frequency band to be used to transmit the data,

a non-orthogonal multiplex access (NOMA) resource field indicating a NOMA resource of the second frequency band to be used to transmit the data,

an inherit resource field indicating that a same resource of the second frequency band that has been previously allocated is used is to be used to transmit the data, and

a no allocation field indicating that no resource of the second frequency band is available to transmit the data.

4. A method of communication by a communication device via a first frequency band that is an unlicensed band and a second frequency band that is an unlicensed band different from the unlicensed band of the first frequency band, the method comprising:

sending a notification to a base station to notify the base station that the communication device has data to transmit,

receiving a notification from the base station that identifies a scheduled resource of the second frequency band,

attempting to transmit the data on an unscheduled resource of the first frequency band,

based upon a usage condition of the unscheduled resource of the first frequency band, determining that the communication device must delay a start of a transmission of the data via the unscheduled resource of the first frequency band by a determined time delay,

based on determined time delay, determining whether or not the communication device is able to complete a transmission of the data via the scheduled resource of the second frequency band before the communication device would be able to complete a transmission of the data via the unscheduled resource of the first frequency band,

upon determining that the communication device is able to complete the transmission of the data via the scheduled resource of the second frequency band before the communication device would be able to complete the transmission of the data via the unscheduled resource of the first frequency band, transmitting the data via the scheduled resource of the second frequency band, and

upon determining that the communication device is not able to complete the transmission of the data via the scheduled resource of the second frequency band before the communication device would be able to complete the transmission of the data via the unscheduled resource of the first frequency band, transmitting the data via the unscheduled resource of the first frequency band after the determined time delay.

5. The method of claim 4 , wherein the notification to the base station comprises:

a signal type field indicating that the notification to the base station is related to traffic,

a length field indicating a length of the notification to the base station,

a maximum acceptable delay field indicating a maximum acceptable delay time for the data to be transmitted,

a priority field indicating a priority of the data to be transmitted,

a data amount field indicating an amount of the data to be transmitted, and

a frequency of data field indicating a frequency of the data to be transmitted.

6. The method according to claim 5 , wherein the notification from the base station comprises:

a signal type field indicating that the notification from the base station is related to traffic,

a length field indicating a length of the notification from the base station,

an allocated ID field indicating an identifier of a communication device to which the scheduled resource of the second frequency band is allocated,

a time resource field indicating a time resource of the second frequency band to be used to transmit the data,

a frequency resource field indicating a frequency resource of the second frequency band to be used to transmit the data,

a spatial stream resource field indicating a spatial resource of the second frequency band to be used to transmit the data,

a non-orthogonal multiplex access (NOMA) resource field indicating a NOMA resource of the second frequency band to be used to transmit the data,

an inherit resource field indicating that a same resource of the second frequency band that has been previously allocated is used is to be used to transmit the data, and

a no allocation field indicating that no resource of the second frequency band is available to transmit the data.

7. A non-transitory computer readable medium containing instructions to cause a device to perform a method of communication via a first frequency band that is an unlicensed band and a second frequency band that is an unlicensed band different from the unlicensed band of the first frequency band, the method comprising:

sending a notification to a base station to notify the base station that the communication device has data to transmit,

receiving a notification from the base station that identifies a scheduled resource of the second frequency band,

attempting to transmit the data on an unscheduled resource of the first frequency band,

based upon a usage condition of the unscheduled resource of the first frequency band, determining that the communication device must delay a start of a transmission of the data via the unscheduled resource of the first frequency band by a determined time delay,

based on determined time delay, determining whether or not the communication device is able to complete a transmission of the data via the scheduled resource of the second frequency band before the communication device would be able to complete a transmission of the data via the unscheduled resource of the first frequency band,

upon determining that the communication device is able to complete the transmission of the data via the scheduled resource of the second frequency band before the communication device would be able to complete the transmission of the data via the unscheduled resource of the first frequency band, transmitting the data via the scheduled resource of the second frequency band, and

upon determining that the communication device is not able to complete the transmission of the data via the scheduled resource of the second frequency band before the communication device would be able to complete the transmission of the data via the unscheduled resource of the first frequency band, transmitting the data via the unscheduled resource of the first frequency band after the determined time delay.

8. The non-transitory computer readable medium of claim 7 , wherein the notification to the base station comprises:

a signal type field indicating that the notification to the base station is related to traffic,

a length field indicating a length of the notification to the base station,

a maximum acceptable delay field indicating a maximum acceptable delay time for the data to be transmitted,

a priority field indicating a priority of the data to be transmitted,

a data amount field indicating an amount of the data to be transmitted, and

a frequency of data field indicating a frequency of the data to be transmitted.

9. The non-transitory computer readable medium of claim 8 , wherein the notification from the base station comprises:

a signal type field indicating that the notification from the base station is related to traffic,

a length field indicating a length of the notification from the base station,

an allocated ID field indicating an identifier of a communication device to which the scheduled resource of the second frequency band is allocated,

a time resource field indicating a time resource of the second frequency band to be used to transmit the data,

a frequency resource field indicating a frequency resource of the second frequency band to be used to transmit the data,

a spatial stream resource field indicating a spatial resource of the second frequency band to be used to transmit the data,

a non-orthogonal multiplex access (NOMA) resource field indicating a NOMA resource of the second frequency band to be used to transmit the data,

an inherit resource field indicating that a same resource of the second frequency band that has been previously allocated is used is to be used to transmit the data, and

a no allocation field indicating that no resource of the second frequency band is available to transmit the data.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 9, 2021
From: TANAKA, YUSUKE; KUSASHIMA, NAOKI
To: SONY GROUP CORPORATION
Reel/Frame 056479/0458 →
Priority Claims (1)
JP 2019-001580 · Jan 9, 2019 · national
Continuity (1)
Related Publication 20220015024A1 · Jan 13, 2022