IP Library Granted Patent US 12,019,302
Granted Patent B2
US 12,019,302 · App. 17/751,657 · Granted Jun 25, 2024

Assemblies for pulling, pushing, or blowing a plurality of preterminated fiber optic cables through a duct and assembling a fiber optic connector including the preterminated fiber optic cable after being pulled, pushed, or blown through the duct

Inventors: Kim Leeson (Ipswich, GB); Shaun Trezise (Aldeburgh, GB)
Assignee: PPC BROADBAND, INC.
G02B6/50G02B6/441G02B6/475G02B6/545
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,019,302
App. No.
17/751,657
Granted
Jun 25, 2024
Kind
B2
Abstract

An assembly for pulling, pushing, or blowing a plurality of preterminated fiber optic cables of a multi fiber cable through a duct includes a sleeve, a rod configured to be coupled with the sleeve, and a plurality of dust caps. The sleeve is configured to receive to be coupled with a multi fiber cable and to permit a plurality of preterminated fiber optic cables of the multi fiber cable to pass through the sleeve, and the rod includes a first end configured to be coupled with the sleeve. Each of the plurality of dust caps is configured to be coupled with a ferrule of one of the preterminated fiber optic cables, and each of the plurality of dust caps is configured to be coupled with the rod, thereby coupling the preterminated fiber optic cables with the rod. The preterminated fiber optic cables are configured to be assembled with a fiber optic connector, the deployment assembly has a cross-sectional footprint that is smaller than a cross-sectional footprint of a fiber optic connector that is configured to be assembled with the preterminated fiber optic cable, and the plurality of preterminated fiber optic cables are configured to be pushed, pulled, or blown together through a duct having an inner diameter than is less than a cross-sectional footprint of a fiber optic connector that is configured to be assembled with the preterminated fiber optic cable.

Claims (54)

1. An assembly for pulling, pushing, or blowing a plurality of preterminated fiber optic cables of a multi fiber cable through a duct having a cross sectional footprint smaller than a cross-sectional footprint of a fiber optic connectors configured to be connected to the plurality of preterminated fiber optic cables, comprising:

a sleeve;

a rod configured to be coupled with the sleeve;

a plurality of dust caps;

a protective sleeve;

wherein the sleeve is configured to receive to be crimped onto a multi fiber cable and to permit a plurality of preterminated fiber optic cables of the multi fiber cable to pass through the sleeve;

wherein the rod includes a first end configured to be coupled with the sleeve and a free second end;

wherein each of the plurality of dust caps is configured to be coupled with a ferrule of one of the preterminated fiber optic cables;

wherein each of the plurality of dust caps that is coupled with the ferrule of one of the predetermined fiber optic cables is configured to include an attachment structure configured to be coupled with the rod, thereby coupling the preterminated fiber optic cables with the rod;

wherein the protective sleeve is configured to surround a portion of the sleeve, the rod, and the plurality of dust caps;

wherein the preterminated fiber optic cables are configured to be assembled with a fiber optic connector;

wherein the deployment assembly has a cross-sectional footprint that is smaller than a cross-sectional footprint of a fiber optic connector that is configured to be assembled with the preterminated fiber optic cable;

wherein the plurality of preterminated fiber optic cables are configured to be pushed, pulled, or blown together through a duct having an inner diameter than is less than a cross-sectional footprint of a fiber optic connector that is configured to be assembled with the preterminated fiber optic cable.

2. The assembly of claim 1 , further comprising a fiber optic connector configured to be field assembled with the plurality of preterminated fiber optic cables after the plurality of fiber optic cables are pushed, pulled, or blown together through a duct and the deployment assembly is removed from the plurality of preterminated fiber optic cables.

3. The assembly of claim 1 , wherein the attachment structure comprises a clip configured to be clipped onto the rod.

4. The assembly of claim 1 , wherein the clips are configured to be clipped onto the rod sequentially along a length of the rod.

5. The assembly of claim 1 , wherein the free second end of the rod includes a pulling hook.

6. The assembly of claim 1 , wherein the rod is configured to be removed from the sleeve.

7. An assembly for pulling, pushing, or blowing a plurality of preterminated fiber optic cables of a multi fiber cable through a duct having a cross sectional footprint smaller than a cross-sectional footprint of a fiber optic connectors configured to be connected to the plurality of preterminated fiber optic cables, comprising:

a sleeve;

a rod configured to be coupled with the sleeve;

a plurality of dust caps;

wherein the sleeve is configured to receive to be crimped onto a multi fiber cable and to permit a plurality of preterminated fiber optic cables of the multi fiber cable to pass through the sleeve;

wherein the rod includes a first end configured to be coupled with the sleeve and a free second end;

wherein each of the plurality of dust caps is configured to be coupled with a ferrule of one of the preterminated fiber optic cables;

wherein each of the plurality of dust caps that is coupled with the ferrule of one of the predetermined fiber optic cables is configured to be coupled with the rod, thereby coupling the preterminated fiber optic cables with the rod;

wherein the preterminated fiber optic cables are configured to be assembled with a fiber optic connector;

wherein the deployment assembly has a cross-sectional footprint that is smaller than a cross-sectional footprint of a fiber optic connector that is configured to be assembled with the preterminated fiber optic cable;

wherein the plurality of preterminated fiber optic cables are configured to be pushed, pulled, or blown together through a duct having an inner diameter than is less than a cross-sectional footprint of a fiber optic connector that is configured to be assembled with the preterminated fiber optic cable.

8. The assembly of claim 7 , further comprising a fiber optic connector configured to be field assembled with the plurality of preterminated fiber optic cables after the plurality of fiber optic cables are pushed, pulled, or blown together through a duct and the deployment assembly is removed from the plurality of preterminated fiber optic cables.

9. The assembly of claim 7 , wherein each of the plurality of dust caps that is coupled with the ferrule of one of the predetermined fiber optic cables is configured to include an attachment structure configured to be coupled with the rod, thereby coupling the preterminated fiber optic cables with the rod.

10. The assembly of claim 9 , wherein the attachment structure comprises a clip configured to be clipped onto the rod.

11. The assembly of claim 10 , wherein the clips are configured to be clipped onto the rod sequentially along a length of the rod.

12. The assembly of claim 7 , wherein the free second end of the rod includes a pulling hook.

13. The assembly of claim 7 , wherein the rod is configured to be removed from the sleeve.

14. The assembly of claim 7 , further comprising a protective sleeve configured to surround a portion of the sleeve, the rod, and the plurality of dust caps.

15. An assembly for pulling, pushing, or blowing a plurality of preterminated fiber optic cables of a multi fiber cable through a duct having a cross sectional footprint smaller than a cross-sectional footprint of a fiber optic connectors configured to be connected to the plurality of preterminated fiber optic cables, comprising:

a sleeve;

a rod configured to be coupled with the sleeve;

a plurality of dust caps;

wherein the sleeve is configured to receive to be coupled with a multi fiber cable and to permit a plurality of preterminated fiber optic cables of the multi fiber cable to pass through the sleeve;

wherein the rod includes a first end configured to be coupled with the sleeve;

wherein each of the plurality of dust caps is configured to be coupled with a ferrule of one of the preterminated fiber optic cables;

wherein each of the plurality of dust caps is configured to be coupled with the rod, thereby coupling the preterminated fiber optic cables with the rod;

wherein the preterminated fiber optic cables are configured to be assembled with a fiber optic connector;

wherein the deployment assembly has a cross-sectional footprint that is smaller than a cross-sectional footprint of a fiber optic connector that is configured to be assembled with the preterminated fiber optic cable;

wherein the plurality of preterminated fiber optic cables are configured to be pushed, pulled, or blown together through a duct having an inner diameter than is less than a cross-sectional footprint of a fiber optic connector that is configured to be assembled with the preterminated fiber optic cable.

16. The assembly of claim 15 , further comprising a fiber optic connector configured to be field assembled with the plurality of preterminated fiber optic cables after the plurality of fiber optic cables are pushed, pulled, or blown together through a duct and the deployment assembly is removed from the plurality of preterminated fiber optic cables.

17. The assembly of claim 16 , wherein the attachment structure comprises a clip configured to be clipped onto the rod.

18. The assembly of claim 17 , wherein the free second end of the rod includes a pulling hook.

19. The assembly of claim 15 , wherein each of the plurality of dust caps that is coupled with the ferrule of one of the predetermined fiber optic cables is configured to include an attachment structure configured to be coupled with the rod, thereby coupling the preterminated fiber optic cables with the rod.

20. The assembly of claim 16 , wherein the attachment structure comprises a clip configured to be clipped onto the rod.

21. The assembly of claim 15 , wherein the rod is configured to be removed from the sleeve.

22. The assembly of claim 15 , further comprising a protective sleeve configured to surround a portion of the sleeve, the rod, and the plurality of dust caps.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 23, 2024
From: LEESON, KIM; TREZISE, SHAUN
To: PPC BROADBAND, INC.
Reel/Frame 066214/0697 →
Continuity (2)
Provisional Application 63191549 · May 21, 2021
Related Publication 20220373757A1 · Nov 24, 2022
Cited By (1)
US 12,645,026