IP Library › Granted Patent US 12,037,901
Granted Patent B2
US 12,037,901 · App. 17/215,547 · Granted Jul 16, 2024

Automated well productivity estimation and continuous average well pressure monitoring through integration of real-time surface and downhole pressure and temperature measurements

Inventors: Ali M. Al Shahri (Dhahran, SA); Anas A. Al Shuaibi (Dammam, SA); Mohammed Sami Kanfar (Dammam, SA); Kalid Saad Dosary (Al-Khobar, SA); Abdulaziz A. Alsaleh (Dammam, SA)
Assignee: Saudi Arabian Oil Company
E21B49/087E21B47/06G01V9/02E21B2200/20E21B2200/22
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,037,901
App. No.
17/215,547
Granted
Jul 16, 2024
Kind
B2
Abstract

Systems and methods for intelligent estimation of productivity index and reservoir pressure values using pressure sensors, a neural network model comprising historical flow rate data of at least a well bore, and a data processor. The pressure sensors generate pressure data associated with a well bore's surface point and a downhole point. The data processor, communicatively coupled to the two pressure sensors and the neural network model, is operable to receive the pressure data from the sensors respectively indicative of pressure at each of the two points, estimate a real-time productivity index value in real-time based on the pressure data from the pressure sensors and the historical flowrate data of the neural network model, and estimate a reservoir pressure value of the well bore at a flowing condition, a reservoir pressure value of the well bore at a shut-in condition, or both, based on the real-time productivity index.

Claims (114)

1. An intelligent estimation system comprising at least two pressure sensors, a neural network model, and a data processor, wherein:

the at least two pressure sensors are configured to generate well parameters comprising at least pressure data respectively associated with two points of a well bore, the two points comprising a surface point of the well bore and a downhole point of the well bore, wherein the well parameters further comprise at least a measured or estimated bottomhole pressure of the well bore;

the neural network model comprises historical flowrate data associated with at least the well bore; and

the data processor is communicatively coupled to the at least two pressure sensors and the neural network model and is operable to:

receive the well parameters comprising (i) the pressure data from the at least two pressure sensors respectively indicative of pressure at each of the two points of the well bore and (ii) the measured or estimated bottomhole pressure of the well bore,

estimate a real-time productivity index value in real-time based on (i) the well parameters comprising the pressure data from the at least two pressure sensors and the measured or estimated bottomhole pressure of the well bore and (ii) the historical flowrate data of the neural network model, and

estimate a reservoir pressure value of the well bore at a flowing condition, a reservoir pressure value of the well bore at a shut-in condition, or both, based on the real-time productivity index.

2. The intelligent estimation system of claim 1 , wherein the data processor is operable to estimate the real-time productivity index by solving:

J

⁡

(

Productivity

⁢

Index

)

=

Q

P

r

-

P

wf

,

wherein J is representative of the real-time productivity index value, Q is representative of a surface flowrate at standard conditions for the well bore, P r is representative of a reservoir pressure for the well bore, and P wf is representative of a flowing bottomhole pressure for the well bore.

3. The intelligent estimation system of claim 2 , wherein Q is based on the historical flowrate data, P r is an input associated with a pressure point after a pressure buildup is stabilized and based on the pressure data, and P wf is an input associated with a last flowing pressure point before the pressure buildup is initiated and based on the pressure data.

4. The intelligent estimation system of claim 1 , further comprising a flowmeter configured to provide a flowrate associated with the well bore, wherein the data processor is operable to estimate the real-time productivity index by solving:

J

⁡

(

Productivity

⁢

Index

)

=

Q

P

r

-

P

wf

,

wherein J is representative of the real-time productivity index value, Q is representative of a surface flowrate at standard conditions for the well bore based on the flowrate from the flowmeter, P r is representative of a reservoir pressure for the well bore, and P wf is representative of a flowing bottomhole pressure for the well bore.

5. The intelligent estimation system of claim 1 , wherein the data processor is further operable to:

generate a productivity index graphical representation including the real-time productivity index value for the well bore; and

display the productivity index graphical representation in real-time.

6. The intelligent estimation system of claim 5 , wherein the data processor is further operable to:

display the productivity index graphical representation comprising each real-time productivity index value for a plurality of well bores, the plurality of well bores comprising the well bore.

7. The intelligent estimation system of claim 1 , wherein the data processor is further operable to:

generate a reservoir pressure graphical representation including the reservoir pressure value of the well bore at the flowing condition, the reservoir pressure value of the well bore at the shut-in condition, or both; and

display the reservoir pressure graphical representation.

8. The intelligent estimation system of claim 7 , wherein the data processor is further operable to:

display the reservoir pressure graphical representation comprising each reservoir pressure value of each well bore at the flowing condition, the shut-in condition, or both, for a plurality of well bores, the plurality of well bores comprising the well bore.

9. The intelligent estimation system of claim 1 , wherein the data processor is operable to determine when the well bore is in the flowing condition, the shut-in condition, or both, based on the pressure data and received temperature data to identify exact pressure build-up periods indicative of the shut-in condition.

10. An intelligent estimation system comprising at least two pressure sensors, a neural network model, and a data processor, wherein:

the at least two pressure sensors are configured to generate well parameters comprising at least pressure data respectively associated with two points of a well bore, the two points comprising a surface point of the well bore and a downhole point of the well bore of a plurality of well bores, the well parameters further comprising at least a measured or estimated bottomhole pressure of the well bore of the plurality of well bores;

the neural network model comprises historical flowrate data associated with at least the well bore of the plurality of well bores; and

the data processor is communicatively coupled to the at least two pressure sensors and the neural network model and is operable to:

receive the well parameters comprising (i) the pressure data from the at least two pressure sensors respectively indicative of pressure at each of the two points of the well bore and (ii) the measured or estimated bottomhole pressure of the well bore,

estimate a real-time productivity index value of the well bore in real-time based on (i) the well parameters comprising the pressure data from the at least two pressure sensors and the measured or estimated bottomhole pressure of the well bore (ii) and the historical flowrate data of the neural network model,

estimate a reservoir pressure value of the well bore at a flowing condition, a reservoir pressure value of the well bore at a shut-in condition, or both, based on the real-time productivity index,

generate (i) a productivity index graphical representation comprising each real-time productivity index value for each well bore of the plurality of well bores, (ii) a reservoir pressure graphical representation comprising each reservoir pressure value of each well bore, (iii) or both; and

display the productivity index graphical representation, the reservoir pressure graphical representation, or both.

11. The intelligent estimation system of claim 10 , further comprising a flowmeter configured to provide a flowrate associated with the well bore, wherein the data processor is operable to estimate the real-time productivity index by solving:

J

⁡

(

Productivity

⁢

Index

)

=

Q

P

r

-

P

wf

,

wherein J is representative of the real-time productivity index value, Q is representative of a surface flowrate at standard conditions for the well bore based on the flowrate from the flowmeter, P r is representative of a reservoir pressure for the well bore, and P wf is representative of a flowing bottomhole pressure for the well bore.

12. The intelligent estimation system of claim 11 , wherein Q is further based on the historical flowrate data, P r is an input associated with a pressure point after a pressure buildup is stabilized and based on the pressure data, and P wf is an input associated with a last flowing pressure point before the pressure buildup is initiated and based on the pressure data.

13. The intelligent estimation system of claim 10 , wherein the data processor is further operable to:

generate the reservoir pressure graphical representation including the reservoir pressure value of the well bore at the flowing condition, the reservoir pressure value of the well bore at the shut-in condition, or both.

14. The intelligent estimation system of claim 13 , wherein the data processor is further operable to:

display the reservoir pressure graphical representation, the reservoir pressure graphical representation comprising each reservoir pressure value of each well bore at the flowing condition, the shut-in condition, or both, for the plurality of well bores.

15. The intelligent estimation system of claim 10 , wherein the data processor is operable to determine when the well bore is in the flowing condition, the shut-in condition, or both, based on the pressure data and received temperature data to identify exact pressure build-up periods indicative of the shut-in condition.

16. A method comprising:

generating well parameters comprising at least pressure data respectively associated with two points of a well bore from at least two pressure sensors, the two points comprising a surface point of the well bore and a downhole point of the well bore, the well parameters further comprising at least a measured or estimated bottomhole pressure of the well bore;

receiving historical flowrate data associated with at least the well bore from a neural network model;

receiving the well parameters comprising (i) the pressure data from the at least two pressure sensors respectively indicative of pressure at each of the two points of the well bore and (ii) the measured or estimated bottomhole pressure of the well bore;

estimating a real-time productivity index value of the well bore in real-time based on (i) the well parameters comprising the pressure data from the at least two pressure sensors and the measured or estimated bottomhole pressure of the well bore and (ii) the historical flowrate data of the neural network model; and

estimating a reservoir pressure value of the well bore at a flowing condition, a reservoir pressure value of the well bore at a shut-in condition, or both, based on the real-time productivity index.

17. The method of claim 16 , further comprising receiving a flowrate associated with the well bore from a flowmeter, and wherein the estimating of the real-time productivity index based on solving:

J

⁡

(

Productivity

⁢

Index

)

=

Q

P

r

-

P

wf

,

wherein J is representative of the real-time productivity index value, Q is representative of a surface flowrate at standard conditions for the well bore based on the flowrate from the flowmeter, P r is representative of a reservoir pressure for the well bore, and P wf is representative of a flowing bottomhole pressure for the well bore.

18. The method of claim 16 , further comprising:

generating a productivity index graphical representation including the real-time productivity index value for the well bore; and

displaying the productivity index graphical representation in real-time.

19. The method of claim 18 , further comprising:

displaying the productivity index graphical representation comprising each real-time productivity index value for a plurality of well bores, the plurality of well bores comprising the well bore.

20. The method of claim 16 , further comprising determining when the well bore is in the flowing condition, the shut-in condition, or both, based on the pressure data and received temperature data to identify exact pressure build-up periods indicative of the shut-in condition.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 29, 2021
From: AL SHAHRI, ALI M.; AL SHUAIBI, ANAS A.; KANFAR, MOHAMMED SAMI; DOSARY, KALID SAAD; ALSALEH, ABDULAZIZ A.
To: SAUDI ARABIAN OIL COMPANY
Reel/Frame 055753/0363 →
Continuity (2)
Provisional Application 63002466 · Mar 31, 2020
Related Publication 20210301659A1 · Sep 30, 2021