IP Library Granted Patent US 12,040,620
Granted Patent B2
US 12,040,620 · App. 17/470,936 · Granted Jul 16, 2024

Renewal energy hydrogen system

Inventors: Toshimitsu Kumazawa (Kawasaki, JP); Akihiro Itakura (Kawasaki, JP); Toru Yano (Shinagawa, JP); Takahiko Abe (Ageo, JP)
Assignees: KABUSHIKI KAISHA TOSHIBA; TOSHIBA ENERGY SYSTEMS & SOLUTIONS CORPORATION
H02J3/381G05B15/02H01M8/04992H01M8/0606H01M10/44H01M16/006H02J7/0069H02J2300/24
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,040,620
App. No.
17/470,936
Granted
Jul 16, 2024
Kind
B2
Abstract

According to one embodiment, an information processing apparatus includes: receiving circuitry and the controlling circuitry. The receiving circuitry receives operation data of an energy system being capable of inputting and outputting power to and from a power line to which a power system and a load are connected, and the energy system including a hydrogen production apparatus producing hydrogen, a first hydrogen accumulation apparatus accumulating the hydrogen, a first power generation apparatus generating power using the hydrogen accumulated in the first hydrogen accumulation apparatus, and a storage battery capable of charging and discharging. The controlling circuitry determines a process to be preferentially executed among at least two of processes of generating power in the first power generation apparatus, producing hydrogen in the hydrogen to be accumulated apparatus, charging the storage battery, discharging the storage battery, transmitting power to the power system, and receiving power from the power system.

Claims (99)

1. An information processing apparatus comprising:

receiving circuitry configured to receive operation data of an energy system,

the energy system being capable of inputting and outputting power to and from a power line to which a power system and a load are connected, and

the energy system including

a hydrogen production apparatus producing hydrogen,

a first hydrogen accumulation apparatus accumulating the hydrogen,

a first power generation apparatus generating power using the hydrogen

accumulated in the first hydrogen accumulation apparatus, and a storage battery capable of charging and discharging power; and

controlling circuitry configured to determine, on a basis of the operation data, a process to be preferentially executed among at least two of processes including:

a process of generating power in the first power generation apparatus,

a process of producing hydrogen in the hydrogen production apparatus,

a process of charging the storage battery,

a process of discharging the storage battery,

a process of transmitting power to the power system and

a process of receiving power from the power system,

wherein the controlling circuitry determines which of the at least two processes is to be executed on a basis of at least one of a first plan and a second plan,

the first plan being a plan regarding an amount of power to be transmitted and received to and from the power system and

the second plan being a plan regarding an amount of hydrogen to be accumulated in the first hydrogen accumulation apparatus.

2. The information processing apparatus according to claim 1 ,

wherein the controlling circuitry determines priorities of the at least two of processes.

3. The information processing apparatus according to claim 2 ,

wherein the controlling circuitry determines which of the at least two of processes is to be executed on a basis of the operation data and the priorities.

4. The information processing apparatus according to claim 1 ,

wherein the energy system further comprises a second power generation apparatus capable of generating power using natural energy and supplying the generated power to the power line.

5. The information processing apparatus according to claim 4 ,

wherein the second power generation apparatus is a solar power generation apparatus.

6. The information processing apparatus according to claim 1 ,

wherein the energy system further comprises a second hydrogen accumulation apparatus accumulating the hydrogen produced by the hydrogen production apparatus, and a hydrogen supply apparatus supplying the hydrogen accumulated in the second hydrogen accumulation apparatus to an external first apparatus, and

the controlling circuitry determines which process is to be preferentially executed among at least two of processes including:

the process of generating power in the first power generation apparatus,

the process of producing hydrogen to be accumulated in the first hydrogen accumulation apparatus,

a process of producing hydrogen to be accumulated in the second hydrogen accumulation apparatus,

the process of charging the storage battery,

the process of discharging the storage battery,

the process of transmitting power to the power system and

the process of receiving power from the power system.

7. The information processing apparatus according to claim 6 ,

wherein the controlling circuitry determines which of the at least two processes is to be executed under a constraint condition including a supply plan for supplying the hydrogen to the first apparatus.

8. The information processing apparatus according to claim 1 ,

wherein the energy system further comprises a water accumulation apparatus accumulating water and a hot water supply apparatus supplying water heated through power generation by the first power generation apparatus to an external second apparatus, and

the controlling circuitry determines which of the at least two processes is to be executed under a constraint condition including a supply plan for supplying the heated water to the second apparatus.

9. The information processing apparatus according to claim 1 ,

wherein the controlling circuitry determines which of the at least two of processes is to be executed on a basis of supply and demand balance of the power.

10. The information processing apparatus according to claim 1 , further comprising:

transmitting circuitry configured to transmit control information to instruct to execute the determined process to the energy system.

11. An information processing method comprising:

receiving operation data of an energy system,

the energy system being capable of inputting and outputting power to and from a power line to which a power system and a load are connected, and

the energy system including

a hydrogen production apparatus producing hydrogen,

a first hydrogen accumulation apparatus accumulating the hydrogen,

a first power generation apparatus generating power using the hydrogen accumulated in the first hydrogen accumulation apparatus, and

a storage battery capable of charging and discharging power; and

determining, on a basis of the operation data, a process to be preferentially executed among at least two of processes including:

a process of generating power in the first power generation apparatus,

a process of producing hydrogen in the hydrogen production apparatus,

a process of charging the storage battery,

a process of discharging the storage battery,

a process of transmitting power to the power system and

a process of receiving power from the power system,

determining which of the at least two processes is to be executed on a basis of at least one of a first plan and a second plan,

the first plan being a plan regarding an amount of power to be transmitted and received to and from the power system and

the second plan being a plan regarding an amount of hydrogen to be accumulated in the first hydrogen accumulation apparatus.

12. An information processing system comprising:

an energy system capable of inputting and outputting power to and from a power line to which a power system and a load are connected,

the energy system including

a hydrogen production apparatus producing hydrogen,

a first hydrogen accumulation apparatus accumulating the hydrogen,

a first power generation apparatus generating power using the hydrogen accumulated in the first hydrogen accumulation apparatus, and

a storage battery capable of charging and discharging power; and

receiving circuitry configured to receive operation data of the energy system,

controlling circuitry configured to determine, on a basis of the operation data, a process to be preferentially executed among at least two of processes including:

a process of generating power in the first power generation apparatus,

a process of producing hydrogen in the hydrogen production apparatus,

a process of charging the storage battery,

a process of discharging the storage battery,

a process of transmitting power to the power system and

a process of receiving power from the power system,

wherein the controlling circuitry determines which of the at least two processes is to be executed on a basis of at least one of a first plan and a second plan,

the first plan being a plan regarding an amount of power to be transmitted and received to and from the power system and

the second plan being a plan regarding an amount of hydrogen to be accumulated in the first hydrogen accumulation apparatus.

13. A non-transitory computer readable medium having a computer program stored therein which when executed by a computer, causes the computer to perform processing comprising:

receiving operation data of an energy system,

the energy system being capable of inputting and outputting power to and from a power line to which a power system and a load are connected, and

the energy system including

a hydrogen production apparatus producing hydrogen,

a first hydrogen accumulation apparatus accumulating the hydrogen,

a first power generation apparatus generating power using the hydrogen accumulated in the first hydrogen accumulation apparatus, and

a storage battery capable of charging and discharging power; and

determining, on a basis of the operation data, a process to be preferentially executed among at least two of processes including:

a process of generating power in the first power generation apparatus,

a process of producing hydrogen in the hydrogen production apparatus,

a process of charging the storage battery,

a process of discharging the storage battery,

a process of transmitting power to the power system and

a process of receiving power from the power system,

determining which of the at least two processes is to be executed on a basis of at least one of a first plan and a second plan,

the first plan being a plan regarding an amount of power to be transmitted and received to and from the power system and

the second plan being a plan regarding an amount of hydrogen to be accumulated in the first hydrogen accumulation apparatus.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 26, 2021
From: KUMAZAWA, TOSHIMITSU; ITAKURA, AKIHIRO; YANO, TORU; ABE, TAKAHIKO
To: KABUSHIKI KAISHA TOSHIBA; TOSHIBA ENERGY SYSTEMS & SOLUTIONS CORPORATION
Reel/Frame 057909/0793 →
Priority Claims (1)
JP 2021-044050 · Mar 17, 2021 · national
Continuity (1)
Related Publication 20220302708A1 · Sep 22, 2022
Cited By (1)
US 12,438,380