Methods for determining positions of fluid interfaces and detecting cement setting in a subterranean wellbore
Methods for locating fluid interfaces in a cased wellbore include generating vibrations in the casing, thereby forming oscillations in the wellbore fluids and the casing. The oscillations are detected by a vibration detector. The oscillations are recorded by a data acquisition system. Mathematical processing of the oscillations by cepstrum analysis is performed to determine the depths of interfaces between fluids in the annulus. The methods may also be employed to determine the time at which a cement slurry begins to set and harden. The methods may be performed in real time.
1. A method for locating fluid interfaces in a cased wellbore, comprising:
providing a cased wellbore, thereby forming an annulus between casing and the borehole;
pumping more than one fluid from a bottom of the annulus toward a top of the annulus creating an interface between two fluids;
generating vibrations in the casing, thereby forming oscillations in the fluids and the casing;
detecting the oscillations with a vibration detector;
analyzing the oscillations with a data acquisition system; and
performing mathematical processing of the oscillations to determine depths of the interfaces between the fluids in the annulus, wherein the mathematical processing comprises using accelerometer data, oscillation wave reflections and reflection times from the one or more fluid interfaces.
2. The method of claim 1 , wherein the vibration generator comprises a pump, a hammer, or a piezoelectric transducer.
3. The method of claim 1 , wherein the vibration detector is an accelerometer.
4. The method of claim 3 , wherein the accelerometer operates at a frequency range between 1 Hz and 5.12 kHz.
5. The method of claim 3 , wherein the accelerometer has one or more components.
6. The method of claim 1 , wherein the interface is formed between two fluids having a difference in at least one of density, speed of sound, or viscosity.
7. The method of claim 1 , wherein the generation of vibrations is performed continuously or periodically.
8. The method of claim 1 , wherein the fluids comprise brine, water, spacer fluid, chemical wash, drilling fluid, or cement slurry.
9. The method of claim 1 , wherein the reflection times are obtained through cepstrum analysis of recorded data, wherein a cepstrum is a result of taking an inverse Fourier transform of a logarithm of an estimated spectrum of a signal.
10. A method of cement-setting-time determination, comprising:
providing a cased wellbore, thereby forming an annulus between the casing and the borehole;
pumping more than one fluid with an interface between two fluids from a bottom of the annulus toward a top of the annulus, wherein one of the fluids is a cement slurry;
generating vibrations in the casing, thereby forming oscillations in the fluids and the casing;
detecting the oscillations with a vibration detector comprising an accelerometer;
analyzing the oscillations with a data acquisition system; and
performing mathematical processing of the oscillations to determine when the cement slurry has set, wherein the mathematical processing comprises using accelerometer data and obtaining frequency spectra.
11. The method of claim 10 , wherein the vibration generator comprises a pump, a hammer, or a piezoelectric transducer.
12. The method of claim 10 wherein the generation of vibrations is performed continuously or periodically.
13. The method of claim 10 , wherein another fluid of the more than one fluid comprises brine, water, spacer fluid, chemical wash, or drilling fluid.
14. The method of claim 10 , wherein an oscillation frequency changes as the cement slurry sets and hardens.