IP Library › Granted Patent US 12,146,205
Granted Patent B2
US 12,146,205 · App. 16/341,512 · Granted Nov 19, 2024

Process for recycling cobalt-bearing materials

Inventors: Thomas Suetens (Westerlo, BE); David Van Horebeek (Tielt-Winge, BE)
Assignee: UMICORE
C22B23/02C22B7/001
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,146,205
App. No.
16/341,512
Granted
Nov 19, 2024
Kind
B2
Abstract

The present invention concerns the recovery of cobalt from cobalt-bearing materials, in particular from cobalt-bearing lithium-ion secondary batteries, from the spent batteries, or from their scrap. A process is divulged for the recovery of cobalt from cobalt-bearing materials, comprising the steps of: providing a converter furnace, charging slag formers and one or more of copper matte, copper-nickel matte, and impure alloy into the furnace, and injecting an oxidizing gas so as to smelt the charge in oxidizing conditions, thereby obtaining a molten bath comprising a crude metal phase, and a cobalt-bearing slag, and separating the crude metal from the cobalt-bearing slag, characterized in that the cobalt-bearing materials are charged into the furnace. This process is particularly suitable for recycling cobalt-bearing lithium-ion secondary batteries. Cobalt is concentrated in a limited amount of converter slag, from which it can economically be retrieved, together with other elements such as copper and/or nickel.

Claims (14)

1. Process for the recovery of cobalt from cobalt-bearing materials, comprising:

providing a converter furnace;

feeding cobalt-bearing materials, slag formers, and oner or more of copper matte, copper-nickel matte, and impure alloy containing copper and/or nickel into the converter furnace,

injecting an oxidizing gas into the converter furnace, thereby oxidizing any sulfidic materials present in the copper matte or copper-nickel matte to form sulfur dioxide, and obtaining a molten bath in the converter furnace comprising a crude metal phase and a cobalt-bearing slag, but free of sulfur; and,

separating the crude metal phase from the cobalt-bearing slag;

wherein the cobalt-bearing materials comprise secondary batteries, spent batteries, or their scrap and wherein more than 90% by weight of the cobalt present in the cobalt-bearing materials is recovered in the cobalt-bearing slag.

2. Process according to claim 1 , wherein the more than 90% by weight of the cobalt present in the cobalt-bearing materials is recovered in the cobalt-bearing slag, by adjusting the amount of oxidizing gas.

3. Process for the recovery of cobalt from cobalt-bearing materials according to claim 1 , wherein the cobalt in the cobalt-bearing slag amounts to between 2% and 20% by weight.

4. Process for the recovery of cobalt from cobalt-bearing materials according to claim 1 , further comprising a step of recovering cobalt and copper from the cobalt-bearing slag.

5. Process for the recovery of cobalt from cobalt-bearing materials according to claim 4 , wherein the step of recovering cobalt and copper from the cobalt-bearing slag comprises an acidic aqueous leaching operation.

6. Process for the recovery of cobalt from cobalt-bearing materials according to claim 4 , wherein the step of recovering cobalt and copper from the cobalt-bearing slag comprises a reducing smelting operation.

7. Process of claim 1 , comprising feeding cobalt-bearing materials, slag formers, impure alloy and one or more of copper matte and copper-nickel matte into the converter furnace.

8. Process of claim 1 , wherein the converter furnace is operated in tandem with a smelter.

9. Process of claim 1 , further comprising a smelting step, wherein the one or more of copper matte, copper-nickel matte, and impure alloy are produced in the smelting step.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 28, 2019
From: SUETENS, THOMAS; VAN HOREBEEK, DAVID
To: UMICORE
Reel/Frame 049293/0507 →
Priority Claims (1)
EP 16195075 · Oct 21, 2016 · regional
Continuity (1)
Related Publication 20190376159A1 · Dec 12, 2019