IP Library › Granted Patent US 12,150,201
Granted Patent B2
US 12,150,201 · App. 17/624,147 · Granted Nov 19, 2024

UE operation method related to sidelink DRX in wireless communication system

Inventors: Giwon Park (Seoul, KR); Jongyoul Lee (Seoul, KR)
Assignee: LG Electronics Inc.
H04W76/28H04W24/08H04W28/0268H04W92/18
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,150,201
App. No.
17/624,147
Granted
Nov 19, 2024
Kind
B2
Abstract

An embodiment provides a method for operating a user equipment (UE) for performing sidelink communication in a wireless communication system, the method comprising the steps of: monitoring a control signal for a sidelink operation in an on-duration of a sidelink DRX cycle, by the UE; and monitoring a control signal for a sidelink operation in a next on-duration of the sidelink DRX cycle after the on-duration of the sidelink DRX cycle, by the UE, wherein the sidelink DRX cycle corresponds to a sidelink DRX configuration determined on the basis of an PQI or an PC5 QoS flow identifier (PFI).

Claims (38)

1. An operation method of a user equipment (UE) for performing sidelink communication in a wireless communication system, the operation method comprising:

selecting, by the UE, a sidelink discontinuous reception (DRX) cycle and a sidelink on-duration mapped to a quality of service (QoS) associated with a groupcast,

performing, by the UE, monitoring of a control signal for a sidelink operation in the on-duration of the sidelink DRX cycle; and

performing, by the UE, monitoring of a control signal for the sidelink operation in a next sidelink on-duration after the sidelink on-duration,

wherein sidelink DRX parameters including the sidelink DRX cycle and the sidelink on-duration are mapped to the QoS associated with the groupcast.

2. The operation method of claim 1 , wherein a QoS profile is mapped to a sidelink DRX configuration including the sidelink DRX parameters.

3. The operation method of claim 2 , wherein an index related to the QoS is mapped to the sidelink DRX configuration.

4. The operation method of claim 3 , wherein the sidelink DRX parameters related to the sidelink DRX configuration includes on-duration.

5. The operation method of claim 1 , wherein the control signal for the sidelink operation includes information about a type of the UE that transmits the control signal for the sidelink operation.

6. The operation method of claim 5 , wherein the sidelink DRX cycle of the next sidelink on-duration is a short DRX cycle, based on the type of the UE related to one of a vehicle UE or a road side unit.

7. The operation method of claim 6 , wherein the UE switches the sidelink DRX cycle from a long DRX cycle to the short DRX cycle, based on the sidelink DRX cycle related to the long DRX cycle.

8. The operation method of claim 6 , wherein the UE switches the sidelink DRX cycle from the short DRX cycle to a long DRX cycle, based on failing to receive the information about the type of the UE related to the vehicle UE or the road side unit during a preset time in the short DRX cycle.

9. The operation method of claim 5 , wherein the information about the type of the UE is related to any one of a pedestrian UE, a vehicle UE, and a road side unit.

10. The operation method of claim 2 , wherein the sidelink DRX configuration is one of a sidelink DRX configuration related to a long DRX cycle and a sidelink DRX configuration related to a short DRX cycle.

11. The operation method of claim 3 , wherein the index related to the QoS is transferred to an access stratum (AS) layer from a vehicle-to-everything (V2X) layer of the UE.

12. The operation method of claim 1 , wherein the UE communicates with at least one of another UE, a UE related to an autonomous vehicle, a base station, or a network.

13. A user equipment (UE) in a wireless communication system, the UE comprising:

at least one processor; and

at least one computer memory operably connected to the at least one processor and

configured to store instructions for causing the at least one processor to perform operations based

on execution of the instructions,

wherein the operations include:

selecting a sidelink discontinuous reception (DRX) cycle and a sidelink on-duration mapped to a quality of service (QoS) associated with a groupcast,

performing monitoring of a control signal for a sidelink operation in the sidelink on duration of the sidelink DRX cycle; and

performing monitoring of the control signal for the sidelink operation in a next sidelink on-duration after the sidelink on-duration; and

wherein sidelink DRX parameters including the sidelink DRX cycle and the sidelink on-duration are mapped to the QoS associated with the groupcast.

14. A processor for performing operations for a user equipment (UE) in a wireless communication system,

wherein the operations include:

selecting a sidelink discontinuous reception (DRX) cycle and a sidelink on-duration mapped to a quality of service (QoS) associated with a groupcast,

performing monitoring of a control signal for a sidelink operation in a sidelink on-duration of the sidelink DRX cycle; and

performing monitoring of the control signal for the sidelink operation in a next sidelink on-duration after the sidelink on-duration, and

wherein sidelink DRX parameters including the sidelink DRX cycle and the sidelink on-duration are mapped to the QoS associated with the groupcast.

15. A computer readable storage medium for storing at least one computer program including instructions for causing at least one processor to perform operations for a user equipment (UE) based on execution of the instructions by the at least one processor,

wherein the operations include:

selecting a sidelink discontinuous reception (DRX) cycle and a sidelink on-duration mapped to a quality of service (QoS) associated with a groupcast,

performing monitoring of a control signal for a sidelink operation in the sidelink on-duration of the sidelink DRX cycle; and

performing monitoring of the control signal for the sidelink operation in a next sidelink on-duration after the sidelink on-duration, and

wherein sidelink DRX parameters including the sidelink DRX cycle and the sidelink on-duration are mapped to the QoS associated with the groupcast.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 18, 2022
From: PARK, GIWON; LEE, JONGYOUL
To: LG ELECTRONICS INC.
Reel/Frame 059946/0734 →
Priority Claims (1)
KR 10-2019-0080789 · Jul 4, 2019 · national
Continuity (1)
Related Publication 20220369417A1 · Nov 17, 2022
Cited By (2)
US 12,309,871 US 12,457,568