IP Library › Granted Patent US 12,188,452
Granted Patent B2
US 12,188,452 · App. 17/633,295 · Granted Jan 7, 2025

Tower for a wind turbine

Inventors: Juan Manuel Osorio Martinez (Burlada, ES); Vicente Señas Perez (Navarra, ES)
Assignee: SIEMENS GAMESA RENEWABLE ENERGY INNOVATION & TECHNOLOGY S.L.
F03D80/50E04H12/085E04H12/342F03D13/20F05B2230/61F05B2240/912
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,188,452
App. No.
17/633,295
Granted
Jan 7, 2025
Kind
B2
Abstract

A tower for a wind turbine extending axially along a longitudinal axis of the wind turbine includes a rail attached to an external surface of the tower, the rail providing a guide to which a service trolley is attachable in order to be movable along the rail. The tower includes: a plurality of axially adjacent tower segments, each tower segment extending axially between two axial ends, a respective flange being provided at one or both of the axial ends for connecting the respective tower segment to another tower segment. The rail is provided at the flange.

Claims (21)

1. A tower for a wind turbine-extending axially along a longitudinal axis of the wind turbine, the tower comprising:

a plurality of axially adjacent tower segments, each tower segment extending axially between two axial ends, a respective flange being provided at one or both of the two axial ends for connecting the respective tower segment to another tower segment; and

a rail attached to an external surface of at least one tower segment, the rail being provided at the flange, the rail providing a guide to which a service trolley is attachable in order to be movable along the rail.

2. The tower according to claim 1 , wherein the rail is curved.

3. The tower according to claim 2 , wherein the rail is coaxial with the longitudinal axis of the wind turbine.

4. The tower according to claim 3 , wherein the rail extends for 360° about the longitudinal axis of the wind turbine.

5. The tower according to claim 1 , wherein the flange is of the “T” type.

6. The tower according to claim 5 , wherein the flange comprises a first portion protruding inwards and a second portion protruding outwards, the rail being attached to the second portion of the flange.

7. The tower according to claim 5 , wherein bolts are provided for joining together two respective flanges provided at the respective axial ends of two tower segments.

8. The tower according to claim 6 , wherein holes for connecting bolts to the flange are provided on both the first portion and the second portion.

9. An assembly including the tower for the wind turbine according to claim 1 and a service trolley attached to the rail in order to be movable along the rail.

10. The assembly according to claim 9 , further comprising a service platform and a lifting apparatus for operating the service platform along an external surface of the tower, the lifting apparatus connecting the service platform to the service trolley.

11. The assembly according to claim 10 , wherein the lifting apparatus comprises a plurality of cables.

12. A method for mounting and/or servicing a tower for a wind turbine, the method comprising:

providing at least a first tower segment and a second tower segment, each tower segments extending axially between a first axial end and a second axial end, a respective flange being provided at one or both of the axial ends for connecting the respective tower segment to another tower segment, a rail being provided at the flange at least at the second axial end of the second tower segment;

attaching a service trolley on the rail in order to be movable along the rail;

attaching the second axial end of the first tower segment to the first axial end of the second tower segment;

fixing the first tower segment and the second tower segment to each other on an inner side of the first tower segment and the second tower segment;

attaching a service platform to the service trolley; and

using the service platform for fixing the first tower segment and the second tower segment to each other on an outer side of the first tower segment and the second tower segment.

13. The method according to claim 12 , wherein the service platform is attached to the service trolley and operated by means of a lifting apparatus including a plurality of cables.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 30, 2022
From: OSORIO MARTINEZ, JUAN MANUEL; SEÑAS PEREZ, VICENTE
To: SIEMENS GAMESA RENEWABLE ENERGY INNOVATION & TECHNOLOGY S.L.
Reel/Frame 060374/0849 →
Priority Claims (1)
EP 19380015 · Aug 9, 2019 · regional
Continuity (1)
Related Publication 20220282710A1 · Sep 8, 2022
References Cited (12)
US 6467233B1 · Maliszewski · 2002 [cited by examiner]
US 20140054110A1 · Fernandez Gomez · 2014 [cited by examiner]
US 20140286788A1 · Cho · 2014 [cited by examiner]
US 20190234096A1 · Fang · 2019 [cited by examiner]
US 20190338757A1 · Helmens · 2019 [cited by examiner]
EP 3260409A1 · 2017 [cited by applicant]
EP 3492736A1 · 2019 [cited by examiner]
KR 20120114981A · 2012 [cited by applicant]
KR 101225690B1 · 2013 [cited by applicant]
WO 2012119963A1 · 2012 [cited by applicant]
WO 2014150950A2 · 2014 [cited by applicant]
PCT International Search Report & Written Opinion mailed Nov. 12, 2020 corresponding to PCT International Application No. PCT/EP2020/071206. [cited by applicant]
Cited By (1)
US 12,442,359