IP Library › Granted Patent US 12,196,178
Granted Patent B2
US 12,196,178 · App. 18/284,315 · Granted Jan 14, 2025

Wind farm black start

Inventors: Paul Brian Brogan (Glasgow, GB); Douglas Elliott (Glasgow, GB); Thyge Knueppel (Værløse, DK)
Assignee: SIEMENS GAMESA RENEWABLE ENERGY A/S
F03D7/026F03D7/048H02J3/381F05B2260/85F05B2270/337H02J2300/28
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,196,178
App. No.
18/284,315
Granted
Jan 14, 2025
Kind
B2
Abstract

A method of performing a black start in a wind farm is provided, the wind farm including a primary black start enabled wind turbine, at least one secondary black start enabled wind turbine, and a wind farm grid interconnecting at least a part of the wind turbines in the wind farm, the method including (a) starting the primary black start enabled wind turbine in black start mode in order to supply voltage to the wind farm grid, (b) monitoring, at the at least one secondary black start enabled wind turbine, an electric parameter value in the wind farm grid, and (c) starting the at least one secondary black start enabled wind turbine in black start mode in order to supply voltage to the wind farm grid when the monitored electric parameter value meets a predetermined condition. A corresponding wind farm is also provided.

Claims (22)

1. A method of performing a black start in a wind farm, the wind farm comprising a primary black start enabled wind turbine, at least one secondary black start enabled wind turbine, and a wind farm grid interconnecting at least a part of the wind turbines in the wind farm, the method comprising;

starting the primary black start enabled wind turbine in black start mode in order to supply voltage to the wind farm grid;

monitoring, at the at least one secondary black start enabled wind turbine, an electric parameter value in the wind farm grid; and

starting the at least one secondary black start enabled wind turbine in black start mode in order to supply voltage to the wind farm grid when the electric parameter value meets a predetermined condition; and

wherein the electric parameter value is a code modulated onto the grid voltage, and wherein the predetermined condition is met when the code corresponds to a predetermined code.

2. The method according to claim 1 , wherein the code is modulated onto the grid voltage when the primary black start enabled wind turbine has been operating in black start mode for a predetermined period of time and/or when the voltage level in the wind farm grid reaches a predetermined voltage level and/or when the wind farm grid frequency is above or below a predetermined frequency value and/or when the primary black start enabled wind turbine has used a pre-determined amount of capacity.

3. The method according to claim 1 , wherein the at least one secondary black start enabled wind turbine comprises a plurality of secondary black start enabled wind turbines, and the predetermined condition is individual for each of the secondary black start enabled wind turbines.

4. The method according to claim 3 , wherein the predetermined condition is different for each of the secondary black start enabled wind turbines.

5. The method according to claim 3 , wherein the predetermined condition is identical for each of the secondary black start enabled wind turbines.

6. The method according to claim 3 , wherein the predetermined condition is a first predetermined condition for a first group of the secondary black start enabled wind turbines, and the predetermined condition is a second predetermined condition for a second group of the secondary black start enabled wind turbines.

7. The method according to claim 1 , wherein starting the primary black start enabled wind turbine occurs in response to receiving a black start initiation signal at the primary black start enabled wind turbine.

8. The method according to claim 1 , further comprising operating the at least one secondary black start enabled wind turbine in a black start stand-by mode prior to starting the preselected black start enabled wind turbine in black start mode.

9. The method according to claim 8 , wherein operating the at least one secondary black start enabled wind turbine in the black start stand-by mode is initiated when receiving the black start initiation signal at the at least one secondary black start enabled wind turbine.

10. A wind farm comprising;

a primary black start enabled wind turbine;

at least one secondary black start enabled wind turbine; and

a wind farm grid interconnecting at least a part of the wind turbines in the wind farm;

wherein the primary black start enabled wind turbine is configured to start operating in a black start mode in order to supply voltage to the wind farm grid; and

wherein the at least one secondary black start enabled wind turbine is configured to monitor an electric parameter value in the wind farm grid and to start operating in black start mode in order to supply voltage to the wind farm grid when the electric parameter value meets a predetermined condition; and

wherein the electric parameter value is a code modulated onto the grid voltage, and wherein the predetermined condition is met when the code corresponds to a predetermined code.

11. The wind farm according to claim 10 , further comprising at least one ordinary wind turbine that is not black start enabled.

12. The wind farm according to claim 10 , further comprising a controller configured to transmit a black start initiation signal to the primary black start enabled wind turbine and/or to the at least one secondary black start enabled wind turbine.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 13, 2024
From: BROGAN, PAUL BRIAN; ELLIOTT, DOUGLAS
To: SIEMENS GAMESA RENEWABLE ENERGY LIMITED
Reel/Frame 066449/0313 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 13, 2024
From: KNUEPPEL, THYGE
To: SIEMENS GAMESA RENEWABLE ENERGY A/S
Reel/Frame 066449/0329 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 13, 2024
From: SIEMENS GAMESA RENEWABLE ENERGY LIMITED
To: SIEMENS GAMESA RENEWABLE ENERGY A/S
Reel/Frame 066449/0434 →
Priority Claims (1)
EP 21165585 · Mar 29, 2021 · regional
Continuity (1)
Related Publication 20240151208A1 · May 9, 2024
References Cited (6)
US 11286903B2 · Brogan · 2022 [cited by examiner]
US 20150380942A1 · Premm · 2015 [cited by examiner]
US 20200400120A1 · Brogan · 2020 [cited by examiner]
WO WO2019166290A1 · 2019 [cited by examiner]
WO WO2019243055A1 · 2019 [cited by examiner]
International Search Report & Written Opinion for PCT/EP2022/056078, issued on Jul. 5, 2022. [cited by applicant]