IP Library › Granted Patent US 12,213,087
Granted Patent B2
US 12,213,087 · App. 17/290,254 · Granted Jan 28, 2025

IAB downlink timing

Inventors: Boris Dortschy (Hägersten, SE); Robert Baldemair (Solna, SE); Per-Erik Eriksson (Stockholm, SE); Yezi Huang (Täby, SE); Erik Dahlman (Stockholm, SE)
Assignee: TELEFONAKTIEBOLAGET LM ERICSSON (PUBL)
H04W56/001H04W56/004H04W88/14
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,213,087
App. No.
17/290,254
Granted
Jan 28, 2025
Kind
B2
Abstract

There is disclosed a method of operating an Integrated Access and Backhaul (IAB) node ( 200 , C, N 3 ) in a radio access network, the IAB node ( 200 , C, N 3 ) being connected to a first parent IAB node ( 200 , N 1 , P) via a first backhaul link having a first timing, and being connected to a second parent IAB node ( 200 , N 2 , P) via a second backhaul link having a second timing, the IAB node ( 200 , C, N 3 ) providing a communication link for access or backhaul, the communication link having a communication timing based on the first timing and the second timing. The disclosure also pertains to related methods and devices.

Claims (23)

1. A method of operating an Integrated Access and Backhaul (IAB) node in a radio access network, the IAB node being connected to a first parent IAB node via a first backhaul link having a first timing, and being connected to a second parent IAB node via a second backhaul link having a second timing, the method comprising:

providing a communication link for access or backhaul, the communication link having a communication timing based on the first timing and the second timing.

2. The method of claim 1 , wherein the method comprises basing the timing of transmission by the IAB node on the communication link on the communication timing.

3. The method of claim 1 , wherein method comprises basing the timing of reception by the IAB node on the communication link on the communication timing.

4. The method of claim 1 , wherein the method comprises basing the communication timing on a function of the first timing and the second timing.

5. The method of claim 1 , wherein the first timing is based on control signaling indicating timing and/or synchronization received from the first parent node, for the first backhaul link, and/or the second timing is based on control signaling indicating timing and/or synchronization received from the second parent node, for the second backhaul link.

6. The method of claim 1 , wherein the method comprises basing the communication timing on a timing synchronized relative to a donor node.

7. The method of claim 1 , wherein the method comprises basing the communication timing on a weighted sum of the first timing and the second timing.

8. The method of claim 1 , wherein the method comprises basing the communication timing on received power and/or signal quality.

9. The method of claim 1 , wherein the IAB node is connected, or adapted to be connected or connectable, to a plurality of parent nodes via associated backhaul links with corresponding timings.

10. The method of claim 1 , wherein the method comprises basing the communication timing on the number of parent nodes of the IAB node, and/or hop-count of a parent.

11. The method of claim 1 , wherein the method comprises basing the communication timing on link latency and/or propagation delay.

12. The method of claim 1 , wherein the method comprises basing the communication timing on historical information and/or numerology.

13. A network node for a radio access network, the network node being an Integrated Access and Backhaul (IAB) node, the network node comprising:

radio circuitry;

processing circuitry operatively coupled to the radio circuitry, wherein the processing circuitry is configured to:

connect the network node to a first parent IAB node via a first backhaul link having a first timing;

connect the network node to a second parent IAB node via a second backhaul link having a second timing; and

provide a communication link for access or backhaul, the communication link having a communication timing based on the first timing and the second timing.

14. A non-transitory computer-readable medium comprising, stored thereupon, computer program instructions configured for execution by a network node being an Integrated Access and Backhaul (IAB) node, the computer program instructions being configured to cause the network node to:

connect the network node to a first parent IAB node via a first backhaul link having a first timing;

connect the network node to a second parent IAB node via a second backhaul link having a second timing; and

provide a communication link for access or backhaul, the communication link having a communication timing based on the first timing and the second timing.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 30, 2021
From: DORTSCHY, BORIS; BALDEMAIR, ROBERT; ERIKSSON, PER-ERIK; HUANG, YEZI; DAHLMAN, ERIK
To: TELEFONAKTIEBOLAGET LM ERICSSON (PUBL)
Reel/Frame 056090/0662 →
Priority Claims (1)
SE 1800213-9 · Nov 2, 2018 · national
Continuity (1)
Related Publication 20210377885A1 · Dec 2, 2021
References Cited (8)
US 5363375A · Chuang · 1994 [cited by examiner]
US 20130039195A1 · Weng · 2013 [cited by examiner]
US 20180097541A1 · Bhattad · 2018 [cited by examiner]
US 20220053433A1 · Abedini · 2022 [cited by examiner]
US 20230043337A1 · Huang · 2023 [cited by examiner]
AT&T, “Enhancements to support NR backhaul links”, 3GPP TSG RAN WG1 Meeting #94bis, R1-1810690, Chengdu, China, Oct. 8-12, 2018, pp. 1-15. [cited by applicant]
CATT, “NR Physical Layer design for IAB backhaul link”, 3GPP TSG RAN WG1 Meeting #94bis, R1-1810538, Chengdu, China, Oct. 8-12, 2018, pp. 1-7. [cited by applicant]
Cewit, “On IAB timing alignment”, 3GPP TSG RAN WG1 Meeting #94bis, R1-1811554, Chengdu, China, Oct. 8-12, 2018, pp. 1-7. [cited by applicant]