IP Library › Granted Patent US 12,218,985
Granted Patent B2
US 12,218,985 · App. 17/753,378 · Granted Feb 4, 2025

Method for moving IMS voice session on non-3GPP to 3GPP access

Inventors: Myungjune Youn (Seoul, KR); Sehee Lee (Seoul, KR); Sungduck Chun (Seoul, KR); Hyunsook Kim (Seoul, KR); Laeyoung Kim (Seoul, KR); Sangmin Park (Seoul, KR)
Assignee: LG ELECTRONICS INC.
H04L65/1016H04L65/1069H04W36/00226H04W36/322H04W36/00695H04W36/144
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,218,985
App. No.
17/753,378
Granted
Feb 4, 2025
Kind
B2
Abstract

Provided in one embodiment of the present specification is a method for user equipment (UE) for an Internet protocol multimedia subsystem (IMS) voice session. The method can comprise the steps of: establishing an EMS voice session by using a non 3GPP interworking function (N3IWF) or an enhanced packet data gateway (ePDG) through non-3 rd generation partnership project (3GPP) access; determining that voice is not supported on a current NG-RAN on the basis of that the UE must moves the IMS voice session to a 3GPP access; and handing over a protocol data unit (PDU) session for the IMS voice session of the non-3GPP access to an evolved packet core (EPC) of the 3GPP access on the basis of the determination.

Claims (31)

1. A method of a Next Generation Radio Access Network (NG-RAN) for an Internet protocol Multimedia Subsystem (IMS) voice service, the method comprising:

receiving a Non-Access-Stratum (NAS) message including a Protocol Data Unit (PDU) session establishment request for establishment of a PDU session for an IMS voice service via a 3rd Generation Partnership Project (3GPP) access from a User Equipment (UE),

wherein the PDU session establishment request indicates an existing PDU session, based on a handover from a non-3GPP access to the 3GPP access for the UE,

wherein the UE had the existing PDU session for the IMS voice service via the non-3GPP access before the handover;

transmitting the NAS message including the PDU session establishment request to an Access and Mobility Management Function (AMF);

receiving a PDU session resource setup request for the PDU session for the IMS voice service from the AMF;

determining to trigger an Evolved Packet System (EPS) Fallback, or a radio access technology (RAT) Fallback, for the IMS voice session based on the NG-RAN not supporting the IMS voice service; and

transmitting a rejection of the establishment of the PDU session to the AMF, based on the determination to trigger the EPS Fallback or the RAT Fallback.

2. The method of claim 1 , further comprising:

ignoring the PDU session establishment request and not transmitting a response to the PDU session establishment request to the UE.

3. The method of claim 1 , further comprising:

transmitting, to the UE, a response to the PDU session establishment request so as to perform a handover of the UE to an EPS after the EPS fallback or the RAT Fallback.

4. The method of claim 1 , further comprising:

performing the handover from the non-3GPP access to the 3GPP access for the UE.

5. The method of claim 1 , wherein the transmitting the rejection of the establishment of the PDU session is performed during a procedure for the establishment of the PDU session.

6. A Next Generation Radio Access Network (NG-RAN) device comprising:

a transceiver;

at least one processor; and

at least one memory for storing instructions and electrically connected to the at least one processor,

wherein the instructions cause the at least one processor to perform operations comprising:

receiving a NAS (Non-Access-Stratum) message including a Protocol Data Unit (PDU) session establishment request for establishment of a PDU session for an Internet protocol Multimedia Subsystem (IMS) voice service via a 3rd Generation Partnership Project (3GPP) access from a User Equipment (UE),

wherein the PDU session establishment request indicates an existing PDU session, based on a handover from a non-3GPP access to the 3GPP access for the UE,

wherein the UE had the existing PDU session for the IMS voice service via the non-3GPP access before the handover;

transmitting the NAS message including the PDU session establishment request to an Access and Mobility Management Function (AMF);

receiving a PDU session resource setup request for the PDU session for the IMS voice service from the AMF;

determining to trigger an Evolved Packet System (EPS) Fallback, or a radio access technology (RAT) Fallback, for the IMS voice session based on the NG-RAN not supporting the IMS voice service; and

transmitting a rejection of the establishment of the PDU session to the AMF, based on the determination to trigger the EPS Fallback or the RAT Fallback.

7. The NG-RAN of claim 6 , wherein the operations further comprise ignoring the PDU establishment request and not transmitting a response to the PDU session establishment request to the UE.

8. The NG-RAN of claim 6 , wherein the operations further comprise transmitting, to the UE, a response to the PDU session establishment request so as to perform a handover of the UE to an EPS after the EPS fallback or the RAT Fallback.

9. The NG-RAN of claim 6 , wherein the operations further comprise performing the handover from the non-3GPP access to the 3GPP access for the UE.

10. The NG-RAN of claim 6 , wherein the transmitting the rejection of the establishment of the PDU session is performed during procedure for the establishment of the PDU session.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 1, 2022
From: YOUN, MYUNGJUNE; LEE, SEHEE; CHUN, SUNGDUCK; KIM, HYUNSOOK; KIM, LAEYOUNG; PARK, SANGMIN
To: LG ELECTRONICS INC.
Reel/Frame 059136/0070 →
Priority Claims (4)
KR 10-2019-0111686 · Sep 9, 2019 · national
KR 10-2019-0115632 · Sep 19, 2019 · national
KR 10-2019-0127408 · Oct 15, 2019 · national
KR 10-2019-0138390 · Nov 1, 2019 · national
Continuity (1)
Related Publication 20220345949A1 · Oct 27, 2022
References Cited (31)
US 11974218B2 · Cuevas Ramirez · 2024 [cited by examiner]
US 20100329243A1 · Buckley et al. · 2010 [cited by examiner]
US 20130324125A1 · Bachmann et al. · 2013 [cited by examiner]
US 20150350983A1 · Kwok et al. · 2015 [cited by applicant]
US 20180352483A1 · Youn et al. · 2018 [cited by applicant]
US 20180359663A1 · Kim et al. · 2018 [cited by applicant]
US 20190007500A1 · Kim et al. · 2019 [cited by examiner]
US 20190058741A1 · Mufti et al. · 2019 [cited by applicant]
US 20190335534A1 · Atarius et al. · 2019 [cited by examiner]
US 20200275259A1 · Zhu et al. · 2020 [cited by examiner]
US 20200314702A1 · Rahman · 2020 [cited by examiner]
US 20200336953A1 · Liu et al. · 2020 [cited by examiner]
CN 107864461 · 2018 [cited by applicant]
CN 109155949 · 2019 [cited by applicant]
KR 20150079927 · 2015 [cited by applicant]
WO WO2012040251A1 · 2012 [cited by examiner]
WO WO2012040251A2 · 2012 [cited by examiner]
WO 2018231813 · 2018 [cited by applicant]
WO WO2020049347A1 · 2020 [cited by examiner]
CN 109257779 A) >>> first access network device sending third session management information to the session management network element, establishing the user plane tunnel the third session management information compris… [cited by examiner]
KR 20190004217 A) >>> Method for PDU Session Anchor Relocation and 5G Network Registration (see title) (Year: 2019). [cited by examiner]
PCT International Application No. PCT/KR2020/012081, International Search Report dated Dec. 3, 2020, 5 pages. [cited by applicant]
3rd Generation Partnership Project, “Technical Specification Group Services and System Aspects; System Architecture for the 5G System; Stage 2 (Release 16),” 3GPP TS 23.501 V16.1.0, Jun. 2019, 369 pages. [cited by applicant]
3rd Generation Partnership Project, “Technical Specification Group Services and System Aspects; Procedures for the 5G System; Stage 2 (Release 16),” 3GPP TS 23.502 V16.1.1, Jun. 2019, 496 pages. [cited by applicant]
The State Intellectual Property Office of the People's Republic of China Application Serial No. 202080073682.2, Office Action dated Sep. 8, 2023, 6 pages. [cited by applicant]
Nokia et al., “Voice fallback during roaming scenarios,” 3GPP TSG-SA2 Meeting #127, S2-183253, Apr. 2018, 4 pages. [cited by applicant]
Huawei, “Support of EPS fallback for IMS Voice,” 3GPP TSG-RAN WG3#99, R2-180818, Feb.-Mar. 2018, 6 pages. [cited by applicant]
The State Intellectual Property Office of the People's Republic of China Application Serial No. 202080073682.2, Office Action dated Mar. 30, 2023, 8 pages. [cited by applicant]
European Patent Office Application Serial No. 20864188.6, Search Report dated Aug. 2, 2022, 14 pages. [cited by applicant]
3rd Generation Partnership Project, “Technical Specification Group Services and System Aspects; System Architecture for the 5G System; Stage 2 (Release 16),” 3GPP TS 23.501 V16.2.0, Sep. 2019, 392 pages. [cited by applicant]
Telecom Italia et al., “Alignment of IMS Voice Service via EPS Fallback with RAN specifications,” S2-1906390, SA WG2 Meeting #133, May 2019, 5 pages. [cited by applicant]