IP Library Granted Patent US 12,241,264
Granted Patent B2
US 12,241,264 · App. 17/752,422 · Granted Mar 4, 2025

Pour in place foam insulation for building components

Inventors: Kathryn Miks (Littleton, CO); Ralph Michael Fay (Columbine Valley, CO); Yusheng Zhao (Littleton, CO); Chanel Charbonneau (Littleton, CO)
Assignee: Johns Manville
E04F21/085C08G18/664E04B1/7604
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,241,264
App. No.
17/752,422
Granted
Mar 4, 2025
Kind
B2
Abstract

A building component manufacturing method may include providing an insulated structural component of a building. The insulated structural component may include a frame comprising a plurality of outer components coupled together to define an outer periphery of one or more sections. At least one of the sections may include a cavity. The method may include applying a pour-in-place insulation material within the cavity to insulate the component. The pour-in-place insulation material may transition from a liquid state to a solid state to form a first layer of insulation within the cavity. The method may include monitoring a fill level within the cavity while applying the pour-in-place insulation material. The method may include controlling a flow rate of the pour-in-place insulation material based on the monitoring of the fill level within the cavity.

Claims (28)

1. A building component manufacturing method comprising:

providing a structural component of a building, the structural component comprising:

a frame comprising a plurality of outer components coupled together to define an outer periphery of one or more sections, wherein at least one of the sections comprises a cavity;

applying a pour-in-place insulation material within the cavity to insulate the structural component, wherein the pour-in-place insulation material transitions from a liquid state to a solid state to form a first layer of insulation within the cavity;

monitoring, using one or more sensors, a fill level of the pour-in-place insulation material within the cavity relative to a desired fill level while applying the pour-in-place insulation material; and

controlling a flow rate of the pour-in-place insulation material based on the fill level within the cavity as determined by the one or more sensors, wherein controlling the flow rate comprises adjusting the flow rate of the pour-in-place insulation material at one or more locations to achieve the desired fill level based on the fill level within the cavity as determined by the one or more sensors and an expansion rate of the pour-in-place insulation material.

2. The building component manufacturing method of claim 1 , wherein:

the structural component further comprises a generally planar surface, the frame being positioned atop one side of the generally planar surface so that a lateral boundary of the cavity is defined by the at least one of the sections and a base of the cavity is defined by the generally planar surface.

3. The building component manufacturing method of claim 1 , wherein applying the pour-in-place insulation material comprises:

positioning one or more nozzles over the cavity; and

injecting the pour-in-place insulation material within the cavity through the one or more nozzles.

4. The building component manufacturing method of claim 1 , wherein:

the pour-in-place insulation material is characterized by a viscosity of between about 250 centipoise and about 800 centipoise, wherein the viscosity is measured at a temperature of about 75 degrees Fahrenheit.

5. The building component manufacturing method of claim 1 , wherein:

the first layer of insulation is characterized by a density between about 0.3 pounds per square foot and about 10.0 pounds per cubic foot.

6. The building component manufacturing method of claim 1 , wherein:

the first layer of insulation is characterized by an insulation R value of greater than or about R−3 per inch of the first layer of insulation.

7. The building component manufacturing method of claim 1 , wherein:

monitoring the fill level within the cavity comprises detecting, using the one or more sensors, the fill level of the pour-in-place insulation material, a fill level of the first layer of insulation, or both within the cavity.

8. The building component manufacturing method of claim 1 , further comprising:

monitoring the fill level within the cavity comprises detecting that the fill level of the pour-in-place insulation material at the one or more locations of the cavity are below or above a desired fill level.

9. The building component manufacturing method of claim 1 , further comprising:

subsequent to the pour-in-place insulation material transitioning to the solid state and forming the first layer of insulation, detecting at least one location of the cavity that has an incomplete fill level; and

applying an additional volume of the pour-in-place insulation material within the cavity to further fill the cavity.

10. The building component manufacturing method of claim 1 , wherein:

the first layer of insulation is applied at a site where the building component is manufactured, wherein the site where the building component is manufactured is remote from a site where the building component is to be installed.

11. The building component manufacturing method of claim 1 , wherein:

the expansion rate of the pour-in-place insulation material comprises one or both of a current expansion rate and an empirical expansion rate.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 18, 2022
From: MIKS, KATHRYN; FAY, RALPH MICHAEL; ZHAO, YUSHENG; CHARBONNEAU, CHANEL
To: JOHNS MANVILLE
Reel/Frame 060532/0558 →
Continuity (1)
Related Publication 20230383550A1 · Nov 30, 2023
References Cited (14)
US 8495852B2 · Fay · 2013 [cited by applicant]
US 8950142B2 · Fay · 2015 [cited by applicant]
US 9309663B2 · Fay · 2016 [cited by applicant]
US 9522492B2 · Arnauts · 2016 [cited by examiner]
US 10183425B2 · Arnauts · 2019 [cited by examiner]
US 10272613B2 · Boyd · 2019 [cited by applicant]
US 10478942B2 · Lipinski et al. · 2019 [cited by applicant]
US 11953311B2 · Dorneanu · 2024 [cited by examiner]
US 20200149297A1 · You · 2020 [cited by examiner]
US 20200392279A1 · Mcadams · 2020 [cited by examiner]
US 20210252543A1 · Lambach et al. · 2021 [cited by applicant]
US 20230331995A1 · Orf · 2023 [cited by examiner]
US 20230383550A1 · Miks · 2023 [cited by examiner]
WO 2021083969A1 · 2021 [cited by applicant]