IP Library › Granted Patent US 12,242,249
Granted Patent B2
US 12,242,249 · App. 17/774,546 · Granted Mar 4, 2025

Operation method and operation system for operating production facilities of a same kind

Inventors: Tomohiko Ito (Tokyo, JP); Kazuhira Ichikawa (Tokyo, JP); Shingo Sugioka (Tokyo, JP); Hiroyuki Shimamoto (Tokyo, JP); Tetsuya Yamamoto (Tokyo, JP)
Assignee: JFE Steel Corporation
G05B19/41815G05B2219/32085
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,242,249
App. No.
17/774,546
Filed
May 5, 2022
Granted
Mar 4, 2025
Kind
B2
Art Unit
2118
USPC
700/112
Abstract

An operation method for production facilities operates production facilities of a same kind located at production sites, and includes: a data information preparation step of aggregating operational data of each of the production facilities for each of the production sites; a data accumulation step of accumulating the operational data aggregated at the data information preparation step into a computer located at a data accumulation site; a data analysis step of analyzing an operation status of each of the production facilities, using the operational data accumulated at the data accumulation step; a data display step of displaying information on analyzed the operation status of each of the production facilities on a display unit located at each of the production sites; and a facility operation step of referring to the displayed information and operating a production facility located at a second production site from a first production site.

Claims (30)

1. An operation method for production facilities for operating a plurality of production facilities of a same kind located at a plurality of production sites, the operation method comprising:

a data information preparation step of aggregating operational data of each of the production facilities for each of the production sites;

a data accumulation step of accumulating the operational data aggregated at the data information preparation step into a computer located at a data accumulation site;

a data analysis step of analyzing an operation status of each of the production facilities, using the operational data accumulated at the data accumulation step;

an operation status determination step of determining whether the operation is abnormal at each of the production facilities, based on an analysis result of the data analysis step;

a data display step of displaying information on the operation status of each of the production facilities analyzed at the data analysis step on a display unit located at each of the production sites; and

a facility operation step of referring to the information displayed at the data display step and operating a production facility located at a second production site from a first production site,

wherein the operation status determination step includes a step of determining whether the operation is abnormal, using an operation indicator, operational data and at least one piece of metadata of operating conditions, the operation indicator, operational data and operation conditions being converted into a same scale,

wherein the step of determining whether the operation is abnormal comprises using indices calculated for each of the production sites, wherein the indices are converted into the same scale by defining one index of the indices as a first index, calculating a mean value of the first index obtained in a period in which the facility is presumably normal in a production status in the past, and dividing the first index obtained sequentially by the mean value to yield a second index, whereby the facility statuses of the different production facilities of the same kind are compared.

2. The operation method for production facilities according to claim 1 , wherein

the data display step includes a step of displaying information on a current operation status of each of the production facilities on a display device located at a management site different from the production sites, and

the facility operation step includes a step of operating the production facility located at the second production site from the management site, instead of the first production site.

3. The operation method for production facilities according to claim 2 , comprising, instead of the facility operation step, an information presentation step of presenting, from the first production site or the management site to an operation operator at a production facility located at the second production site, operation guidance information on the production facility.

4. The operation method for production facilities according to claim 3 , wherein

the facility operation step or the information presentation step is performed when at least one of the production facilities is determined to have an operational abnormality.

5. The operation method for production facilities according to claim 1 , wherein each of the plurality of production sites includes a production facility of the same kind differing from each other in volume and shape.

6. The operation method for production facilities according to claim 1 , wherein the production sites are steelworks.

7. The operation method for production facilities according to claim 6 , wherein the facility is a blast furnace.

8. An operation system for production facilities for operating a plurality of production facilities of a same kind located at a plurality of production sites, the operation system comprising:

a data information preparation unit configured to aggregate operational data of each of the production facilities for each of the production sites;

a data accumulation unit configured to accumulate the operational data aggregated by the data information preparation unit;

a data analysis unit configured to analyze an operation status of each of the production facilities, using the operational data accumulated by the data accumulation unit;

an operation status determination unit configured to determine whether the operation is abnormal at each of the production facilities, based on an analysis result of the data analysis unit;

a display unit located at each of the production sites and configured to display information on the operation status of each of the production facilities analyzed by the data analysis unit; and

a facility operation unit configured to refer to the information displayed on the display unit and operate a production facility located at a second production site from a first production site,

wherein the operation status determination unit is configured to determine whether the operation is abnormal, using an operation indicator, operational data and at least one piece of metadata of operating conditions, the operation indicator, operational data and operation conditions being converted into a same scale,

wherein the operation status determination step unit is configured to determine whether the operation is abnormal by using indices calculated for each of the production sites, wherein the indices are converted into the same scale by defining one index of the indices as a first index, calculating a mean value of the first index obtained in a period in which the facility is presumably normal in a production status in the past, and dividing the first index obtained sequentially by the mean value to yield a second index, whereby the facility statuses of the different production facilities of the same kind are compared.

9. The operation system according to claim 8 , wherein each of the plurality of production sites includes a production facility of the same kind differing from each other in volume and shape.

10. The operation system according to claim 8 , wherein the production sites are steelworks.

11. The operation system according to claim 10 , wherein the facility is a blast furnace.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jul 27, 2022
From: ITO, TOMOHIKO; ICHIKAWA, KAZUHIRA; SUGIOKA, SHINGO; SHIMAMOTO, HIROYUKI; YAMAMOTO, TETSUYA
To: JFE STEEL CORPORATION
Reel/Frame 060636/0232 →
Priority Claims (1)
JP 2019-205417 · Nov 13, 2019 · national
Continuity (1)
Related Publication 20220390930A1 · Dec 8, 2022
References Cited (71)
US 8352197B2 · Rantala et al. · 2013 [cited by applicant]
US 9274520B2 · Ali et al. · 2016 [cited by applicant]
US 10386827B2 · Enver et al. · 2019 [cited by applicant]
US 10806534B2 · Hashimoto et al. · 2020 [cited by applicant]
US 20020040251A1 · Ogushi et al. · 2002 [cited by applicant]
US 20040158474A1 · Karschnia et al. · 2004 [cited by applicant]
US 20060100731A1 · Sugihara et al. · 2006 [cited by applicant]
US 20110054802A1 · Rantala et al. · 2011 [cited by applicant]
US 20150077263A1 · Ali et al. · 2015 [cited by applicant]
US 20170102694A1 · Enver et al. · 2017 [cited by applicant]
US 20170139398A1 · Tsuzuki et al. · 2017 [cited by applicant]
US 20170351226A1 · Bliss · 2017 [cited by examiner]
US 20180052451A1 · Billi-Duran · 2018 [cited by examiner]
US 20180052903A1 · Mercado · 2018 [cited by examiner]
US 20180081344A1 · Romatier et al. · 2018 [cited by applicant]
US 20180137277A1 · Mestha · 2018 [cited by examiner]
US 20180203439A1 · Hattori et al. · 2018 [cited by applicant]
US 20180224834A1 · Rischar et al. · 2018 [cited by applicant]
US 20180231969A1 · Noda · 2018 [cited by examiner]
US 20180243916A1 · Hashimoto et al. · 2018 [cited by applicant]
US 20180357334A1 · Chao · 2018 [cited by examiner]
US 20180372583A1 · Tezuka · 2018 [cited by examiner]
US 20190129675A1 · Ochiai · 2019 [cited by examiner]
US 20190146423A1 · Salsbury · 2019 [cited by examiner]
US 20190278259A1 · Tsuzuki et al. · 2019 [cited by applicant]
US 20190369607A1 · Enver et al. · 2019 [cited by applicant]
US 20200004230A1 · Ankermann et al. · 2020 [cited by applicant]
US 20200068759A1 · Cvijetinovic · 2020 [cited by examiner]
US 20200201309A1 · Maruyama et al. · 2020 [cited by applicant]
US 20200264595A1 · Shibata · 2020 [cited by examiner]
US 20210232131A1 · Imanari · 2021 [cited by examiner]
US 20220091590A1 · Hanada · 2022 [cited by examiner]
US 20220390928A1 · Ito et al. · 2022 [cited by applicant]
CN 106933205A · 2017 [cited by applicant]
CN 107921639A · 2018 [cited by applicant]
EA 023264B1 · 2016 [cited by applicant]
JP 2003005816A · 2003 [cited by applicant]
JP 2004240513A · 2004 [cited by applicant]
JP 2004334492A · 2004 [cited by applicant]
JP 2004341822A · 2004 [cited by applicant]
JP 2005018282A · 2005 [cited by applicant]
JP 2006139514A · 2006 [cited by applicant]
JP 2008305259A · 2008 [cited by applicant]
JP 2012022612A · 2012 [cited by applicant]
JP 2015170055A · 2015 [cited by applicant]
JP WO2014038082A · 2016 [cited by applicant]
JP 2016189166A · 2016 [cited by applicant]
JP 2017128805A · 2017 [cited by applicant]
JP 2018132786A · 2018 [cited by applicant]
KR 20170114141A · 2017 [cited by applicant]
KR 20180026495A · 2018 [cited by applicant]
RU 2126056C1 · 1999 [cited by applicant]
RU 2636095C2 · 2017 [cited by applicant]
WO 2016033247A2 · 2016 [cited by applicant]
WO 2018145947A1 · 2018 [cited by applicant]
WO 2021095594A1 · 2021 [cited by applicant]
Office Action (Communication pursuant to Article 94(3) (EPC) issued May 13, 2024, by the European Patent Office in corresponding European Patent Application No. 20 887 724.1. (5 pages). [cited by applicant]
Korean Office Action for Korean Application No. 10-2022-7014616, issued May 11, 2024 with Concise Statement of Relevance of Office Action. (6 pages). [cited by applicant]
Roschina et al., “Operation, Repair and Maintenance of Building and Constructions”, Training Manual, Vladimir Publishing House of Vladimir State University, 2005, with an English abstract, 109 pages. [cited by applicant]
Russian Office Action for Russian Application No. 2022115478, dated Jan. 3, 2023, with translation, 14 pages. [cited by applicant]
Extended European Search Report for European Application No. 20887724.1, dated Nov. 21, 2022, 12 pages. [cited by applicant]
International Search Report and Written Opinion for International Application No. PCT/JP2020/041117, dated Dec. 28, 2020, 5 pages. [cited by applicant]
European Communication for Application No. 20887724.1, dated Oct. 10, 2023, 6 pages. [cited by applicant]
Office Action issued by the U.S. Patent and Trademark Office in U.S. Appl. No. 17/774,551, mailed Nov. 18, 2024, U.S. Patent and Trademark Office, Alexandria, VA. (10 pages). [cited by applicant]
Non-Final Office Action issued by the U.S. Patent and Trademark Office in U.S. Appl. No. 17/774,551, mailed Jul. 9, 2024, U.S. Patent and Trademark Office, Alexandria, VA. (52 of pages). [cited by applicant]
Chinese Office Action with Search Report dated Mar. 1, 2023, issued in the corresponding Chinese Patent Application No. 202080078599.4, 11 pages. [cited by applicant]
Communication Pursuant to Article 94(3) EPC dated Oct. 17, 2023, issued in the corresponding European Patent Application No. 20887024.6, 5 pages. [cited by applicant]
Extended European Search Report dated Nov. 21, 2022, issued in the corresponding European Patent Application No. 20887024.6, 9 pages. [cited by applicant]
International Search Report and Written Opinion for International Application PCT/JP2020/041116, dated Dec. 28, 2020, 13 pages including 6 pages of English Translation. [cited by applicant]
Korean Office Action for Korean Application No. 10-2022-7014502, dated May 11, 2024 with Concise Statement of Relevance of Office Action, 6 pages. [cited by applicant]
Russian Office Action dated Jan. 12, 2023, issued in the corresponding Russian Patent Application No. 2022112691, 12 pages including 4 pages of English Translation. [cited by applicant]