Electrical power grid interconnections

Inventors: Leo Francis Casey (San Francisco, CA); Xinyue Li (San Mateo, CA); Page Furey Crahan (San Francisco, CA); Raymond Daly (Palo Alto, CA); Peter Evans (Los Altos Hills, CA); Xing Chen (Sunnyvale, CA); Amanda McNary (Redwood City, CA)
Assignee: X Development LLC
G06F30/20G06T11/001G06T11/206H02J3/00H02J13/00001H02J13/00006G06F2113/04G06T2200/24H02J2203/20
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,242,775
App. No.
17/354,012
Granted
Mar 4, 2025
Kind
B2
Abstract

A computer-implemented method executed by one or more processors includes receiving interconnection data for a proposed interconnection to a power grid; accessing a power grid model including a topological representation of the power grid, electrical specifications of grid components, and empirical operation characteristics; and generating, using the interconnection data for the proposed interconnection to the power grid, and the power grid model, simulated power grid data. The simulated power grid data is based on simulating operation of the power grid with the proposed interconnection coupled to a location of the power grid identified by the interconnection data during a simulated time period. The simulated power grid data includes a plurality of different temporal and spatially dependent characteristics of the power grid. The method includes evaluating, using one or more metrics, the simulated power grid data; and outputting evaluation results of the one or more metrics.

Claims (61)

1. A computer-implemented method executed by one or more processors, the method comprising:

receiving interconnection data for a proposed interconnection to a power grid, wherein the proposed interconnection comprises an electrical power source or planned electrical power source that has not previously connected to the power grid;

accessing a power grid model comprising a topological representation of the power grid, electrical specifications of grid components, and empirical operation characteristics;

generating, using the interconnection data for the proposed interconnection to the power grid and the power grid model, simulated power grid data, wherein:

the simulated power grid data is based on simulating operation of the power grid with the proposed interconnection coupled to a location of the power grid identified by the interconnection data during a simulated time period, and

the simulated power grid data comprises a plurality of different temporal and spatially dependent characteristics of the power grid;

evaluating the simulated power grid data, including comparing the simulated power grid data to one or more metrics derived from industry standards for power grid operations; and

outputting evaluation results indicating, for each metric of the one or more metrics, whether simulated operation of the power grid with the proposed interconnection coupled to the location of the power grid identified by the interconnection data satisfies the metric.

2. The method of claim 1 , wherein the evaluation results comprise pass or fail results for each of the one or more metrics.

3. The method of claim 1 , wherein the simulated time period comprises a simulated year.

4. The method of claim 3 , wherein generating simulated power grid data comprises generating simulated power grid data for each hour of the simulated year.

5. The method of claim 1 , wherein the power grid model comprises:

a model of real-world power grid assets; and

a model of one or more previously proposed interconnections to the power grid that has not previously connected to the power grid.

6. The method of claim 1 , wherein the interconnection data for the proposed interconnection to the power grid comprises one or more of a location, a size, a positioning, a power output, or a connecting phase of the proposed interconnection.

7. The method of claim 1 , wherein the plurality of different temporal and spatially dependent characteristics comprise one or more of voltage, current, power, power factor, utilization, or temperature.

8. The method of claim 1 , further comprising:

generating, using the power grid model, pre-interconnection simulated power grid data representing power grid operations without the proposed interconnection coupled to the power grid;

evaluating, using the one or more metrics, the pre-interconnection simulated power grid data to output pre-interconnection evaluation results indicating, for each metric of the one or more metrics, whether simulated operation of the power grid without the proposed interconnection coupled to the power grid satisfies the metric; and

comparing the evaluation results for the simulated operation of the power grid with the proposed interconnection to the pre-interconnection evaluation results to determine a change in evaluation results caused by the proposed interconnection.

9. The method of claim 1 , further comprising:

modifying the interconnection data for the proposed interconnection by changing at least one of a location, size, positioning, power output, or connecting phase of the proposed interconnection;

generating, using the modified interconnection data for the proposed interconnection, modified simulated power grid data;

evaluating, the modified simulated power grid data to output modified evaluation results indicating, for each metric of the one or more metrics, whether simulated operation of the power grid with the modified proposed interconnection satisfies the metric;

determining that the modified evaluation results are improved over the evaluation results; and

in response, outputting the modified interconnection data for the proposed interconnection.

10. The method of claim 2 , wherein outputting evaluation results comprises outputting, for each failed metric, a margin between a value of the simulated power grid data and a passing value for the metric.

11. The method of claim 1 , wherein outputting evaluation results of the one or more metrics comprises generating a graphical user interface (GUI) comprising a graph representing the evaluation results, wherein the graph comprises:

an x-axis representing progression of time measured by a first time increment over a first time period;

a y-axis representing progression of time measured by a second time increment over a second time period, wherein the second time period is equal to the first time increment; and

a plurality of points, wherein:

each of the plurality of points corresponds to an x-axis coordinate and a y-axis coordinate and represents a time interval occurring during the first time period; and

a color shading of each of the plurality of points represents a number of violations of an electrical grid parameter during the time interval, wherein in response to a user selecting a point of the graph, the GUI displays a corresponding evaluation result.

12. The method of claim 1 , wherein outputting evaluation results of the one or more metrics comprises generating a GUI comprising a map view of the evaluation results, wherein the map view comprises:

a line-diagram representation of power lines of the power grid overlaid on a map of a geographic region in which the power grid is located, the line-diagram comprising a plurality of line segments, wherein a color shading of each line segment represents the evaluation results at a particular spatial location of the power grid, wherein in response to a user selecting a line segment in the map view, the GUI displays a corresponding evaluation result.

13. The method of claim 1 , wherein the one or more metrics include voltage constraint metrics derived from industry standards for power grid operations.

14. The method of claim 13 , wherein the voltage constraint metrics define criteria for at least one of:

steady-state voltage;

transient voltage;

voltage variability; and

overvoltage.

15. The method of claim 1 , wherein the evaluation results include particular grid locations and times of simulated violations of the one or more metrics over the simulated time period.

16. The method of claim 1 , wherein the evaluation results include a number of violations of the one or more metrics that are simulated to occur over the simulated time period.

17. A system comprising one or more computers and one or more storage devices on which are stored instructions that are operable, when executed by the one or more computers, to cause the one or more computers to perform operations comprising:

receiving interconnection data for a proposed interconnection to a power grid, wherein the proposed interconnection comprises an electrical power source or planned electrical power source that has not previously connected to the power grid;

accessing a power grid model comprising a topological representation of the power grid, electrical specifications of grid components, and empirical operation characteristics;

generating, using the interconnection data for the proposed interconnection to the power grid and the power grid model, simulated power grid data, wherein:

the simulated power grid data is based on simulating operation of the power grid with the proposed interconnection coupled to a location of the power grid identified by the interconnection data during a simulated time period, and

the simulated power grid data comprises a plurality of different temporal and spatially dependent characteristics of the power grid;

evaluating the simulated power grid data, including comparing the simulated power grid data to one or more metrics derived from industry standards for power grid operations; and

outputting evaluation results indicating, for each metric of the one or more metrics, whether simulated operation of the power grid with the proposed interconnection coupled to the location of the power grid identified by the interconnection data satisfies the metric.

18. The system of claim 17 , wherein the evaluation results comprise pass or fail results for each of the one or more metrics.

19. The system of claim 17 , wherein the simulated time period comprises a simulated year, and wherein generating simulated power grid data comprises generating simulated power grid data for each hour of the simulated year.

20. A non-transitory computer storage medium encoded with instructions that, when executed by one or more computers, cause the one or more computers to perform operations comprising:

receiving interconnection data for a proposed interconnection to a power grid, wherein the proposed interconnection comprises an electrical power source or planned electrical power source that has not previously connected to the power grid;

accessing a power grid model comprising a topological representation of the power grid, electrical specifications of grid components, and empirical operation characteristics;

generating, using the interconnection data for the proposed interconnection to the power grid and the power grid model, simulated power grid data, wherein:

the simulated power grid data is based on simulating operation of the power grid with the proposed interconnection coupled to a location of the power grid identified by the interconnection data during a simulated time period, and

the simulated power grid data comprises a plurality of different temporal and spatially dependent characteristics of the power grid;

evaluating the simulated power grid data, including comparing the simulated power grid data to one or more metrics derived from industry standards for power grid operations; and

outputting evaluation results indicating, for each metric of the one or more metrics, whether simulated operation of the power grid with the proposed interconnection coupled to the location of the power grid identified by the interconnection data satisfies the metric.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 22, 2021
From: CASEY, LEO FRANCIS; LI, XINYUE; CRAHAN, PAGE FUREY; DALY, RAYMOND; EVANS, PETER; CHEN, XING; MCNARY, AMANDA
To: X DEVELOPMENT LLC
Reel/Frame 056615/0981 →
Continuity (2)
Provisional Application 63045360 · Jun 29, 2020
Related Publication 20210406425A1 · Dec 30, 2021
References Cited (11)
US 7860702B1 · Evans et al. · 2010 [cited by applicant]
US 10423884B2 · Hyde et al. · 2019 [cited by applicant]
US 10444806B2 · Brockman et al. · 2019 [cited by applicant]
US 20050033481A1 · Budhraja · 2005 [cited by examiner]
US 20080109205A1 · Nasle · 2008 [cited by examiner]
US 20120191439A1 · Meagher et al. · 2012 [cited by applicant]
US 20150006128A1 · Enenkel · 2015 [cited by examiner]
US 20160139212A1 · Lin et al. · 2016 [cited by applicant]
US 20170046458A1 · Meagher et al. · 2017 [cited by applicant]
International Search Report and Written Opinion in International Appln. No. PCT/US2021/038347, dated Oct. 12, 2021, 14 pages. [cited by applicant]
International Preliminary Report on Patentability in International Appln. No. PCT/US2021/038347, dated Jan. 12, 2023, 9 pages. [cited by applicant]