IP Library Granted Patent US 12,245,220
Granted Patent B2
US 12,245,220 · App. 17/630,888 · Granted Mar 4, 2025

Sidelink control information design

Inventors: Umer Salim (Guangdong, CN); Virgile Garcia (Guangdong, CN); Sebastian Wagner (Guangdong, CN)
Assignee: JRD COMMUNICATION (SHENZHEN) LTD.
H04W72/1263H04L1/0003H04L5/0051H04W72/02H04W72/20
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,245,220
App. No.
17/630,888
Granted
Mar 4, 2025
Kind
B2
Abstract

Methods for the transmission of SCI messages in sidelink communications for the reservation of resources. The modulation and coding scheme of a second stage SCI may be indicated in the first stage SCI.

Claims (16)

1. A method for transmission of scheduling and control information for sidelink communications, the method comprising steps performed at a mobile device of:

receiving and decoding a first stage Sidelink Control Information (SCI) carrying scheduling information,

receiving a second stage SCI indicated by the first stage SCI, and

decoding the second stage SCI at an intended receiver,

wherein the second stage SCI uses lower order modulation including Quadrature Phase Shift Keying (QPSK),

wherein the coded bits of the second stage SCI are mapped from a lowest physical resource block (PRB) locations in the scheduled resource for Physical Sidelink Shared Channel (PSSCH), and

wherein a modulation and coding scheme for the second stage SCI is indicated in the first stage SCI as a row index for a mapping table comprising modulation and coding schemes values for the second stage SCI.

2. A method according to claim 1 , a modulation and coding scheme for the first stage SCI is indicated as part of the resource pool configuration.

3. A method according to claim 1 , wherein

the first stage SCI indicates the SCI of the associated second stage SCI.

4. A method according to claim 1 , wherein

the mapping of the second stage SCI in PSSCH starts from a front-loaded demodulation reference symbol DMRS symbol over unused resource elements.

5. A method according to claim 1 , wherein

the first stage SCI indicates a modulation and coding scheme of the associated second stage SCI.

6. A method according to claim 1 , further comprising

a step of identifying from the scheduling information in the first stage SCI if the mobile device is the intended receiver of the second stage SCI.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 8, 2022
From: SALIM, UMER; GARCIA, VIRGILE; WAGNER, SEBASTIAN
To: JRD COMMUNICATION (SHENZHEN) LTD.
Reel/Frame 059548/0347 →
Continuity (2)
Provisional Application 62883422 · Aug 6, 2019
Related Publication 20220272727A1 · Aug 25, 2022
References Cited (21)
US 20200351136A1 · Hwang · 2020 [cited by examiner]
US 20220022150A1 · Khoryaev · 2022 [cited by applicant]
US 20220159674A1 · Deng · 2022 [cited by examiner]
CN 106063352A · 2016 [cited by applicant]
WO 2018175842A1 · 2018 [cited by applicant]
Huawei et al:“Design and contents of PSCCH and PSFCH”, 3GPP Draft; R1-1906596, 3rd Generation Partnershop Project (3GPP), Mobile Competence Centre; 650, Route Des Lucioles; F-06921 Sophia-Antipolis Cedex; France, vol. R… [cited by examiner]
Interdigital Inc:“On Physical Layer Structure for NR V2X Sidelink”, 3GPP Draft; R1-1905400, 3rd Generation Partership Project (3GPP), Mobile Competence Centre; 650, Route Des Lucioles; F-06921 Sophia-Antipolis Cedex; Fr… [cited by examiner]
Nokia et al. “Discussion of physical layer structure for sidelink” 3GPP TSG RAN WG1 #97 R1-1906074, May 17, 2019. section 2.2, Appendix (Year: 2019). [cited by examiner]
International Search Report (with English translation) and the Written Opinion issued in PCT/CN2020/105384, dated Oct. 28, 2020. [cited by applicant]
Nokia et al. “Discussion of physical layer structure for sidelink” 3GPP TSG RAN WG1 #97 R1-1906074, May 17, 2019. section 2.2, Appendix. [cited by applicant]
Fujitsu. “Discussion on physical layer structure for NR sidelink” 3GPP TSG RAN WGI #97 R1-1906436, May 17, 2019, the whole document. [cited by applicant]
Samsung. “Feature lead summary for agenda item 7.2.4.1 Physical layer structure for sidelink” 3GPP TSG RAN WG1 #96bis Meeting R1-1905665, Apr. 12, 2019. the whole document. [cited by applicant]
TCL Communications. “Physical Layer Structure for Sidelink” 3GPP TSG RAN WG1 Meeting #97 R1-1907047, May 17, 2019. the whole document. [cited by applicant]
European Search Report in European Application No. 20850126.2,mailed on Jul. 12, 2023. [cited by applicant]
Interdigital Inc:“On Physical Layer Structure for NR V2X Sidelink”, 3GPP Draft; R1-1905400, 3rd Generation Partership Project (3GPP), Mobile Competence Centre; 650, Route Des Lucioles; F-06921 Sophia-Antipolis Cedex; Fr… [cited by applicant]
ZTE et al: “NR sidelink physical layer structure”, 3GPP Draft; R1-1906457 NR Sidelink Physical Layer Structure, 3rd Generation Partnership Project (3GPP), Mobile Competence Centre; 650, Route Des Lucioles; F-06921 Sophi… [cited by applicant]
ZTE et al: “NR sidelink physical layer structure”, 3GPP Draft; R1-1904814 NR Sidelink Physical Layer Structure, 3rd Generation Partnership Project (3GPP), Mobile Competemce Centre; 650, Route Des Lucioles; F-06921 Sophi… [cited by applicant]
Huawei et al:“Design and contents of PSCCH and PSFCH”, 3GPP Draft; R1-1906596, 3rd Generation Partnershop Project (3GPP), Mobile Competence Centre; 650, Route Des Lucioles; F-06921 Sophia-Antipolis Cedex; France, vol. R… [cited by applicant]
Ericsson: “PHY layer structure for NR sidelink”, 3GPP Draft; R1-1907134 Ericsson-PHY Layer Structure for NR Sidelink, 3rd Generation Partnership Project (3GPP), Mobile Competence Centre; 650, Route Des Lucioles; F-06921… [cited by applicant]
NTT Docomo et al:“NR Sidelink Physical Layer Structure”, 3GPP Draft; R1-1905421, 3rd Generation Partnership Project(3GPP), Mobile Competence Centre; 650, Route Des Lucioles; F-06921 Sophia-Antipolis Cedex; France, Apr. … [cited by applicant]
Office Action issued Chinese Application No. 202080054669.2, mailed Jan. 15, 2025, with English translation. [cited by applicant]