IP Library › Granted Patent US 12,259,298
Granted Patent B2
US 12,259,298 · App. 17/398,488 · Granted Mar 25, 2025

Pressure testing apparatus and method

Inventors: Robert Turner Clarke (Cambridge, CA); Robert Cassin McFadden (Ottawa, CA); Valen Varangu-Booth (Branchton, CA)
Assignee: Robert Turner Clarke
G01M3/26
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,259,298
App. No.
17/398,488
Granted
Mar 25, 2025
Kind
B2
Abstract

An apparatus for pressure testing a plumbing system, including a fluid pump; a conduit assembly coupled to the fluid pump, a control system communicatively coupled to the conduit assembly to operate the conduit assembly according to a preset operating schedule to acquire a set of pressure data; and an input-output communications device communicatively coupled to the control system to receive a set of pressure data and provide the set of pressure data to a user.

Claims (28)

1. A method of pressure testing a plumbing system, comprising:

coupling a portable pressure testing apparatus to the plumbing system;

pressurizing the plumbing system to a predetermined start pressure using a fluid pump of the portable pressure testing apparatus;

recording, using a control system of the portable pressure testing apparatus, a system pressure of the plumbing system for a predetermined period of time using a pressure sensor of the portable pressure testing apparatus;

recording, using a location system of the portable pressure testing apparatus, a location of the portable pressure testing apparatus while recording the system pressure, the location including barometer data; and

providing the system pressure of the plumbing system for the predetermined period of time and the location together as a record of the pressure testing, and

prior to pressurizing the plumbing system to a predetermined start pressure using the fluid pump of the portable pressure testing apparatus:

operating the fluid pump to pre-pressurize an upstream portion of a conduit assembly of the portable pressure testing apparatus while the conduit assembly is fluidly separate from the plumbing system, the upstream portion leading from the fluid pump; and

fluidly joining the fluid pump and the plumbing system via the pre-pressurized conduit assembly.

2. The method of claim 1 , further comprising adding an installer company identifier and an operator identifier to the record of the pressure testing.

3. The method of claim 1 , wherein the record identifies a building and a floor of the building at which the system pressure of the plumbing system for the predetermined period of time was collected.

4. The method of claim 3 , further comprising adding an installer company identifier and an operator identifier to the record of the pressure testing.

5. A method of testing the pressure of a plumbing system, comprising:

joining a fluid pump to the plumbing system via a conduit assembly of a pressure testing apparatus to form a joined system;

running a pressure testing cycle of the pressure testing apparatus, the pressure testing cycle including:

pressurizing the joined system to a first prescribed pressure of a plurality of prescribed pressures according to a preset operating schedule using the fluid pump of the pressure testing apparatus;

after the joined system is at the first prescribed pressure, closing at least one testing branch of the conduit assembly to prevent fluid leakage from the joined system through the at least one testing branch and keeping the at least one testing branch closed for a first testing time of a plurality of testing times according to the preset operating schedule;

after the first testing time, opening the at least one testing branch and pressurizing the joined system to a second prescribed pressure of the plurality of prescribed pressures;

after the joined system is at the second prescribed pressure, closing the at least one testing branch to prevent fluid leakage from the joined system through the at least one testing branch and keeping the at least one testing branch closed for a second testing time of the plurality of testing times;

monitoring the pressure of the joined system during the plurality of testing times using a pressure sensor of the pressure testing apparatus to compile a set of pressure data, the set of pressure data being time-stamped to show when the set of pressure data was obtained; and

storing the set of pressure data on a data storage device to form a forensic record, and

prior to pressurizing the joined system to the first prescribed pressure:

fluidly separating the fluid pump from the plumbing system;

operating the fluid pump to pre-pressurize an upstream portion of the conduit assembly, the upstream portion leading from the fluid pump; and

fluidly joining the fluid pump and the plumbing system via the pre-pressurized conduit assembly.

6. The method of claim 5 , wherein the second prescribed pressure is lower than the first prescribed pressure.

7. The method of claim 5 , wherein the pressure testing cycle further includes determining a location of the pressure testing apparatus during the testing time using a location sensor of the pressure testing apparatus, including the location in the forensic record, and including clock time information in the forensic record.

8. The method of claim 5 , wherein the conduit assembly includes a hot water line branch to be joined to a hot water line of the plumbing system and a cold water line branch to be joined to a cold water line of the plumbing system, and the hot water line branch and the cold water line branch may be independently closed.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 24, 2025
From: INTEGRATED PRESSURE SOLUTIONS INC.
To: CLARKE, ROBERT TURNER
Reel/Frame 070306/0167 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Oct 19, 2021
From: CLARKE, ROBERT TURNER; MCFADDEN, ROBERT CASSIN; VARANGU-BOOTH, VALEN
To: INTEGRATED PRESSURE SOLUTIONS INC.
Reel/Frame 057829/0675 →
Continuity (2)
Provisional Application 63064178 · Aug 11, 2020
Related Publication 20220050005A1 · Feb 17, 2022
References Cited (85)
US 374008A · Schuyler · 1887 [cited by examiner]
US 2873764A · Lombard et al. · 1959 [cited by applicant]
US 2959955A · Pasquale · 1960 [cited by applicant]
US 3460376A · Kemp · 1969 [cited by applicant]
US 3577768A · Aprill, Jr. · 1971 [cited by examiner]
US 3584500A · Diehl · 1971 [cited by examiner]
US 3756072A · MacMurray · 1973 [cited by examiner]
US 3827282A · Brister · 1974 [cited by examiner]
US 4497290A · Harris · 1985 [cited by examiner]
US 4542642A · Tagliarino · 1985 [cited by examiner]
US 4580442A · Jones · 1986 [cited by examiner]
US 4599890A · Girone et al. · 1986 [cited by applicant]
US 4608857A · Mertens · 1986 [cited by examiner]
US 4998434A · Asbra · 1991 [cited by examiner]
US 4998435A · Miller et al. · 1991 [cited by applicant]
US 5201213A · Henning · 1993 [cited by examiner]
US 5323640A · Porcaro · 1994 [cited by examiner]
US 5499529A · Kronberg · 1996 [cited by examiner]
US 5548993A · Alexander · 1996 [cited by examiner]
US 5705737A · Liao · 1998 [cited by examiner]
US 5850037A · Mullins · 1998 [cited by examiner]
US 5866802A · Kimata et al. · 1999 [cited by applicant]
US 6116082A · Pride · 2000 [cited by applicant]
US 6279383B1 · Balke · 2001 [cited by examiner]
US 6311548B1 · Breidenbach · 2001 [cited by examiner]
US 6651486B1 · Johnson · 2003 [cited by examiner]
US 6758975B2 · Peabody · 2004 [cited by examiner]
US 6826957B2 · Martone · 2004 [cited by examiner]
US 6862918B2 · Saxton · 2005 [cited by applicant]
US 6955170B1 · Mullins · 2005 [cited by examiner]
US 7013711B1 · Herbers · 2006 [cited by examiner]
US 7086272B2 · Wu · 2006 [cited by examiner]
US 7185529B2 · Ball · 2007 [cited by examiner]
US 7210336B1 · Chapman · 2007 [cited by examiner]
US 7263873B2 · Richey · 2007 [cited by examiner]
US 7409852B2 · Herzog · 2008 [cited by examiner]
US 7788967B2 · Golding · 2010 [cited by examiner]
US 7841229B2 · Ridgway · 2010 [cited by examiner]
US 7971472B2 · Sleijpen · 2011 [cited by examiner]
US 8074627B2 · Siddiqui · 2011 [cited by examiner]
US 8554497B2 · Hamilton · 2013 [cited by examiner]
US 8771085B1 · Clyde · 2014 [cited by examiner]
US 8798913B2 · Humphrey · 2014 [cited by examiner]
US 8862055B2 · Mirbaha · 2014 [cited by examiner]
US 9086187B2 · Gibb · 2015 [cited by examiner]
US 9239008B2 · Ekanayake · 2016 [cited by examiner]
US 9261426B2 · Penza · 2016 [cited by examiner]
US 9429493B2 · Halliwill · 2016 [cited by examiner]
US 9541467B2 · McCollom · 2017 [cited by examiner]
US 9855395B2 · Jaffe · 2018 [cited by examiner]
US 9910054B2 · Johns · 2018 [cited by examiner]
US 9967022B2 · Jurkowitz, Jr. · 2018 [cited by examiner]
US 10067973B2 · Moore · 2018 [cited by examiner]
US 10082249B2 · Albertao et al. · 2018 [cited by applicant]
US 10190298B2 · Slate · 2019 [cited by examiner]
US 10288519B2 · De La Cruz · 2019 [cited by examiner]
US 10295430B2 · Qiu · 2019 [cited by examiner]
US 10458880B2 · Levine · 2019 [cited by examiner]
US 10605692B2 · Hilpert · 2020 [cited by examiner]
US 10755545B2 · Sudo · 2020 [cited by examiner]
US 10851728B2 · Bryan · 2020 [cited by examiner]
US 10898329B2 · Marquez · 2021 [cited by examiner]
US 11035749B2 · Sixsmith · 2021 [cited by examiner]
US 11121887B2 · Khalid · 2021 [cited by examiner]
US 11300472B2 · Platel · 2022 [cited by examiner]
US 11549837B2 · Klicpera · 2023 [cited by examiner]
US 20040118186A1 · Shultis · 2004 [cited by examiner]
US 20060033075A1 · Harris · 2006 [cited by examiner]
US 20120102323A1 · Lin · 2012 [cited by examiner]
US 20170044744A1 · Everhart · 2017 [cited by examiner]
US 20180094415A1 · Slate · 2018 [cited by examiner]
US 20190234786A1 · Klicpera · 2019 [cited by applicant]
US 20190360888A1 · Carey · 2019 [cited by examiner]
US 20200080878A1 · Banerjee · 2020 [cited by examiner]
US 20200088618A1 · Voight · 2020 [cited by examiner]
US 20200096413A1 · Banerjee · 2020 [cited by examiner]
US 20210199214A1 · Sorlie · 2021 [cited by examiner]
US 20210310428A1 · Bryan · 2021 [cited by examiner]
EP 2177889A1 · 2010 [cited by examiner]
GB 2553833A · 2018 [cited by examiner]
2015 Uniform Plumbing Code, International Association of Plumbing and Mechanical Officials, 2015. (Year: 2015). [cited by examiner]
Building Certificate Of Plumbing Compliance, Government of Tasmania, 24ay 2013 (Year: 2013). [cited by examiner]
Tasmania Building Act 2000, Government of Tasmania, 2000. (Year: 2000). [cited by examiner]
“Plumbing Rough-In Pressure Test PSI”, Home Improvement Forums, available on the internet at <https://diy.stackexchange.com/questions/86177/plumbing-rough-in-pressure-test-psi>, Mar. 2016. (Year: 2016). [cited by examiner]
Karen Kent et al., “Guide to Integrating Forensic Techniques into Incident Response”, National Institute of Standards and Technology Special Publication 800-86, U.S. Department of Commerce, Aug. 2006. (Year: 2006). [cited by examiner]