IP Library › Granted Patent US 12,261,785
Granted Patent B2
US 12,261,785 · App. 17/741,816 · Granted Mar 25, 2025

Apparatus and method for multiplexing switching of integrated access and backhaul node in wireless communication system

Inventors: Seunghoon Choi (Suwon-si, KR); Youngbum Kim (Suwon-si, KR); Hyunseok Ryu (Suwon-si, KR); Sungjin Park (Suwon-si, KR)
Assignee: Samsung Electronics Co., Ltd.
H04L5/0023H04L5/0053H04W88/14
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,261,785
App. No.
17/741,816
Granted
Mar 25, 2025
Kind
B2
Abstract

The disclosure relates to a 5th generation (5G) or 6th generation (6G) communication system for supporting a higher data transmission rate. A method performed by an integrated access and backhaul (IAB) node in a wireless communication system is provided. The method includes receiving multiplexing related configuration information of a mobile termination (MT) of the IAB node and a distributed unit (DU) of the IAB node from an upper IAB node, the multiplexing including spatial division multiplexing (SDM), frequency division multiplexing (FDM), and time division multiplexing (TDM), performing fallback from the FDM or the SDM to the TDM, and in response to the fallback, based on the configuration information, transmitting and receiving data of the DU of the IAB node.

Claims (62)

1. A method performed by a first integrated access and backhaul (IAB) node in a wireless communication system, the method comprising:

receiving, from a second IAB node, multiplexing scheme configuration information of data transmitted or received by a mobile termination (MT) and a distributed unit (DU) included in the first IAB node;

based on the multiplexing scheme configuration information, determining a multiplexing scheme to be used by the first IAB node to among a spatial division multiplexing (SDM) scheme or a frequency division multiplexing (FDM) scheme;

transmitting or receiving data using the SDM scheme or the FDM scheme;

identifying whether a fallback condition from the SDM scheme or the FDM scheme to a time division multiplexing, TDM, scheme is satisfied;

controlling data transmission and reception of the MT, and data transmission and reception of the DU on an allocated radio resource for transmission and reception of the TDM scheme based on the multiplexing scheme configuration information and the data transmission and reception of the MT before switching to the TDM scheme, in case that the data transmission and reception of the MT on the allocated radio resource is not complete,

wherein the allocated radio resource is determined a soft type resource, for the transmission and reception of the MT that does not affect the transmission and reception of the DU, or

wherein the transmission and reception of the MT has priority to the data transmission and reception of the DU; and

switching the multiplexing scheme to be used by the first IAB node to the TDM scheme, in case that the fallback condition to the TDM scheme is satisfied.

2. The method of claim 1 ,

wherein the multiplexing scheme configuration information comprises at least one of information for switching to the TDM scheme, the FDM scheme or the SDM scheme, information of a radio resource type controlled by the DU of the first IAB node, or beam related information to be used in the SDM scheme, and

wherein the radio resource type controlled by the DU of the first IAB node comprises one of a soft type indicating whether the radio resource is available for the DU, a hard type indicating that the radio resource is always available, or a non-available (NA) type indicating that the radio resource is always unavailable.

3. The method of claim 2 , wherein the beam related information comprises at least one of resource type information to be configured in at least one beam, transmission configuration indication (TCI) state identification information or quasi-co-located (QCL) information.

4. The method of claim 1 , wherein the controlling of the data transmission and reception of the MT, and the data transmission and reception of the DU on the allocated radio resource for the transmission and reception of the TDM scheme comprises:

transmitting, to the second IAB node, information indicating that the data transmission or reception of the MT is not guaranteed.

5. The method of claim 1 ,

wherein the multiplexing scheme configuration information is received through at least one of higher layer signaling, a backhaul signal, or physical layer signaling, and

wherein the second IAB node is one of a base station or an upper IAB node.

6. The method of claim 1 , wherein the identifying of whether the fallback condition to the TDM scheme is satisfied is based on one of whether an indication is received from the second IAB node, whether a beam failure is detected, or a communication environment of the first IAB node.

7. A method performed by a second integrated access and backhaul (IAB) node in a wireless communication system, the method comprising:

transmitting, from a first IAB node, multiplexing scheme configuration information of data transmitted or received by a mobile termination (MT) and a distributed unit (DU) included in the first IAB node;

based on the multiplexing scheme configuration information, transmitting or receiving data to or from the first IAB node using one of a spatial division multiplexing (SDM) scheme or a frequency division multiplexing (FDM) scheme;

receiving, from the first IAB node, information indicating that data transmission or reception of the MT is not guaranteed based on fallback to a time division multiplexing (TDM) scheme of the first IAB node;

allocating a radio resource for the data transmission or reception of the MT of the first IAB node; and

transmitting, to the first IAB node, information on the allocated radio resource.

8. The method of claim 7 ,

wherein the multiplexing scheme configuration information comprises at least one of information for switching to the TDM scheme, the FDM scheme or the SDM scheme, information of a radio resource type controlled by the DU of the first IAB node, or beam related information to be used in the SDM scheme, and

wherein the radio resource type controlled by the DU of the first IAB node comprises one of a soft type indicating whether the radio resource is available for the DU, a hard type indicating that the radio resource is always available, or a non-available (NA) type indicating that the radio resource is always unavailable.

9. A first integrated access and backhaul (IAB) node in a wireless communication system, the first IAB node comprising:

a transceiver; and

at least one processor coupled with the transceiver,

wherein the at least one processor is configured to:

receive, from a second IAB node, multiplexing scheme configuration information of data transmitted or received by a mobile termination (MT) and a distributed unit (DU) included in the first IAB node,

based on the multiplexing scheme configuration information, determine a multiplexing scheme to be used by the first IAB node to among a spatial division multiplexing (SDM) scheme or a frequency division multiplexing (FDM) scheme,

transmit or receive data using the SDM scheme or the FDM scheme,

identify whether a fallback condition from the SDM scheme or the FDM scheme to a time division multiplexing (TDM) scheme is satisfied,

control data transmission and reception of the MT, and data transmission and reception of the DU on allocated radio resource for transmission and reception of the TDM scheme based on the multiplexing scheme configuration information and the data transmission and reception of the MT before switching to the TDM scheme, in case that the data transmission and reception of the MT on the allocated radio resource is not complete,

wherein the allocated radio resource is determined a soft type resource, for the transmission and reception of the MT that does not affect the transmission and reception of the DU, or

wherein the transmission and reception of the MT has priority to the data transmission and reception of the DU, and

switch the multiplexing scheme to be used by the first IAB node to the TDM scheme, in case that the fallback condition to the TDM scheme is satisfied.

10. The first IAB node of claim 9 ,

wherein the multiplexing scheme configuration information comprises at least one of information for switching to the TDM scheme, the FDM scheme or the SDM scheme, information of a radio resource type controlled by the DU of the first IAB node, or beam related information to be used in the SDM scheme, and

wherein the radio resource type controlled by the DU of the first IAB node comprises one of a soft type indicating whether the radio resource is available for the DU, a hard type indicating that the radio resource is always available, or a non-available (NA) type indicating that the radio resource is always unavailable.

11. The first IAB node of claim 10 , wherein the beam related information comprises at least one of resource type information to be configured in at least one beam, transmission configuration indication (TCI) state identification information and quasi-co-located (QCL) information.

12. The first IAB node of claim 9 , wherein, controlling the data transmission and reception of the MT, and the data transmission and reception of the DU on the allocated radio resource for transmission and reception of the TDM scheme, the at least one processor is configured to:

transmit, to the second IAB node, information indicating that the data transmission or reception of the MT is not guaranteed.

13. The first IAB node of claim 9 ,

wherein the multiplexing scheme configuration information is received through at least one of higher layer signaling, a backhaul signal or physical layer signaling, and

wherein the second IAB node is one of a base station or an upper IAB node.

14. The first IAB node of claim 9 , wherein the identifying of whether the fallback condition to the TDM scheme is satisfied is based on whether an indication is received from the second IAB node, whether beam failure is detected, or a communication environment of the first IAB node.

15. A second integrated access and backhaul (IAB) node in a wireless communication system, the second IAB node comprising:

a transceiver; and

at least one processor coupled with the transceiver,

wherein the at least one processor is configured to:

transmit, from a first IAB node, multiplexing scheme configuration information of data transmitted or received by a mobile termination (MT) and a distributed unit (DU) included in a first IAB node,

based on the multiplexing scheme configuration information, transmit or receive data to or from the first IAB node using one of a spatial division multiplexing (SDM) scheme or a frequency division multiplexing (FDM) scheme,

receive, from the first IAB node, information indicating that data transmission or reception of the MT is not guaranteed based on fallback to a time division multiplexing (TDM) scheme of the first IAB node,

allocate a radio resource for the data transmission or reception of the MT of the first IAB node, and

transmit, to the first IAB node, information on the allocated radio resource.

16. The second IAB node of claim 15 ,

wherein the multiplexing scheme configuration information comprises at least one of information for switching to the TDM scheme, the FDM scheme or the SDM scheme, information of a radio resource type controlled by the DU of the first IAB node, or beam related information to be used in the SDM scheme, and

wherein the radio resource type controlled by the DU of the first IAB node comprises one of a soft type indicating whether the radio resource is available for the DU, a hard type indicating that the radio resource is always available, or a non-available (NA) type indicating that the radio resource is always unavailable.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded May 11, 2022
From: CHOI, SEUNGHOON; KIM, YOUNGBUM; RYU, HYUNSEOK; PARK, SUNGJIN
To: SAMSUNG ELECTRONICS CO., LTD.
Reel/Frame 059892/0613 →
Priority Claims (1)
KR 10-2021-0060754 · May 11, 2021 · national
Continuity (1)
Related Publication 20220368478A1 · Nov 17, 2022
References Cited (16)
US 20200275499A1 · Novlan et al. · 2020 [cited by applicant]
US 20210235476A1 · Luo · 2021 [cited by examiner]
US 20220225286A1 · Cirik · 2022 [cited by examiner]
US 20220337344A1 · Gao · 2022 [cited by examiner]
US 20240080810A1 · Kurita · 2024 [cited by examiner]
CN 101300805B · 2011 [cited by examiner]
WO 2020202190A1 · 2020 [cited by applicant]
3GPP TS 38.300 V17.0.0, 3rd Generation Partnership Project, Technical Specification Group Radio Access Network, NR, NR and NG-RAN Overall Description, Stage 2 (Release 17), Mar. 2022. [cited by applicant]
3GPP TS 38.473 V17.0.0, 3rd Generation Partnership Project, Technical Specification Group Radio Access Network, NG-RAN, F1 application protocol (F1AP) (Release 17), Apr. 2022. [cited by applicant]
Ericsson, Resource multiplexing and DC in enhanced IAB, R1-2103712, 3GPP TSG-RAN WG1 Meeting #104-bis-e, eMeeting, Apr. 6, 2021. [cited by applicant]
NTT DOCOMO, INC., Resource multiplexing between child and parent links of an IAB node, R1-2103591, 3GPP TSG RAN WG1 #104bis-e, e-Meeting, Apr. 7, 2021. [cited by applicant]
Cewit et al., Discussions on enhancements to resource multiplexing between child and parent links of an IAB node, R1-2103374, 3GPP TSG-RAN WG1 Meeting #104b-e, e-Meeting, Apr. 7, 2021. [cited by applicant]
VIVO, Enhancement to resource multiplexing between child and parent links, R1-2102538, 3GPP TSG RAN WG1 #104b-e, e-Meeting, Apr. 6, 2021. [cited by applicant]
International Search Report and Written Opinion dated Aug. 18, 2022, issued in International Patent Application No. PCT/KR2022/006744. [cited by applicant]
Moderator (AT&T), “Feature Lead Summary #4 of 8.10.1”, R1-2202874, 3GPP TSG RAN WG1 #108-e, Mar. 4, 2022, XP052122344. [cited by applicant]
Extended European Search Report dated Jul. 19, 2024, issued in European Patent Application No. 22807837.4. [cited by applicant]