IP Library Granted Patent US 12,262,252
Granted Patent B2
US 12,262,252 · App. 17/766,058 · Granted Mar 25, 2025

Method and apparatus for performing handover procedure in wireless communication system

Inventors: Donggun Kim (Suwon-si, KR); Soenghun Kim (Suwon-si, KR)
Assignee: Samsung Electronics Co., Ltd.
H04W36/0011H04W36/08H04W36/185H04W36/302
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,262,252
App. No.
17/766,058
Granted
Mar 25, 2025
Kind
B2
Abstract

An operating method of a user equipment (UE) in a wireless communication system according to an embodiment of the disclosure may include receiving configuration information from a source base station (BS), determining, based on the configuration information, whether Dual Active Protocol Stack (DAPS) handover is configured for at least one bearer, based on a result of the determining, maintaining a link to the source BS, performing the DAPS handover on a target BS, suspending a Signaling Radio Bearer (SRB) configured for the source BS, and establishing a SRB for the target BS, when it is determined that the DAPS handover fails, determining whether a radio link failure (RLF) occurs in the link to the source BS, and based on a result of the determining, when the RLF does not occur in the link to the source BS, resuming the SRB configured for the source BS and reporting the failure of the DAPS handover.

Claims (48)

1. A method performed by a user equipment (UE) in a wireless communication system, the method comprising:

receiving, from a source base station, a message including reconfiguration with sync;

starting a first timer;

in case that a dual active protocol stack (DAPS) bearer is configured based on the message, establishing a radio link control (RLC) entity for a target base station and suspending a signaling radio bearer (SRB) for the source base station;

in case that the first timer expires and a radio link between the UE and the source base station is active, releasing the RLC entity for the target base station, resuming the suspended SRB for the source base station, and transmitting a DAPS handover failure report to the source base station; and

in case that the first timer expires and the radio link between the UE and the source base station is not active, performing a radio resource control (RRC) re-establishment procedure.

2. The method of claim 1 , further comprising:

in case that a condition for starting a third timer is satisfied, starting the third timer while a second timer is running.

3. The method of claim 2 , wherein the first timer is a T304 timer, the second timer is a T310 timer, and the third timer is a T312 timer.

4. The method of claim 1 , further comprising:

in case that the DAPS bearer is configured and out-of-sync indications are received from lower layer entities and the first timer is running, starting a second timer for the source base station.

5. The method of claim 4 , further comprising:

in case that in-sync indications are received from the lower layer entities while the second timer is running, stopping the second timer and stopping a third timer if running.

6. The method of claim 5 , wherein the first timer is a T304 timer, the second timer is a T310 timer, and the third timer is a T312 timer.

7. The method of claim 1 ,

wherein the RRC re-establishment procedure is performed in case that a third timer expires.

8. A user equipment (UE) in a wireless communication system, the UE comprising:

a transceiver; and

at least one processor coupled with the transceiver,

wherein the at least one processor is configured to:

receive, from a source base station, a message including reconfiguration with sync,

start a first timer,

in case that a dual active protocol stack (DAPS) bearer is configured based on the message, establish a radio link control (RLC) entity for a target base station and suspend a signaling radio bearer (SRB) for the source base station,

in case that the first timer expires and a radio link between the UE and the source base station is active, release the RLC entity for the target base station, resume the suspended SRB for the source base station, and transmit a DAPS handover failure report to the source base station, and

in case that the first timer expires and the radio link between the UE and the source base station is not active, perform a radio resource control (RRC) re-establishment procedure.

9. The UE of claim 8 , wherein the at least one processor is further configured to:

in case that a condition for starting a third timer is satisfied, start the third timer while a second timer is running.

10. The UE of claim 9 , wherein the first timer is a T304 timer, the second timer is a T310 timer, and the third timer is a T312 timer.

11. The UE of claim 8 , wherein the at least one processor is further configured to:

in case that the DAPS bearer is configured and out-of-sync indications are received from lower layer entities and the first timer is running, start a second timer for the source base station.

12. The UE of claim 11 , wherein the at least one processor is further configured to:

in case that in-sync indications are received from the lower layer entities while the second timer is running, stop the second timer and stop a third timer if running.

13. The UE of claim 12 , wherein the first timer is a T304 timer, the second timer is a T310 timer, and the third timer is a T312 timer.

14. The UE of claim 8 , wherein the RRC re-establishment procedure is performed in case that a third timer expires.

15. A method performed by a source base station in a wireless communication system, the method comprising:

transmitting, to a user equipment (UE), a message including reconfiguration with sync,

wherein a first timer is started at the UE,

wherein in case that a dual active protocol stack (DAPS) bearer is configured based on the message, a radio link control (RLC) entity for a target base station is established at the UE and a signaling radio bearer (SRB) for the source base station is suspended at the UE,

wherein in case that the first timer expires and a radio link between the UE and the source base station is active, the RLC entity for the target base station is released at the UE, the suspended SRB for the source base station is resumed at the UE, and a DAPS handover failure report is transmitted to the source base station at the UE, and

wherein in case that the first timer expires and the radio link between the UE and the source base station is not active, a radio resource control (RRC) re-establishment procedure is performed at the UE.

16. A source base station in a wireless communication system, the source base station comprising:

a transceiver; and

at least one processor coupled with the transceiver and configured to:

transmit, to a user equipment (UE), a message including reconfiguration with sync,

wherein a first timer is started at the UE,

wherein in case that a dual active protocol stack (DAPS) bearer is configured based on the message, a radio link control (RLC) entity for a target base station is established at the UE and a signaling radio bearer (SRB) for the source base station is suspended at the UE,

wherein in case that the first timer expires and a radio link between the UE and the source base station is active, the RLC entity for the target base station is released at the UE, the suspended SRB for the source base station is resumed at the UE, and a DAPS handover failure report is transmitted to the source base station at the UE, and

wherein in case that the first timer expires and the radio link between the UE and the source base station is not active, a radio resource control (RRC) re-establishment procedure is performed at the UE.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 1, 2022
From: KIM, DONGGUN; KIM, SOENGHUN
To: SAMSUNG ELECTRONICS CO., LTD.
Reel/Frame 059474/0561 →
Priority Claims (2)
KR 10-2019-0122659 · Oct 2, 2019 · national
KR 10-2019-0138766 · Nov 1, 2019 · national
Continuity (1)
Related Publication 20220369171A1 · Nov 17, 2022
References Cited (24)
US 7272120B2 · Rajkotia · 2007 [cited by applicant]
US 11943670B2 · Kim · 2024 [cited by examiner]
US 20090017826A1 · Shaheen · 2009 [cited by applicant]
US 20190297537A1 · Tsai et al. · 2019 [cited by applicant]
US 20200314714A1 · Jung · 2020 [cited by examiner]
US 20210105675A1 · Kim · 2021 [cited by examiner]
US 20210136829A1 · Kim · 2021 [cited by examiner]
US 20220159530A1 · Kim · 2022 [cited by examiner]
CN 1784873A · 2006 [cited by applicant]
Qualcomm Incorporated; Control Plane handling and procedures to support Make-Before-Break (MBB) HO; 3GPP TSG-RAN WG2 Meeting #105bis; R2-1903643; Revision of R2-1900358; XP051692907; Apr. 8-12, 2019; Xi'an, China. [cited by applicant]
Ericsson; Corrections to make before break mobility; 3GPP TSG-RAN WG2 Meeting #98; R2-1705485; XP051665855; May 15-19, 2017; Hangzhou, China. [cited by applicant]
Samsung; Physical Layer Aspects for Mobility Enhancements; 3GPP TSG RAN WG1 #96; R1-1902249; XP051599944; Feb. 25-Mar. 1, 2019; Athens, Greece. [cited by applicant]
CATT; Some Considerations on CP of DAPS-RUDI; 3GPP TSG RAN WG2 Meeting #107; R2-1908921; XP051766739; Aug. 26-30, 2019; Prague, Czech. [cited by applicant]
OPPO; Discussion on failure handling of handover; 3GPP TSG-RAN2 Meeting #103bis; R2-1813796; XP051523286; Oct. 8-12, 2018; Chengdu, China. [cited by applicant]
European Search Report dated Oct. 20, 2022; European Appln. No. 20872183.7-1216/4044670 PCT/KR2020013359. [cited by applicant]
Nokia et al.; 3GPP TSG RAN WG2 Meeting #107; R2-1909038; Aug. 26-30, 2019; Prague, Czech Republic. [cited by applicant]
Vivo; Discussion on the RLF and HOF for DAPS; 3GPP TSG-RAN WG2 Meeting #107; R2-1909775; revision of R2-1905975; Aug. 26-30, 2019; Prague, Czech Republic. [cited by applicant]
Huawei et al.; Considerations on RLM for DAPS; 3GPP TSG-RAN WG2 Meeting #107; R2-1910589; Aug. 26-30, 2019; Prague, Czech Republic. [cited by applicant]
OPPO; Discussion on RLM for LTE mobility enhancement; 3GPP TSG-RAN WG2 Meeting #107; R2-1909668; revision of R2-1905633; Aug. 26-30, 2019; Prague, Czech Republic. [cited by applicant]
International Search Report with Written Opinion and English translation dated Jan. 8, 2021; International AppIn No. PCT/KR2020/013359. [cited by applicant]
Samsung Electronics et al., Introduction of T312 in NR, R2-1911445, 3GPP TSG-RAN WG2 Meeting #107, Aug. 16, 2019, Prague, Czech Republic. [cited by applicant]
Chinese Office Action dated Mar. 7, 2024, Chinese Application No. 202080069905.8. [cited by applicant]
Japanese Office Action Sep. 10, 2024, in Japanese Application No. 2022-520830. [cited by applicant]
Japanese Office Action dated Feb. 4, 2025, issued in Japanese Application No. 2022-520830. [cited by applicant]
Cited By (1)
US 12,446,059