IP Library › Granted Patent US 12,262,373
Granted Patent B2
US 12,262,373 · App. 17/651,740 · Granted Mar 25, 2025

Techniques for inter-slot and intra-slot frequency hopping in full duplex

Inventors: Muhammad Sayed Khairy Abdelghaffar (San Jose, CA); Abdelrahman Mohamed Ahmed Mohamed Ibrahim (San Diego, CA); Ahmed Attia Abotabl (San Diego, CA); Gokul Sridharan (Sunnyvale, CA); Hung Dinh Ly (San Diego, CA); Hwan Joon Kwon (San Diego, CA); Ahmed Elshafie (San Diego, CA)
Assignee: QUALCOMM Incorporated
H04W72/1268H04L5/0012H04L5/14H04W72/02H04W72/0446
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,262,373
App. No.
17/651,740
Granted
Mar 25, 2025
Kind
B2
Abstract

Certain aspects of the present disclosure provide techniques for inter-slot and intra-slot frequency hopping in full duplex. A method performed by a user equipment (UE) includes receiving scheduling information from a network entity, wherein the scheduling information schedules transmission of a plurality of uplink data channel repetitions in a plurality of slots according to a frequency hopping scheme that configures frequency hops between transmissions of repetitions of the plurality of uplink data channel repetitions. The method also includes taking one or more actions related to transmitting, according to the frequency hopping scheme, the plurality of uplink data channel repetitions in the plurality of slots based on the scheduling information.

Claims (115)

1. A method of wireless communication by a user equipment (UE), comprising:

receiving scheduling information from a network entity, wherein:

the scheduling information schedules transmission of at least one uplink channel transmission in a full duplex (FD) slot according to a frequency hopping scheme that configures frequency hops between different portions of the at least one uplink channel transmission in the FD slot,

the FD slot includes an uplink subband and a downlink subband of a larger bandwidth part (BWP), and

the scheduling information indicates at least one starting resource block (RB) for the at least one uplink channel transmission and at least one RB offset, selected from a set of RB offsets, for the at least one uplink channel transmission, wherein the set of RB offsets from which the at least one RB offset is selected for the FD slot is different from another set of RB offsets for a non-FD slot; and

taking one or more actions related to transmitting, according to the frequency hopping scheme, the at least one uplink channel transmission in the FD slot based on the scheduling information.

2. The method of claim 1 , wherein:

the scheduling information schedules:

a first portion of the at least one uplink channel transmission in the FD slot,

a second portion of the at least one uplink channel transmission in the FD slot, and

a frequency hop between the first portion of the at least one uplink channel transmission and the second portion of the uplink channel transmission,

a first starting RB in the FD slot for the first portion comprises the starting RB indicated in the scheduling information for the FD slot, and

a second starting RB in the FD slot for the second portion is based on the at least one RB offset indicated in the scheduling information for the FD slot.

3. The method of claim 2 , wherein:

when the uplink subband of the FD slot comprises a number of RBs less than a threshold, the set of RB offsets from which the at least one RB offset is selected comprises greater than two RB offsets, and

when the uplink subband of the FD slot comprises a number of RBs greater than or equal to the threshold, the set of RB offsets from which the at least one RB offset is selected comprises greater than four RB offsets.

4. The method of claim 2 , wherein the second starting RB is further based on the at least one starting RB indicated in the scheduling information for the FD slot and a size of the uplink subband of the FD slot.

5. The method of claim 2 , further comprising determining that at least a part of the second portion of the at least one uplink channel transmission is scheduled to occur outside of the uplink subband of the FD slot.

6. The method of claim 5 , wherein, based on the determination that the part of the second portion of the at least one uplink channel transmission is scheduled to occur outside of the uplink subband of the FD slot, taking the one or more actions comprises dropping the first portion and the second portion of the at least one uplink channel transmission from being transmitted in the FD slot.

7. The method of claim 5 , wherein, based on the determination that the part of the second portion of the at least one uplink channel transmission is scheduled to occur outside of the uplink subband of the FD slot, taking the one or more actions compromise:

ignoring the frequency hop scheduled between the first portion of the at least one uplink channel transmission and the second portion of the at least one uplink channel transmission, and

transmitting the first portion of the at least one uplink channel transmission and the second portion of the at least one uplink channel transmission based on the at least one starting RB within the FD slot.

8. The method of claim 5 , further comprising:

receiving, from the network entity, an indication of a threshold number of RBs;

determining whether a number of RBs in the part of the second portion of the at least one uplink channel transmission scheduled to occur outside of the uplink subband of the FD slot is greater than the threshold number of RBs; and

one of:

when, based on the determination, the number of RBs in the part of the second portion scheduled to occur outside the uplink subband of the FD slot is greater than the threshold number of RBs, taking the one or more actions comprises dropping the first portion and the second portion from being transmitted in the FD slot, and

when, based on the determination, the number of RBs in the part of the second portion scheduled to occur outside the uplink subband of the FD slot is not greater than the threshold number of RBs, taking the one or more actions comprises:

puncturing the number of RBs scheduled to occur outside the uplink subband, and

transmitting at least a remaining number of RBs of the second portion of the at least one uplink channel transmission within the uplink subband of the FD slot based on the second starting RB.

9. The method of claim 5 , further comprising applying an offset to the second starting RB for the second portion of the at least one uplink channel transmission such that the second portion of the at least one uplink channel transmission is fully contained in the uplink subband of the FD slot, wherein taking the one or more actions comprises:

transmitting the first portion of the at least one uplink channel transmission in the FD slot based on the first starting RB, and

transmitting the second portion of the at least one uplink channel transmission in the FD slot based the second starting RB and the applied offset.

10. The method of claim 5 , further comprising determining the second starting RB based on a first RB of the uplink subband of the FD slot and the at least one RB offset indicated in the scheduling information for the FD slot, wherein taking the one or more actions comprises:

transmitting the first portion of the at least one uplink channel transmission in the FD slot based on the first starting RB, and

transmitting the second portion of the at least one uplink channel transmission in the FD slot based on the second starting RB.

11. The method of claim 1 , wherein:

the at least one RB offset is indicated via a dedicated bitfield in the scheduling information, or

the at least one RB offset is indicated via a dedicated bitfield in the scheduling information and additional bits determined based on a size of the uplink subband of the FD slot.

12. A method of wireless communication by a user equipment (UE), comprising:

receiving scheduling information from a network entity, wherein:

the scheduling information schedules transmission of a plurality of uplink data channel repetitions in a plurality of slots according to a frequency hopping scheme that configures frequency hops between transmissions of repetitions of the plurality of uplink data channel repetitions,

the plurality of slots comprise at least a full duplex (FD) slot including an uplink subband and a downlink subband of a larger bandwidth part (BWP), and

the scheduling information indicates:

at least one starting resource block (RB) for the plurality of uplink data channel repetitions,

at least one RB offset, selected from a set of RB offsets, for the plurality of uplink data channel repetitions, wherein the set of RB offsets from which the at least one RB offset is selected for the FD slot is different from another set of RB offsets for a non-FD slot, and

a number of repetitions in the plurality of uplink data channel repetitions; and

taking one or more actions related to transmitting, according to the frequency hopping scheme, the plurality of uplink data channel repetitions in the plurality of slots based on the scheduling information.

13. The method of claim 12 , wherein:

the scheduling information schedules repetitions of the plurality of uplink data channel repetitions in different slots of the plurality of slots, including a first repetition in a non-FD slot and a second repetition in the FD slot,

the first repetition in the non-FD slot is associated with the least one starting RB indicated in the scheduling information, and

the second repetition in the FD slot is associated with a second starting RB.

14. The method of claim 13 , further comprising:

dividing the BWP of the FD slot into a plurality of frequency segments, each frequency segment of a size equal to or approximately equal to an RB allocation of the second repetition; and

selecting a frequency segment of the plurality of frequency segments corresponding to the uplink subband of the FD slot based on at least one of a slot number associated with the FD slot or a radio temporary network identifier (RNTI), wherein:

the second starting RB associated with the second repetition is selected to be in the selected frequency segment, and

taking the one or more actions comprises:

transmitting the first repetition in the non-FD slot based on the first starting RB, and

transmitting the second repetition in the FD slot based on the second starting RB.

15. The method of claim 13 , further comprising determining the second starting RB in the FD slot for the second repetition based on:

the at least one starting RB indicated in the scheduling information, or

the at least one starting RB indicated in the scheduling information and the at least one RB offset indicated in the scheduling information.

16. The method of claim 15 , wherein:

whether the second starting RB is determined based on the at least one starting RB or the at least one starting RB and the at least one RB offset depends on whether the FD slot is an odd slot or an even slot,

when the FD slot comprises an even slot, the second starting RB in the FD slot associated with the second repetition comprises the at least one starting RB indicated in the scheduling information, and

when the FD slot comprises an odd slot, the second starting RB in the FD slot associated with the second repetition is based on the at least one starting RB indicated in the scheduling information and the at least one RB offset indicated in the scheduling information.

17. The method of claim 16 , further comprising determining a set of frequencies over which the second repetition is to be transmitted in the FD slot based, at least, on the second starting RB.

18. The method of claim 17 , wherein taking the one or more actions comprises dropping transmission of the second repetition in the FD slot when the set of frequencies over which the second repetition is to be transmitted in the FD slot are not contained within the uplink subband of the FD slot.

19. The method of claim 17 , wherein, when the set of frequencies over which the first repetition is to be transmitted in the FD slot are not contained within the uplink subband of the FD slot:

the FD slot is not considered as an available slot for transmission of the second repetition by the UE, and

based on the FD slot being considered as not available, taking the one or more actions comprises transmitting the second repetition in a subsequent available slot.

20. The method of claim 15 , wherein:

determining the second starting RB in the FD slot associated with the second repetition is based further on a reference RB, and

taking the one or more actions comprises transmitting the second repetition in the FD slot based on the reference RB.

21. The method of claim 20 , further comprising receiving an indication of the reference RB from the network entity.

22. The method of claim 20 , wherein the reference RB is non-zero for the FD slot and zero for the non-FD slot.

23. The method of claim 15 , wherein:

determining the second starting RB in the FD slot associated with the second repetition is based further on a size of the uplink subband of the FD slot, and

taking the one or more actions comprises transmitting the second repetition in the second FD slot based on the second starting RB.

24. An apparatus, comprising:

a memory comprising executable instructions; and

a processor configured to execute the executable instructions and cause the apparatus to:

receive scheduling information from a network entity, wherein:

the scheduling information schedules transmission of at least one uplink channel transmission in a full duplex (FD) slot according to a frequency hopping scheme that configures frequency hops between different portions of the at least one uplink channel transmission in the FD slot,

the FD slot includes an uplink subband and a downlink subband of a larger bandwidth part (BWP), and

the scheduling information indicates at least one starting resource block (RB) for the at least one uplink channel transmission and at least one RB offset, selected from a set of RB offsets, for the at least one uplink channel transmission, wherein the set of RB offsets from which the at least one RB offset is selected for the FD slot is different from another set of RB offsets for a non-FD slot; and

take one or more actions related to transmitting, according to the frequency hopping scheme, the at least one uplink channel transmission in the FD slot based on the scheduling information.

25. The apparatus of claim 24 , wherein:

the scheduling information schedules:

a first portion of the at least one uplink channel transmission in the FD slot,

a second portion of the at least one uplink channel transmission in the FD slot, and

a frequency hop between the first portion of the at least one uplink channel transmission and the second portion of the uplink channel transmission,

a first starting RB in the FD slot for the first portion comprises the starting RB indicated in the scheduling information for the FD slot, and

a second starting RB in the FD slot for the second portion is based on the at least one RB offset indicated in the scheduling information for the FD slot.

26. The apparatus of claim 25 , wherein:

when the uplink subband of the FD slot comprises a number of RBs less than a threshold, the set of RB offsets from which the at least one RB offset is selected comprises greater than two RB offsets, and

when the uplink subband of the FD slot comprises a number of RBs greater than or equal to the threshold, the set of RB offsets from which the at least one RB offset is selected comprises greater than four RB offsets.

27. An apparatus, comprising:

a memory comprising executable instructions; and

a processor configured to execute the executable instructions and cause the apparatus to:

receive scheduling information from a network entity, wherein:

the scheduling information schedules transmission of a plurality of uplink data channel repetitions in a plurality of slots according to a frequency hopping scheme that configures frequency hops between transmissions of repetitions of the plurality of uplink data channel repetitions,

the plurality of slots comprise at least a full duplex (FD) slot including an uplink subband and a downlink subband of a larger bandwidth part (BWP), and

the scheduling information indicates:

at least one starting resource block (RB) for the plurality of uplink data channel repetitions,

at least one RB offset, selected from a set of RB offsets, for the plurality of uplink data channel repetitions, wherein the set of RB offsets from which the at least one RB offset is selected for the FD slot is different from another set of RB offsets for a non-FD slot, and

a number of repetitions in the plurality of uplink data channel repetitions; and

take one or more actions related to transmitting, according to the frequency hopping scheme, the plurality of uplink data channel repetitions in the plurality of slots based on the scheduling information.

28. The apparatus of claim 27 , wherein:

the scheduling information schedules repetitions of the plurality of uplink data channel repetitions in different slots of the plurality of slots, including a first repetition in a non-FD slot and a second repetition in the FD slot,

the first repetition in the non-FD slot is associated with the least one starting RB indicated in the scheduling information, and

the second repetition in the FD slot is associated with a second starting RB.

29. The apparatus of claim 28 , wherein the processor is further configured to cause the apparatus to determine the second starting RB in the FD slot for the second repetition based on:

the at least one starting RB indicated in the scheduling information, or

the at least one starting RB indicated in the scheduling information and the at least one RB offset indicated in the scheduling information.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 8, 2022
From: ABDELGHAFFAR, MUHAMMAD SAYED KHAIRY; IBRAHIM, ABDELRAHMAN MOHAMED AHMED MOHAMED; ABOTABL, AHMED ATTIA; SRIDHARAN, GOKUL; LY, HUNG DINH; KWON, HWAN JOON; ELSHAFIE, AHMED
To: QUALCOMM INCORPORATED
Reel/Frame 059201/0225 →
Continuity (1)
Related Publication 20230284210A1 · Sep 7, 2023
References Cited (26)
US 11696269B2 · Kwak · 2023 [cited by examiner]
US 11882080B2 · Ly · 2024 [cited by examiner]
US 20150011233A1 · Kazmi · 2015 [cited by examiner]
US 20190089502A1 · Yi · 2019 [cited by examiner]
US 20190357149A1 · Zhang · 2019 [cited by examiner]
US 20210320779A1 · Huang et al. · 2021 [cited by applicant]
US 20210360676A1 · Fakoorian et al. · 2021 [cited by applicant]
US 20220014954A1 · Ibrahim et al. · 2022 [cited by applicant]
US 20220322345A1 · Kwak · 2022 [cited by examiner]
US 20220393716A1 · Park · 2022 [cited by examiner]
US 20230057948A1 · Ly · 2023 [cited by examiner]
US 20230239122A1 · Xiong · 2023 [cited by examiner]
US 20230275717A1 · Yao · 2023 [cited by examiner]
US 20230283418A1 · Abdelghaffar · 2023 [cited by examiner]
US 20230284210A1 · Abdelghaffar · 2023 [cited by examiner]
US 20230292294A1 · Rudolf · 2023 [cited by examiner]
US 20240137972A1 · Abdelghaffar · 2024 [cited by examiner]
US 20240172199A1 · Jung · 2024 [cited by examiner]
US 20240195545A1 · Shim · 2024 [cited by examiner]
US 20240237055A9 · Abdelghaffar · 2024 [cited by examiner]
CN 118140425A · 2024 [cited by examiner]
WO WO2022185281A1 · 2022 [cited by examiner]
WO WO2023168161A1 · 2023 [cited by examiner]
WO WO2024010586A1 · 2024 [cited by examiner]
WO WO2024035016A1 · 2024 [cited by examiner]
International Preliminary Report on Patentability—PCT/US2023/061174—The International Bureau of WIPO—Geneva, Switzerland—May 15, 2023. [cited by applicant]