IP Library › Granted Patent US 12,271,853
Granted Patent B2
US 12,271,853 · App. 17/765,727 · Granted Apr 8, 2025

Methods and apparatus to monitor and manage loading dock operations

Inventors: Kenneth C. Bowman (Cedarburg, WI); James C. Boerger (Franksville, WI); Chad Dillavou (Cedarburg, WI); Richard Mews (Bonduel, WI); Timothy Kubly (Ixonia, WI)
Assignee: Rite-Hite Holding Corporation
G06Q10/0639G06Q10/06316G06Q10/08
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,271,853
App. No.
17/765,727
Granted
Apr 8, 2025
Kind
B2
Abstract

Methods and apparatus to monitor and manage loading dock operations are disclosed. An example apparatus includes a sensor feedback analyzer to analyze feedback from sensors associated with a dock at a material handling facility to determine durations for completion of tasks in a sequence of operations associated with loading or unloading of a trailer at the dock based on the feedback. The apparatus also includes an efficiency analyzer to compare the durations to target thresholds associated with the tasks. The apparatus further includes a user interface generator to generate a user interface indicating at least one of the durations or the target thresholds.

Claims (55)

1. An apparatus comprising:

memory;

interface circuitry to obtain feedback from (i) a trailer sensor that is to detect a presence of a trailer at a dock at a material handling facility, (ii) a vehicle restraint that is to secure the trailer at the dock, (iii) a door sensor that is to monitor a state of a door at the dock, and (iv) a dock leveler that is to span a gap between the trailer and a platform of the dock;

machine-readable instructions; and

at least one processor circuit to be programmed by the machine-readable instructions to:

analyze the feedback to determine durations for completion of tasks in a sequence of operations associated with at least one of loading or unloading of the trailer at the dock, the tasks in the sequence of operations including (i) positioning the trailer at the dock, (ii) activating the vehicle restraint to secure the trailer at the dock, (iii) opening the door, and (iv) activating the dock leveler to span the gap between the trailer and the platform of the dock;

compare the durations to target thresholds associated with the tasks; and

generate a user interface indicating at least one of the durations, the target thresholds, or differences between the durations and the target thresholds.

2. The apparatus of claim 1 , wherein one or more of the at least one processor circuit is to generate a timeline indicating when successive ones of the tasks were completed relative to previous ones of the tasks.

3. The apparatus of claim 2 , wherein the at least one of the loading or unloading of the trailer includes an arrival phase, a material handling phase, and a departure phase, the timeline extends in a first direction during the arrival phase, a second direction during the material handling phase, and a third direction during the departure phase, the first direction is different than the second direction, and the second direction is different than the third direction.

4. The apparatus of claim 2 , wherein the timeline is a first timeline, and one or more of the at least one processor circuit is to generate a second timeline based on the target thresholds for the tasks.

5. The apparatus of claim 1 , wherein the memory is to store the durations for the completion of the tasks, and one or more of the at least one processor circuit is to update the target thresholds based on the stored durations.

6. The apparatus of claim 1 , wherein one or more of the at least one processor circuit is to:

determine utilization metrics for different docks at the material handling facility; and

assign a new trailer to one of the different docks based on the utilization metrics.

7. The apparatus of claim 6 , wherein one or more of the at least one processor circuit is to generate a utilization heat map for the different docks based on the utilization metrics.

8. The apparatus of claim 1 , wherein one or more of the at least one processor circuit is to generate a timing indicator to provide an indication of time relative to a first one of the target thresholds while a first one of the tasks is being completed.

9. The apparatus of claim 8 , wherein the timing indicator counts up to indicate an amount of elapsed time since at least one of a beginning of the first task or the completion of a task previous to the first task.

10. The apparatus of claim 8 , wherein the timing indicator counts down from a time corresponding to the first target threshold to indicate an amount of time remaining to complete the first task within the first target threshold.

11. A non-transitory computer readable medium comprising instructions to cause at least one processor circuit to at least:

access feedback from (i) a dock leveler that is to span a gap between a trailer at a dock of a material handling facility and a platform of the dock, (ii) a door sensor that is to monitor a status of a door at the dock, (iii) a vehicle restraint that is to secure the trailer at the dock, and (iv) a trailer sensor that is to detect a presence of the trailer at the dock;

analyze the feedback to determine durations of tasks in a sequence of operations associated with at least one of loading or unloading of the trailer at the dock, the tasks in the sequence of operations including (i) moving the dock leveler to a stored position spaced apart from the trailer, (ii) closing the door, (iii) de-activating the vehicle restraint to release the trailer, and (iv) moving the trailer away from the dock;

compare the durations to target thresholds associated with the tasks; and

generate a user interface indicating at least one of the durations, the target thresholds, or differences between the durations and the target thresholds.

12. The non-transitory computer readable medium of claim 11 , wherein the instructions are to cause one or more of the at least one processor circuit to generate a timeline indicating when successive ones of the tasks were completed relative to previous ones of the tasks.

13. The non-transitory computer readable medium of claim 12 , wherein the at least one of the loading or unloading of the trailer includes an arrival phase, a material handling phase, and a departure phase, the timeline extends in a first direction during the arrival phase, a second direction during the material handling phase, and a third direction during the departure phase, the first direction is different than the second direction, and the second direction is different than the third direction.

14. The non-transitory computer readable medium of claim 12 , wherein the timeline is a first timeline, and the instructions are to cause one or more of the at least one processor circuit to generate a second timeline based on the target thresholds for the tasks.

15. The non-transitory computer readable medium of claim 11 , wherein the instructions are to cause one or more of the at least one processor circuit to:

cause storage of the durations of the tasks; and

update the target thresholds based on the stored durations.

16. The non-transitory computer readable medium of claim 11 , wherein the instructions are to cause one or more of the at least one processor circuit to:

determine utilization metrics for different docks at the material handling facility; and

assign a new trailer to one of the different docks based on the utilization metrics.

17. The non-transitory computer readable medium of claim 16 , wherein the instructions are to cause one or more of the at least one processor circuit to generate a utilization heat map for the different docks based on the utilization metrics.

18. The non-transitory computer readable medium of claim 11 , wherein the instructions are to cause one or more of the at least one processor circuit to generate a timing indicator to provide an indication of time relative to a first one of the target thresholds while a first one of the tasks is being completed.

19. The non-transitory computer readable medium of claim 18 , wherein the timing indicator counts up to indicate an amount of elapsed time since at least one of a beginning of the first task or the completion of a task previous to the first task.

20. The non-transitory computer readable medium of claim 18 , wherein the timing indicator counts down from a time corresponding to the first target threshold to indicate an amount of time remaining to complete the first task within the first target threshold.

21. A method comprising:

obtaining feedback from (i) a trailer sensor that is to detect a presence of a trailer at a dock at a material handling facility, (ii) a vehicle restraint that is to secure the trailer at the dock, (iii) a door sensor that is to monitor a status of a door at the dock, and (iv) a dock leveler that is to span a gap between the trailer and a platform of the dock;

analyzing the feedback to determine durations for completion of tasks in a sequence of operations associated with at least one of loading or unloading of the trailer at the dock, the tasks in the sequence of operations including (i) positioning the trailer at the dock, (ii) activating the vehicle restraint to secure the trailer at the dock, (iii) opening the door, and (iv) activating the dock leveler to span the gap between the trailer and the platform of the dock;

comparing the durations to target thresholds associated with the tasks; and

generating, by executing instructions with at least one processor circuit, a user interface indicating at least one of the durations, the target thresholds, or differences between the durations and the target thresholds.

22. The method of claim 21 , further including generating a timeline indicating when successive ones of the tasks were completed relative to previous ones of the tasks.

23. The method of claim 22 , wherein the at least one of the loading or unloading of the trailer includes an arrival phase, a material handling phase, and a departure phase, the timeline extends in a first direction during the arrival phase, a second direction during the material handling phase, and a third direction during the departure phase, the first direction is different than the second direction, and the second direction is different than the third direction.

24. The method of claim 22 , wherein the timeline is a first timeline, the method further including generating a second timeline based on the target thresholds for the tasks.

25. The method of claim 21 , further including:

storing the durations for the completion of the tasks; and

updating the target thresholds based on the stored durations.

26. The method of claim 21 , further including:

determining utilization metrics for different docks at the material handling facility; and

assigning a new trailer to one of the different docks based on the utilization metrics.

27. The method of claim 26 , further including generating a utilization heat map for the different docks based on the utilization metrics.

28. The method of claim 21 , further including generating a timing indicator to provide an indication of time relative to a first one of the target thresholds while a first one of the tasks is being completed.

29. The method of claim 28 , wherein the timing indicator counts up to indicate an amount of elapsed time since at least one of a beginning of the first task or the completion of a task previous to the first task.

30. The method of claim 28 , wherein the timing indicator counts down from a time corresponding to the first target threshold to indicate an amount of time remaining to complete the first task within the first target threshold.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 21, 2023
From: BOWMAN, KENNETH C; BOERGER, JAMES C; DILLAVOU, CHAD; MEWS, RICHARD; KUBLY, TIMOTHY
To: RITE-HITE HOLDING CORPORATION
Reel/Frame 062445/0633 →
Continuity (2)
Provisional Application 62911855 · Oct 7, 2019
Related Publication 20220405695A1 · Dec 22, 2022
References Cited (27)
US 20130312205A1 · Riviere et al. · 2013 [cited by applicant]
US 20150019277A1 · Kostival et al. · 2015 [cited by applicant]
US 20170186124A1 · Jones et al. · 2017 [cited by applicant]
US 20200167734A1 · Hoofard · 2020 [cited by examiner]
US 20210082220A1 · Boerger et al. · 2021 [cited by applicant]
BR 102013018502A2 · 2016 [cited by applicant]
CN 107451720A · 2017 [cited by applicant]
CN 106651049B · 2020 [cited by examiner]
CN 110516976B · 2022 [cited by examiner]
JP S51087885U · 1976 [cited by applicant]
JP H10297716A · 1998 [cited by applicant]
JP H11029209A · 1999 [cited by applicant]
JP 2002149771A · 2002 [cited by applicant]
JP 2009166938A · 2009 [cited by applicant]
JP 6539395B1 · 2019 [cited by applicant]
JP 2021517099A · 2021 [cited by applicant]
KR 20090110611A · 2009 [cited by applicant]
WO 2017062638 · 2017 [cited by applicant]
WO WO2017062638A1 · 2017 [cited by examiner]
WO 2019173811 · 2019 [cited by applicant]
International Searching Authority, “International Search Report and Written Opinion” issued in connection with PCT application No. PCT/US2020/052505, issued on Dec. 16, 2020, 11 pages. [cited by applicant]
Intellectual Property Office of Vietnam, “Result of Substantive Examination,” issued in connection with Vietnamese Patent Application No. 1-2022-02617, dated Aug. 30, 2024, 4 pages. [English translation included]. [cited by applicant]
Japan Patent Office, “Search Report by Registered Search Organization,” issued in connection with Japanese Patent Application No. 2022-520546, dated Oct. 28, 2024, 43 pages. [English translation included]. [cited by applicant]
International Searching Authority, “International Preliminary Report on Patentability,” issued in connection with PCT Patent Application No. PCT/US20/52505, issued on Apr. 21, 2022, 6 pages. [cited by applicant]
Japanese Patent Office, “Notice of Reasons for Refusal,” issued in connection with Japanese Patent Application No. 2022-520546, dated Dec. 3, 2024, 8 pages. (English translation included). [cited by applicant]
Intellectual Property Office of Singapore, “Search Report” issued in connection with Singaporean Patent Application No. 11202203378S, dated Dec. 31, 2024, 3 pages. [cited by applicant]
Intellectual Property Office of Singapore, “Written Opinion” issued in connection with Singaporean Patent Application No. 11202203378S, dated Dec. 31, 2024, 8 pages. [cited by applicant]