IP Library › Granted Patent US 12,276,165
Granted Patent B2
US 12,276,165 · App. 18/326,090 · Granted Apr 15, 2025

Lost circulation eutectoid alloy downhole deployment tool

Inventors: Graham Richard Hitchcock (Aberdeenshire, GB); Arthur Hale (Angleton, TX)
Assignee: SAUDI ARABIAN OIL COMPANY
E21B21/003E21B33/138E21B36/00E21B36/04E21B10/42
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,276,165
App. No.
18/326,090
Granted
Apr 15, 2025
Kind
B2
Abstract

A method repairing lost circulation conditions during drilling operations, including deploying a deployment tool to a lost circulation zone, charging the deployment tool with eutectic metal alloy pellets, activating a heater to melt the pellets through the deployment tool and out of the crucible onto the targeted zone to form a patch, removing the deployment tool, and milling away excess cooled and cured eutectic metal alloy.

Claims (31)

1. An apparatus for repairing lost circulation conditions during drilling operations, comprising:

a deployment tool, comprising:

a pellet form of eutectic metal alloy;

an alloy charge area proximate an upper end of the deployment tool;

an alloy melt area proximate a lower end of the deployment tool;

one or more embedded heating elements; and

a drill string mounted crucible located in the alloy melt area, comprising:

a plurality of crucible jet ports; and

a plurality of cutting blades.

2. The apparatus of claim 1 , further comprising a charge ball made of foam to guide the eutectic pellets to the crucible.

3. The apparatus of claim 1 , wherein the one or more heating elements may be a mineral insulated heater.

4. The apparatus of claim 1 , wherein the cutting blades are adhered to the crucible either mechanically using a fastener or chemically using a polymeric binding agent.

5. The apparatus of claim 4 , wherein the cutting blades are constructed of an insert-type cutting element including tungsten carbide, ceramic, tool steel, polycrystalline diamond compact, or combinations thereof.

6. The apparatus of claim 1 , wherein the crucible is constructed of a phenolic or epoxy based composite resin.

7. A method for repairing lost circulation conditions during drilling operations comprising:

deploying a deployment tool attached to a drill string to a lost circulation zone;

charging an alloy charge area with a plurality of eutectic pellets;

activating a deployment tool heater while continuously rotating the drill string and pumping a drilling fluid;

melting the eutectic pellets in the deployment tool attached to the drill string to flow melted eutectic metal alloy through a plurality of crucible jet ports to a targeted location in the lost circulation zone;

removing the deployment tool while simultaneously monitoring drill string torque; and

milling excess material from a plurality of eutectic patches formed from cured eutectic metal alloy.

8. The method of claim 7 , further comprising pre-charging the eutectic pellets in the alloy charge area prior to running the deployment tool attached to the drill string to the loss zone.

9. The method of claim 7 , wherein charging the alloy charge area with the plurality of eutectic pellets further comprises deploying eutectic pellets from an above ground surface once the deployment tool and the drill string are deployed to the lost circulation zone.

10. The method of claim 7 , wherein charging the alloy charge area with the plurality of eutectic pellets further comprises using a charge ball to assist in transporting the eutectic pellets through the deployment tool and a drill pipe of the drill string by placing a downward pressure on the pellets.

11. The method of claim 7 , wherein the targeted location is a location with a fracture contributing to lost circulation conditions.

12. The method of claim 7 , further comprising determining if the deployment tool should be redeployed into the lost circulation zone, wherein the determining comprises:

circulating a drilling mud in a well comprising the lost circulation zone;

monitoring a flow rate of the drilling mud through a first mud line running from a mud pump to the well comprising the lost circulation zone; and

monitoring a flow rate of a fluid return line from the well.

13. The method of claim 12 , wherein, when the flow rate of the drilling mud through the first mud line is greater than the flow rate of the fluid return line, the deployment tool is redeployed into the lost circulation zone.

14. The method of claim 12 , wherein, when the flow rate of the drilling mud through the first mud line is less than or equal to the flow rate of the fluid return line, the deployment tool is removed from the well.

Assignments (5)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 8, 2024
From: ARAMCO SERVICES COMPANY
To: SAUDI ARAMCO UPSTREAM TECHNOLOGIES COMPANY
Reel/Frame 068220/0350 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 8, 2024
From: SAUDI ARAMCO UPSTREAM TECHNOLOGIES COMPANY
To: SAUDI ARABIAN OIL COMPANY
Reel/Frame 068220/0391 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jun 27, 2024
From: ARAMCO OVERSEAS COMPANY UK LTD
To: SAUDI ARABIAN OIL COMPANY
Reel/Frame 067956/0974 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 6, 2024
From: HALE, ARTHUR
To: ARAMCO SERVICES COMPANY
Reel/Frame 066668/0793 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 6, 2024
From: HITCHCOCK, GRAHAM RICHARD
To: ARAMCO OVERSEAS COMPANY UK LTD
Reel/Frame 066668/0871 →
Continuity (1)
Related Publication 20240401421A1 · Dec 5, 2024
References Cited (16)
US 4438813A · Nikolaev · 1984 [cited by examiner]
US 5295541A · Ng · 1994 [cited by examiner]
US 6523610B1 · Griffith · 2003 [cited by examiner]
US 10597970B2 · Pipchuk et al. · 2020 [cited by applicant]
US 11536111B2 · Carragher et al. · 2022 [cited by applicant]
US 12037870B1 · Hale · 2024 [cited by examiner]
US 20020158064A1 · Spencer · 2002 [cited by examiner]
US 20050109511A1 · Spencer · 2005 [cited by examiner]
US 20060144591A1 · Gonzalez · 2006 [cited by examiner]
US 20080047708A1 · Spencer · 2008 [cited by examiner]
US 20130087335A1 · Carragher · 2013 [cited by examiner]
US 20170145783A1 · Davis · 2017 [cited by examiner]
US 20170247971A1 · Rivas Diaz · 2017 [cited by examiner]
US 20200332620A1 · Carragher · 2020 [cited by examiner]
US 20210301605A1 · Li · 2021 [cited by examiner]
SLB Energy Glossary entry for “lost circulation”, accessed Sep. 11, 2024 via https://glossary.slb.com/en/terms/l/lost_circulation. [cited by examiner]