IP Library Granted Patent US 12,276,196
Granted Patent B2
US 12,276,196 · App. 18/006,561 · Granted Apr 15, 2025

Three-level prevention and control method for rock burst roadway

Inventors: Yongzheng Wu (Beijing, CN); Yukai Fu (Beijing, CN); Xiaowei Chu (Beijing, CN); Jinyu Chen (Beijing, CN); Jie He (Beijing, CN); Xinhua Liu (Beijing, CN); Xianzhi Meng (Beijing, CN)
Assignee: CCTEG COAL MINING RESEARCH INSTITUTE
E21D9/001
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,276,196
App. No.
18/006,561
Granted
Apr 15, 2025
Kind
B2
Abstract

A three-level prevention and control method for a rock burst roadway, the method comprising: pre-weakening a thick and hard rock layer above a roadway before the roadway is excavated; carrying out prestress support, pressure relief and reinforcement when the roadway is excavated; and carrying out stress transfer on an advance abutment pressure, and arranging a composite energy absorption protective structure around the roadway before the mining of a working face. By coordinating the spatio-temporal relationship between pressure relief, support and prevention, the energy dissipation in the rock burst roadway is changed from an unstable, disorderly and uncontrollable dissipation state to a stable, orderly and controllable dissipation state.

Claims (9)

1. A three-level prevention and control method for roadway rock burst, comprising:

before digging a roadway, pre-weakening a thick and hard rock stratum above the roadway using a regional staged hydraulic fracturing technology of long borehole;

during digging the roadway, performing a pre-stress support, a pressure relief, and a reinforcement; and

before stoping at working-face, transferring a stress of an advanced abutment pressure using a local hydraulic fracturing technology of medium and short borehole, and arranging a composite energy-absorbing protective structure around the roadway.

2. The three-level prevention and control method for roadway rock burst according to claim 1 , wherein during digging the roadway, the pre-stress support is performed by using a bolt rod and/or a bolt cable, the pressure relief is performed by casing drilling and the reinforcement is performed by grouting.

3. The three-level prevention and control method for roadway rock burst according to claim 1 , wherein the arranging the composite energy-absorbing protective structure around the roadway comprises: arranging a protective support in the roadway and filling a buffer energy-absorbing cushion between the protective support and a surrounding rock of the roadway.

4. The three-level prevention and control method for roadway rock burst according to claim 3 , further comprising: providing an anti-impact energy-absorbing material on a top beam of the protective support.

5. The three-level prevention and control method for roadway rock burst according to claim 3 , further comprising: arranging a hinged triangular anti-impact device on a top beam of the protective support, and on a bottom beam of the protective support, respectively.

6. The three-level prevention and control method for roadway rock burst according to claim 3 , wherein the protective support is a frame structure formed of splayed columns.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Jan 24, 2023
From: WU, YONGZHENG; FU, YUKAI; CHU, XIAOWEI; CHEN, JINYU; HE, JIE; LIU, XINHUA; MENG, XIANZHI
To: CCTEG COAL MINING RESEARCH INSTITUTE
Reel/Frame 062464/0893 →
Priority Claims (1)
CN 202011354530.8 · Nov 26, 2020 · national
Continuity (1)
Related Publication 20230296021A1 · Sep 21, 2023
References Cited (24)
US 20190316454A1 · Huang · 2019 [cited by examiner]
CN 102182482 · 2011 [cited by examiner]
CN 102182482A · 2011 [cited by applicant]
CN 103278055A · 2013 [cited by applicant]
CN 103557020A · 2014 [cited by applicant]
CN 103758570A · 2014 [cited by applicant]
CN 104005765A · 2014 [cited by applicant]
CN 104790985A · 2015 [cited by applicant]
CN 107083961 · 2017 [cited by examiner]
CN 107083961A · 2017 [cited by applicant]
CN 109611130A · 2019 [cited by applicant]
CN 110318761A · 2019 [cited by applicant]
CN 111305876A · 2020 [cited by applicant]
CN 111322048A · 2020 [cited by applicant]
CN 111720139A · 2020 [cited by applicant]
CN 111734463A · 2020 [cited by applicant]
CN 111911201A · 2020 [cited by applicant]
CN 112431596A · 2021 [cited by applicant]
SU 1186798A1 · 1985 [cited by applicant]
SU 1221373A1 · 1986 [cited by applicant]
First Chinese Office Action issued May 28, 2021 in connection with Chinese Patent Application No. 2020113545308. [cited by applicant]
Second Chinese Office Action issued May 15, 2021 in connection with Chinese Patent Application No. 2020113545308. [cited by applicant]
International Search Report issued Aug. 2, 2021 in connection with PCT International Application No. PCT/CN2021/087397. [cited by applicant]
Written Opinion of the International Searching Authority issued Aug. 2, 2021 in connection with PCT International Application No. PCT/CN2021/087397. [cited by applicant]