IP Library › Granted Patent US 12,280,860
Granted Patent B2
US 12,280,860 · App. 17/555,749 · Granted Apr 22, 2025

Subsea robot and method for detecting norm breakdown in a production system

Inventors: Mario Germino Ferreira Da Silva (Rio de Janeiro, BR); Antonio Jose Perez Rodrigues De Britto (Teresopolis, BR); Francisca Ferreira Do Rosario (Rio de Janeiro, BR); Bruno Barbosa Castro (Rio de Janeiro, BR); Rosane Alves Fontes (Rio de Janeiro, BR)
Assignee: PETROLEO BRASIL S.A.—PETROBRAS
B63G8/001B08B9/0326F16L55/24B63G2008/005
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,280,860
App. No.
17/555,749
Granted
Apr 22, 2025
Kind
B2
Abstract

In order to meet the objectives described above, the present invention provides a robot for detecting breakdown of NORM (Naturally Occurring Radioactive Materials) in a production system, in order to plan operations to remove scale containing radioactive material, and for decommissioning subsea system operations. The fields of application are the area of flow assurance and reservoir management, using operations to chemically remove scale containing NORM in the production system, and to improve the safety of the decommissioning processes of production systems. The invention allows the position of the scale inside the production system to be safely detected, such as, for example, the beginning of the deposit inside a production line, the extension of the deposit, and the end of the deposit, as well as whether the deposit occurred at different points along the production line.

Claims (21)

1. A Remotely Operated Vehicle (ROV) subsea robot for detecting a breakdown in production systems, the ROV subsea robot comprising:

a propulsion system ( 14 ),

at least one battery ( 15 ),

a set of cameras ( 16 ),

a body ( 17 ) that enables the insertion of various auxiliary components,

a remote connection ( 18 ),

a connection with the RCV vessel ( 19 ),

a Naturally Occurring Radioactive Material (NORM)-detection system ( 11 ), and

an ultrasound emission system ( 12 ),

wherein the NORM-detection system ( 11 ) comprises a sodium iodide Nal crystal scintillator detector, coated with magnesium oxide, with an aluminum housing, in which the array is duly encapsulated to be used at depths deeper than 1500 meters.

2. The ROV subsea robot of claim 1 , further comprising:

a set of wheels for movement ( 13 ) with the distances between axles and between wheels being variable and adapted to enable movement over the oil production lines ( 30 ).

3. The ROV subsea robot of claim 1 , further comprising:

an ultrasound emission system ( 12 ) in which the transducer has emissions in the range of 20 kHz to 100 kHz with capacity of at least 1 W/cm2, made of piezoelectric ceramics and being located on the lower part of the robot ( 10 ).

4. The ROV subsea robot of claim 2 , wherein the wheels for movement ( 13 ) are adjustable for diameters ranging from 4 inches to 12 inches.

5. A method for detecting breakdown in production systems according to the equipment of claim 1 , wherein the method comprises:

moving, by the ROV robot ( 10 ), over the production line ( 30 ),

mapping the locations of the scale using NORM sensors ( 11 ) at the same time the ROV robot ( 10 ) is moving;

pumping the removal product (chelating agent) to the target position on the section of the production line ( 30 ) where the scale is located;

moving the ROV robot ( 10 ) with the ultrasound ( 12 ) active, to the target position on the production line, in order to release the scale from inside the line; and

pumping the fluid is to move the chelating agent with the dissolved scale to the SPU or to the support vessel ( 20 ), thus cleaning the production line ( 30 ).

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Feb 11, 2025
From: ALVES FONTES, ROSANE
To: PETROLEO BRASILEIRO S.A. - PETROBRAS
Reel/Frame 070179/0377 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 2, 2022
From: FERREIRA DA SILVA, MARIO GERMINO; RODRIGUES DE BRITTO, ANTONIO JOSE PEREZ; FERREIRA DO ROSARIO, FRANCISCA; CASTRO, BRUNO BARBOSA
To: PETROLEO BRASILEIRO S.A. - PETROBRAS
Reel/Frame 059147/0484 →
Priority Claims (1)
BR 10 2020 026473 7 · Dec 22, 2020 · national
Continuity (1)
Related Publication 20220194535A1 · Jun 23, 2022
References Cited (4)
US 5686674A · Lowry · 1997 [cited by examiner]
US 11143599B2 · Morris · 2021 [cited by examiner]
US 20160320282A1 · Dingman · 2016 [cited by examiner]
WO WO2017184793A1 · 2017 [cited by examiner]