Method and apparatus for transmitting ACK/NACK

Inventors: Taegyun Noh (Daejeon, KR); Jae Young Ahn (Daejeon, KR)
Assignee: Electronics and Telecommunications Research Institute
H04L27/2607H04L1/1893H04L5/0048H04L5/0053H04L5/0055H04W74/085
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,284,065
App. No.
18/379,148
Granted
Apr 22, 2025
Kind
B2
Abstract

A technology enabling a terminal to receive acknowledgement (ACK)/negative ACK (NACK) information about data transmitted from the terminal is provided. The method includes receiving cyclic shift information for a reference signal from the base station; transmitting, to the base station, the data and a reference signal which is cyclic-shifted using a cyclic shift value, the cyclic shift value being determined based on a dynamic cyclic shift value mapped one-to-one to the cyclic shift information for the reference signal; and receiving, from the base station, the ACK/NACK information about the transmitted data through a radio resource of a downlink channel, the radio resource of the downlink channel being identified based on a modifier mapped one-to-one to the cyclic shift information for the reference signal.

Claims (131)

1. A communication method, comprising:

receiving, at a user equipment (UE), first information;

determining, at the UE, a first value based on the first information;

determining, at the UE, a second value based on the first information;

generating, at the UE, a reference signal by cyclically shifting a sequence based on the first value;

transmitting, at the UE, data;

transmitting, at the UE, the reference signal;

determining, at the UE, a Physical Hybrid ARQ Indicator Channel (PHICH) resource based on the second value; and

receiving, at the UE, Acknowledgement/Negative Acknowledgement (ACK/NACK) for the transmitted data using the PHICH resource,

wherein the first value and the second value are determined according to Table 1:

TABLE 1

first information

first value

second value

000

0

0

001

6

1

010

3

2

011

4

3

100

2

4

101

8

5

110

10

6

111

9

7.

2. The method of claim 1 , wherein determining the PHICH resource according to Table 1 prevents collision of the PHICH resource obtained based on a modulo-four operation.

3. The method of claim 2 , wherein determining the PHICH resource comprises a modulo-four operation.

4. The method of claim 1 , wherein the data is transmitted through a Physical Uplink Shared Channel (PUSCH).

5. The method of claim 1 , wherein the first information is received through a Physical Downlink Control Channel (PDCCH), and the first information comprises three bits.

6. The method of claim 1 , wherein cyclically shifting the sequence comprises a modulo-12 operation.

7. A user equipment (UE), comprising:

a circuitry which is configured to:

cause the UE to receive first information;

determine a first value based on the first information;

determine a second value based on the first information;

generate a reference signal by cyclically shifting a sequence based on the first value;

cause the UE to transmit data;

cause the UE to transmit the reference signal;

determine a Physical Hybrid ARQ Indicator Channel (PHICH) resource based on the second value; and

cause the UE to receive Acknowledgement/Negative Acknowledgement (ACK/NACK) for the transmitted data using the PHICH resource,

wherein the first value and the second value are determined according to Table 2:

TABLE 2

first information

first value

second value

000

0

0

001

6

1

010

3

2

011

4

3

100

2

4

101

8

5

110

10

6

111

9

7.

8. The UE of claim 7 , wherein determining the PHICH resource according to Table 2 prevents collision of the PHICH resource obtained based on a modulo-four operation.

9. The UE of claim 8 , wherein determining the PHICH resource comprises a modulo-four operation.

10. The UE of claim 7 , wherein the data is transmitted through a Physical Uplink Shared Channel (PUSCH).

11. The UE of claim 7 , wherein the first information is received through a Physical Downlink Control Channel (PDCCH), and the first information comprises three bits.

12. The UE of claim 7 , wherein cyclically shifting the sequence comprises a modulo-12 operation.

13. A communication device for a user equipment (UE), the communication device comprising:

a circuitry which is configured to:

cause the UE to receive first information;

determine a first value based on the first information;

determine a second value based on the first information;

generate a reference signal by cyclically shifting a sequence based on the first value;

cause the UE to transmit data;

cause the UE to transmit the reference signal;

determine a Physical Hybrid ARQ Indicator Channel (PHICH) resource based on the second value; and

cause the UE to receive Acknowledgement/Negative Acknowledgement (ACK/NACK) for the transmitted data using the PHICH resource,

wherein the first value and the second value are determined according to Table 3:

TABLE 3

first information

first value

second value

000

0

0

001

6

1

010

3

2

011

4

3

100

2

4

101

8

5

110

10

6

111

9

7.

14. The communication device of claim 13 , wherein determining the PHICH resource according to Table 3 prevents collision of the PHICH resource obtained based on a modulo-four operation.

15. The communication device of claim 14 , wherein determining the PHICH resource comprises a modulo-four operation.

16. The communication device of claim 13 , wherein the data is transmitted through a Physical Uplink Shared Channel (PUSCH).

17. The communication device of claim 13 , wherein the first information is received through a Physical Downlink Control Channel (PDCCH), and the first information comprises three bits.

18. The communication device of claim 13 , wherein cyclically shifting the sequence comprises a modulo-12 operation.

Priority Claims (4)
KR 10-2008-0081083 · Aug 19, 2008 · national
KR 10-2008-0094491 · Sep 26, 2008 · national
KR 10-2008-0101970 · Oct 17, 2008 · national
KR 10-2009-0047517 · May 29, 2009 · national
Continuity (8)
Continuation 17683376 · Mar 1, 2022
Continuation 16926858 · Jul 13, 2020
Continuation 16174346 · Oct 30, 2018
Continuation 15428578 · Feb 9, 2017
Continuation 13658282 · Oct 23, 2012
Continuation 12652210 · Jan 5, 2010
Continuation PCTKR2009004616 · Aug 19, 2009
Related Publication 20240039774A1 · Feb 1, 2024
References Cited (132)
US 7969943B2 · Miki et al. · 2011 [cited by applicant]
US 8204010B2 · Suzuki et al. · 2012 [cited by applicant]
US 8320337B2 · Noh · 2012 [cited by examiner]
US 8514783B2 · Lee · 2013 [cited by applicant]
US 8531962B2 · Chen et al. · 2013 [cited by applicant]
US 9001771B2 · Jongren · 2015 [cited by applicant]
US 9602260B2 · Noh · 2017 [cited by examiner]
US 10148477B2 · Noh · 2018 [cited by examiner]
US 10749722B2 · Noh · 2020 [cited by examiner]
US 11139925B2 · Karaki · 2021 [cited by examiner]
US 11296913B2 · Noh · 2022 [cited by examiner]
US 20070002726A1 · Zangi · 2007 [cited by applicant]
US 20070171995A1 · Muharemovic et al. · 2007 [cited by applicant]
US 20070183386A1 · Muharemovic et al. · 2007 [cited by applicant]
US 20080075184A1 · Muharemovic et al. · 2008 [cited by applicant]
US 20080298433A1 · Tirola et al. · 2008 [cited by applicant]
US 20080311942A1 · Kim et al. · 2008 [cited by applicant]
US 20090092148A1 · Zhang et al. · 2009 [cited by applicant]
US 20090196238A1 · Cheng et al. · 2009 [cited by applicant]
US 20090196240A1 · Frederiksen et al. · 2009 [cited by applicant]
US 20090232067A1 · Pajukoski · 2009 [cited by applicant]
US 20090245194A1 · Damjanovic et al. · 2009 [cited by applicant]
US 20090257408A1 · Zhang et al. · 2009 [cited by applicant]
US 20090268685A1 · Chen · 2009 [cited by applicant]
US 20100041350A1 · Zhang · 2010 [cited by applicant]
US 20100173625A1 · Noh et al. · 2010 [cited by applicant]
US 20100173641A1 · Kim et al. · 2010 [cited by applicant]
US 20100177804A1 · Kwak et al. · 2010 [cited by applicant]
US 20100202378A1 · Youn et al. · 2010 [cited by applicant]
US 20100226413A1 · Muharemovic et al. · 2010 [cited by applicant]
US 20100232378A1 · Imamura et al. · 2010 [cited by applicant]
US 20100296452A1 · Futagi et al. · 2010 [cited by applicant]
US 20110019529A1 · Wang et al. · 2011 [cited by applicant]
US 20110051621A1 · Kwak et al. · 2011 [cited by applicant]
US 20110116465A1 · Miki et al. · 2011 [cited by applicant]
US 20110243066A1 · Nayeb Nazar · 2011 [cited by applicant]
US 20110317596A1 · Jongren · 2011 [cited by applicant]
US 20120033561A1 · Kawamura et al. · 2012 [cited by applicant]
US 20120163318A1 · Kishiyama · 2012 [cited by applicant]
US 20120170683A1 · Frederiksen · 2012 [cited by applicant]
US 20120263124A1 · Gaal · 2012 [cited by applicant]
US 20120327886A1 · Yu · 2012 [cited by applicant]
US 20130064169A1 · Song · 2013 [cited by applicant]
US 20130155992A1 · Yoon · 2013 [cited by applicant]
US 20130223397A1 · Kim · 2013 [cited by applicant]
US 20180139014A1 · Xiong · 2018 [cited by examiner]
US 20190372723A1 · Xiong · 2019 [cited by examiner]
US 20240039774A1 · Noh · 2024 [cited by examiner]
EP 1764943A1 · 2007 [cited by applicant]
KR 1020060016723A · 2006 [cited by applicant]
WO 0201743A1 · 2002 [cited by applicant]
WO 2007087602A2 · 2007 [cited by applicant]
WO 2008036977A2 · 2008 [cited by applicant]
WO WO2011134353A1 · 2011 [cited by examiner]
WO WO2011157032A1 · 2011 [cited by examiner]
WO WO2012174213A1 · 2012 [cited by examiner]
WO WO2014117604A1 · 2014 [cited by examiner]
Motorola, TDCCH Formats (A) for Scheduling Grants, 3GPP TSG RAN WG1 Meeting #50bis in Shanghai, China, Oct. 8-12, 2007, R1-074000. [cited by applicant]
Nokia Siemens Networks, Nokia, “Cyclic shift value definition for PUSCH demodulation RS,” 3GPP TSG RAN WG1 Meeting #52bis in Shenzhen, China, Mar. 31-Apr. 4, 2008, R1-081444. [cited by applicant]
Samsung, “Clarification on Mapping of Cyclic Shift Field in DCI format 0,” 3GPP TSG RAN WG1 #53bis in Warsaw, Poland, Jun. 30-Jul. 4, 2008, R1-082302. [cited by applicant]
ETRI, “PHICH resource identification for extended CP,” 3GPP TSG RAN WG1 #55 in Prague, Czech Rep., Nov. 10-14, 2008, R1-084530. [cited by applicant]
3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical Channels and Modulation (Release 8), 3GPP TS 36.211 V8.5.0 (Dec. 2008… [cited by applicant]
Plaintiff Sol IP's First Amended Infringement Contentions submitted on Mar. 22, 2019 for [cited by applicant]
“Draft Report of 3GPP TSG RAN WG1 #50 v0.2.0, ” 3GPP TSG RAN WG1 #50bis in Shanghai, China, Oct. 8-12, 2007, R1-073896. [cited by applicant]
Motorola, THICH Assignment for MU-MIMO in E-UTRA, 3GPP TSG RAN WG1 #50bis in Shanghai, China, Oct. 8-12, 2007, R1-074002. [cited by applicant]
Samsung, “Summary of Offline Discussions on EUTRA UL RS,” 3GPP TSG RAN WG1 Meeting #52bis in Shenzhen, China, Mar. 31-Apr. 4, 2008, R1-081662. [cited by applicant]
3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical Channels and Modulation (Release 8), 3GPP TS 36.211 V8.0.0 (Sep. 2007… [cited by applicant]
Qualcomm Europe, Structure of PBCH and Location of D-BCH,∧∧ 3GPP TSG RAN WG1 #49bis in Orlando USA, Jun. 25-29, 2007, R1-072728. [cited by applicant]
“Way forward on PHICH allocation,” 3GPP TSG RAN WG1 #52 in Sorrento, Italy, Feb. 11-15, 2008, R1-081071. [cited by applicant]
3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical Channels and Modulation (Release 8), 3GPP TS 36.211 V8.2.0 (Mar. 2008… [cited by applicant]
3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical layer procedures (Release 8), 3GPP TS 36.213 V8.2.0 (Mar. 2008). [cited by applicant]
Qualcomm Europe, “Details of the UL Demodulation RS,” 3GPP TSG RAN 1 #50 in Athens, Greece, Aug. 20-24, 2007, R1-073253. [cited by applicant]
Correspondence regarding consent to file infringement contentions under seal at the PTAB. [cited by applicant]
Petition for Inter Partes Review IPR 2020-00237 submitted on Dec. 10, 2019. [cited by applicant]
Notice of Termination for IPR2020-00237 entered Mar. 9, 2020. [cited by applicant]
Domplaint filed Mar. 17, 2021 in the Western District of Texas (Waco Division) for Case No. 6:21-cv-00270. [cited by applicant]
Non-final office action mailed Jan. 29, 2021 for U.S. Appl. No. 16/926,858. [cited by applicant]
Final office action mailed Aug. 11, 2021 for U.S. Appl. No. 16/926,858. [cited by applicant]
Notice of Allowance mailed Dec. 8, 2021 for U.S. Appl. No. 16/926,858. [cited by applicant]
Amended Complaint filed Apr. 22, 2022 in the Eastern District of Texas for Case No. 2:22-cv-00097. [cited by applicant]
Non-final Office Action mailed Dec. 23, 2022 for U.S. Appl. No. 17/683,376. [cited by applicant]
Final Office Action mailed May 11, 2023 for U.S. Appl. No. 17/683,376. [cited by applicant]
Samsung; “Clarification on Mapping of Cyclic Shift Field in DCI format 0”, 3GPP TSG-RAN Working Group 1 #53bis, Warsaw, Poland, Jun. 30-Jul. 4, 2008; R1-082302; 3 pages. [cited by applicant]
3rd Generation Partnership Project: “Physical Channels and Modulation (Release 8)”, Technical Specification Group Radio 3GPP, Evolved Universal Terrestrial Radio Accesss (E-UTRA); May 2008, 82 pages. [cited by applicant]
Qualcomm Europe; “Mapping of PHICH Resources from PUSCH and DM-RS Transmission”, 3GPP TSG-RAN WG1 #53; R1-081961; May 5-9, 2008, Kansas City, USA, pp. 1-6. [cited by applicant]
Samsung; “Clarification on Mapping of Cyclic Shift Field in DCI format 0”, 3GPP TSG-RAN Working Group 1 #53bis; R1-082302; Warsaw, Poland, Jun. 30-Jul. 4, 2008; 4 pages. [cited by applicant]
Motorola; “PHICH Assignment in E-UTRA”, 3GPP TSG RAN1 #51; R1-074588; Jeju, Korea, Nov. 5-9, 2007; 4 pages. [cited by applicant]
Non-final Office Action mailed Mar. 2, 2012 for U.S. Appl. No. 12/652,210. [cited by applicant]
Notice of Allowance mailed Jul. 23, 2012 for U.S. Appl. No. 12/652,210. [cited by applicant]
Non-final Office Action mailed Jul. 11, 2014 for U.S. Appl. No. 13/658,282. [cited by applicant]
Final Office Action mailed Dec. 12, 2014 for U.S. Appl. No. 13/658,282. [cited by applicant]
Advisory Action mailed May 22, 2015 for U.S. Appl. No. 13/658,282. [cited by applicant]
Non-final Office Action mailed Jul. 30, 2015 for U.S. Appl. No. 13/658,282. [cited by applicant]
Final Office Action mailed Mar. 21, 2016 for U.S. Appl. No. 13/658,282. [cited by applicant]
Notice of Allowance mailed Oct. 19, 2016 for U.S. Appl. No. 13/658,282. [cited by applicant]
Non-final Office Action mailed Oct. 25, 2017 for U.S. Appl. No. 15/428,578. [cited by applicant]
Final Office Action mailed Feb. 22, 2018 for U.S. Appl. No. 15/428,578. [cited by applicant]
Notice of Allowance mailed Aug. 25, 2018 for U.S. Appl. No. 15/428,578. [cited by applicant]
R1-072991, Cyclic Shift Hopping and DM RS Signaling, 3GPP TSG RAN WG1 #49bis by Nokia (“R1- 072991”). [cited by applicant]
R1-074000, PDCCH Formats (A) for Scheduling Grants, TSG-RAN1 #50 bis, Motorola (“R1-074000”). [cited by applicant]
R1-074002, PDCCH Formats (A) for Scheduling Grants, TSG-RAN1 #50 bis, Motorola (“R1-074002”). [cited by applicant]
R1-080976, Implicit assignment of PHICH, TSG RAN WG1 # 52 (“R1-080976”). [cited by applicant]
R1-080999, PHICH Linkage to Uplink Transmissions, TSG RAN WG1 # 52 (“R1-080999”). [cited by applicant]
R1-080720, Cyclic Shift Values for UL RS, TSG RAN WG1 # 52 (“R1-080720”). [cited by applicant]
R1-080776, PHICH Index Mapping for Uplink Transmission for E-UTRA, TSG-RAN WG1 Meeting # 52 (“R1-080776”). [cited by applicant]
R1-080927, PHICH and mapping to PHICH groups, TSG RAN WG1 # 52 (“R1-080927”). [cited by applicant]
R1-080674, Details of PHICH allocation, SG-RAN WG1 # 52; 3GPP TS 36.213 v8.2.0 (“R1-080674”). [cited by applicant]
R1-081444, Cyclic shift value definition for PUSCH demodulation RS, 3GPP TSG RAN WG1 #52bis, by Nokia (“R1-081444”). [cited by applicant]
R1-081961, Mapping of PHICH Resources from PUSCH and DM-RS Transmission, 3GPP TSG-RAN WG1 #53 by Qualcomm Europe (“R1-081961”). [cited by applicant]
R1-082302, Clarification on Mapping of Cyclic Shift Field in DCI format 0, June 30-07-4, 2008, 3GPP TSG-RAN Working Group 1 #53bis, by Samsung fR1-082302). [cited by applicant]
R1-082439, Issues with PHICH Modifier, June 30-07-4, 2008, 3GPP TSG RAN WG1#53bis, by LG Electronics “R1-082439”). [cited by applicant]
3GPP TS 36.211 V8.4.0 (“TS 36.211 V8.4.0”). [cited by applicant]
3GPP TS 36.212 V8.4.0 (“TS 36.212 V8.4.0”). [cited by applicant]
3GPP TS 36.213 V8.4.0 (Sep. 2008) (TS 36.213 V8.4.0n). [cited by applicant]
Defendant's Preliminary Invalidity Contentk)ns submitted on Jul. 22, 2019 for Case No. 2:18-cv-00526 (E.D. Texas). [cited by applicant]
Intervenor Ericsson Inc/s Preliminary Invalidity Contentions submitted on Jul. 22, 2019 for Case No. 2:18-cv-00526 (E.D. Texas). [cited by applicant]
Exhibits M-1 to M-4 to Defendants Preliminary Invalidity Contentions submitted on Jul. 22, 2019 for Case No. 2:18-cv-00526 (E.D. Texas). [cited by applicant]
Appendix M to Defendants Preliminary Invalidity Contentions submitted on Jul. 22, 2019 for Case No. 2:18-cv-00526 (E.D. Texas). [cited by applicant]
Andrews, George E. “Number theory, Saunders.” (1971). [cited by applicant]
Non-final office action mailed Feb. 26, 2019 for U.S. Appl. No. 16/174,346. [cited by applicant]
Final office action mailed Sep. 6, 2019 for U.S. Appl. No. 16/174,346. [cited by applicant]
Notice of Allowance mailed Feb. 3, 2020 for U.S. Appl. No. 16/174,346. [cited by applicant]
Notice of Allowance mailed Jun. 17, 2020 for U.S. Appl. No. 16/174,346. [cited by applicant]
Declaration of Alexander Haimovich, Ph.D. submitted on Dec. 10, 2019 for IPR No. 2020-00237 under 37C.F.R. $1.68. [cited by applicant]
Complaint filed Dec. 3, 2018 in [cited by applicant]
3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical Channels and Modulation (Release 8), 3GPP TS 36.211 V8.4.0 (Sep. 2008… [cited by applicant]
3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical layer procedures (Release 8), 3GPP TS 36.213 V8.4.0 (Sep. 2008) (“36.… [cited by applicant]
LG Electronics, “Issues with PHICH Modifier,” 3GPP TSG RAN WG1 Meeting #53bis in Warsaw, Poland, Jun. 30 ˜ Jul. 4, 2008, R1-082439. [cited by applicant]
Qualcomm Europe, Mapping of PHICH Resources from PUSCH and DM-RS Transmission,n 3GPP TSG RAN WG1 Meeting # 53 in Kansas City, USA, May 5-9, R1-081961 (“Qualcomm-1”). [cited by applicant]
3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical Channels and Modulation (Release 8), 3GPP TS 36.211 V8.3.0 (May 2008). [cited by applicant]
3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Physical layer procedures (Release 8), 3GPP TS 36.213 V8.3.0 (May 2008). [cited by applicant]
Declaration of Craig Bishop submitted on Dec. 10, 2019 for IPR No. 2020-00237 under 37 C.F.R. § 1.68 (“Bishop Decl.”) and related appendices. [cited by applicant]