IP Library › Granted Patent US 12,284,596
Granted Patent B2
US 12,284,596 · App. 17/675,820 · Granted Apr 22, 2025

System and method for managing growing beacon size in a wireless network

Inventors: Ravi Gidvani (Fremont, CA); Shailender Karmuchi (Fremont, CA); Ashok Ranganath (Los Gatos, CA); Srinivas Kandala (Morgan Hill, CA); Wookbong Lee (San Jose, CA); Michail Koundourakis (Hamburg, DE)
Assignee: Samsung Electronics Co., Ltd.
H04W48/10H04W48/16
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,284,596
App. No.
17/675,820
Granted
Apr 22, 2025
Kind
B2
Abstract

A system and method for managing beacon size. In some embodiments, the method includes: transmitting, by an Access Point Station (AP STA) a first beacon; transmitting, by the AP STA, a second beacon indicating feature information; and transmitting, by the AP STA, a first follow-on beacon, the first follow-on beacon supplementing the feature information indicated in the second beacon.

Claims (67)

1. A method, comprising:

transmitting, by an Access Point Station (AP STA), a first beacon comprising first feature information;

transmitting, by the AP STA, a second beacon different from the first beacon indicating second feature information different from the first feature information; and

transmitting, by the AP STA, a first follow-on beacon,

the first follow-on beacon supplementing the second feature information indicated in the second beacon.

2. The method of claim 1 , wherein the first beacon comprises information specifying a time of transmission of the first follow-on beacon, and

the transmitting of the first follow-on beacon comprises transmitting the first follow-on beacon at the time specified by the first beacon.

3. The method of claim 1 , wherein a gap between an end of the first follow-on beacon and a beginning of the second beacon has a length of one Short Interframe Space.

4. The method of claim 1 , further comprising transmitting, by the AP STA, a third beacon indicating third feature information, there not being a follow-on beacon comprising feature information supplementing the third feature information indicated in the third beacon.

5. The method of claim 4 , further comprising:

receiving, by the AP STA, an action frame requesting a follow-on beacon; and

sending, by the AP STA, in response to the receiving of the action frame, a follow-on beacon.

6. The method of claim 1 , further comprising:

transmitting, by the AP STA, a third beacon;

transmitting, by the AP STA, a second follow-on beacon; and

transmitting, by the AP STA, a fourth beacon,

wherein:

the second follow-on beacon comprises feature information supplementing fourth feature information indicated in the fourth beacon; and

the transmitting of the second follow-on beacon comprises transmitting the second follow-on beacon at a time specified by:

the second beacon, and

the third beacon.

7. The method of claim 1 , wherein the transmitting, by the AP STA, of the first follow-on beacon comprises transmitting the first follow-on beacon during a Broadcast Transmit Wait Time Service Period.

8. An Access Point Station (AP STA) comprising:

a radio; and

a processing circuit,

the processing circuit being configured to:

transmit a first beacon comprising first feature information;

transmit a second beacon different from the first beacon indicating second feature information different from the first feature information; and

transmit a first follow-on beacon,

the first follow-on beacon comprising feature information supplementing the second feature information indicated in the second beacon.

9. The AP STA of claim 8 , wherein the processing circuit is further configured to transmit the first follow-on beacon at a time specified by the first beacon.

10. The AP STA of claim 8 , wherein a gap between an end of the first follow-on beacon and a beginning of the second beacon has a length of one Short Interframe Space.

11. The AP STA of claim 8 , wherein:

the processing circuit is further configured to transmit a third beacon indicating third feature information,

there not being a follow-on beacon comprising feature information supplementing the third feature information indicated in the third beacon.

12. The AP STA of claim 8 , wherein the processing circuit is further configured to:

transmit a third beacon;

transmit a second follow-on beacon; and

transmit a fourth beacon,

wherein:

the second follow-on beacon comprises feature information supplementing fourth feature information indicated in the fourth beacon; and

the transmitting of the second follow-on beacon comprises transmitting the second follow-on beacon at a time specified by:

the second beacon, and

the third beacon.

13. The AP STA of claim 8 , wherein a gap between an end of the first beacon and a beginning of the first follow-on beacon has a length of one Short Interframe Space.

14. The AP STA of claim 8 , wherein the transmitting, by the AP STA, of the first follow-on beacon, comprises transmitting the first follow-on beacon during a Broadcast Transmit Wait Time Service Period.

15. A method, comprising:

receiving, by a non-Access Point Station (non-AP STA), a first beacon comprising first feature information;

receiving, by the non-AP STA, a second beacon different from the first beacon indicating second feature information different from the first feature information;

listening, by the non-AP STA, for a first follow-on beacon; and

receiving, by the non-AP STA, the first follow-on beacon,

the first follow-on beacon comprising feature information supplementing the second feature information indicated in the second beacon.

16. The method of claim 15 , wherein:

the first beacon comprises information specifying a time of transmission of the first follow-on beacon;

the listening for the first follow-on beacon comprises listening for the first follow-on beacon at the time specified by the first beacon; and

the receiving of the first follow-on beacon comprises receiving the first follow-on beacon at the time specified by the first beacon.

17. The method of claim 15 , wherein a gap between an end of the first follow-on beacon and a beginning of the second beacon has a length of one Short Interframe Space.

18. The method of claim 15 , further comprising:

receiving, by the non-AP STA, a third beacon

receiving, by the non-AP STA, a second follow-on beacon; and

receiving, by the non-AP STA, a fourth beacon,

wherein:

the second follow-on beacon comprises feature information supplementing fourth feature information indicated in the fourth beacon; and

the receiving of the second follow-on beacon comprises receiving second first follow-on beacon at a time specified by:

the second beacon, and

the third beacon.

19. The method of claim 15 , wherein a gap between an end of the first beacon and a beginning of the first follow-on beacon has a length of one Short Interframe Space.

Assignments (3)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 14, 2025
From: GIDVANI, RAVI; KARMUCHI, SHAILENDER; KANDALA, SRINIVAS; LEE, WOOKBONG; KOUNDOURAKIS, MICHAIL
To: SAMSUNG ELECTRONICS CO., LTD.
Reel/Frame 070522/0570 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 14, 2025
From: RANGANATH, ASHOK
To: SAMSUNG SEMICONDUCTOR, INC.
Reel/Frame 070522/0590 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Mar 14, 2025
From: SAMSUNG SEMICONDUCTOR, INC.
To: SAMSUNG ELECTRONICS CO., LTD.
Reel/Frame 070522/0614 →
Continuity (3)
Provisional Application 63241191 · Sep 7, 2021
Provisional Application 63229362 · Aug 4, 2021
Related Publication 20230044914A1 · Feb 9, 2023
References Cited (13)
US 7535884B2 · Stephenson et al. · 2009 [cited by applicant]
US 9497598B2 · Liu · 2016 [cited by applicant]
US 9626698B2 · Abraham et al. · 2017 [cited by applicant]
US 10187854B2 · Trainin et al. · 2019 [cited by applicant]
US 10952139B2 · Asterjadhi et al. · 2021 [cited by applicant]
US 20130287043A1 · Nanda et al. · 2013 [cited by applicant]
US 20130301569A1 · Wang · 2013 [cited by examiner]
US 20180192369A1 · Cohn et al. · 2018 [cited by applicant]
US 20180279209A1 · Fang · 2018 [cited by examiner]
US 20190297632A1 · Huang · 2019 [cited by examiner]
US 20240114455A1 · Baek · 2024 [cited by examiner]
European Search Report for EP Application No. 22188095.8 dated Dec. 21, 2022, 10 pages. [cited by applicant]
Fischer, M. “A Possible Solution to the Beacon Length Problem”, IEEE Draft; IEEE-SA Mentor, Piscataway, NJ USA, vol. 802. 11m, No. 1, May 14, 2015, pp. 1-10. [cited by applicant]