Forecasting the progress of coking and fouling for improved production planning in chemical production plants

Inventors: Simeon Sauer (Heidelberg, DE); Daniel Keck (Ludwigshafen am Rhein, DE); Eric Jenne (Ludwigshafen am Rhein, DE); Alexander Badinski (Ludwigshafen am Rhein, DE); Miriam Angela Anna Hahkala (Ludwigshafen am Rhein, DE); Bart Blankers (Antwerp, BE); Hendrik De Winne (Antwerp, BE); Britta Carolin Buck (Ludwigshafen am Rhein, DE)
Assignee: BASF SE
C10G9/36C10G9/16C10G9/206F27D19/00G05B23/0283G06F30/27G06Q10/04G06F2119/22
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,286,597
App. No.
17/629,435
Granted
Apr 29, 2025
Kind
B2
Abstract

In order to predict the future evolution of a health-state of an equipment and/or a processing unit of a chemical production plant, e.g., a steam cracker, a computer-implemented method is provided, which builds a data-driven model for the future key performance indicator based on the key performance indicator of today, the processing condition of today, and the processing condition over a prediction horizon.

Claims (63)

1. A computer-implemented method ( 100 ) for predicting a progress of degradation in an equipment of a chemical production plant, comprising:

a) obtaining ( 110 ) a future value of at least one operating parameter of the equipment within a prediction horizon that defines a first future time period over which the progress of degradation in the equipment is predicted, wherein the at least one operating parameter has an influence on the degradation of the equipment, and

wherein the at least one operating parameter is known and/or controllable over the prediction horizon, such that the future value of the at least one operating parameter can be determined over the prediction horizon;

b) using ( 120 ) a prediction model to estimate a future value of at least one key performance indicator within the prediction horizon based on an input data set comprising the future value of the at least one operating parameter,

wherein the prediction model is parametrized or trained based on a sample set including historical data of at least one process variable and the at least one operating parameter, wherein the at least one process variable is used to determine the at least one key performance indicator; and

c) predicting ( 130 ) the progress of degradation in the equipment within the prediction horizon based on the future value of the at least one key performance indicator;

wherein the progress of degradation comprises one or more of:

a heat exchanger that suffers from a coking or other fouling process due to at least one of coke layer formation, polymerization, microbial deposits, and inorganic deposits;

a pipe where mass flow is impeded by a coking or other fouling process due to coke layer formation and/or polymerization;

a fixed bed reactor that suffers from a coking or other fouling process due to coke layer formation, polymerization, and/or deposits of solid material originating from an upstream unit operation;

a fluidized bed reactor that suffers from a coking or other fouling process due to coke layer formation, polymerization, and/or deposits of solid material originating from an upstream unit operation;

a fluidized bed reactor that suffers from a coking or other fouling process due to coke layer formation, polymerization and/or deposits of solid material originating from an upstream unit operation; and

a filter, the efficiency of which deteriorates due to polymerization and/or deposits of solid material originating from an upstream unit operation.

2. The computer-implemented method according to claim 1 , further comprising:

obtaining a value of at least one operating parameter of the equipment during the current and/or past operation of the equipment;

wherein the input data set comprises the value of the at least one operating parameter obtained during the current and/or past operation of the equipment.

3. The computer-implemented method according to claim 1 , further comprising:

obtaining at least one process variable that is measured during a current and/or past operation of the equipment;

determining a value of the at least one key performance indicator based on the at least one process variable obtained during the current and/or past operation of the equipment;

wherein the input data set further comprises the value of the at least one key performance indicator obtained during the current and/or past operation of the equipment.

4. The computer-implemented method according to claim 1 , further comprising:

repeatedly performing steps a) to c) over a further prediction horizon that defines a second future time period over which the progress of degradation in the equipment is predicted, wherein the first future time period precedes the second future time period in time.

5. The computer-implemented method according to claim 4 ,

wherein the further prediction horizon is partially overlapped with the prediction horizon; or

wherein the further prediction horizon is separate from the prediction horizon.

6. The computer-implemented method according to claim 1 ,

wherein the prediction model comprises a multiple linear regression model, optionally with regularization.

7. The computer-implemented method according to claim 1 ,

wherein the equipment comprises at least one of:

a steam-cracker furnace;

a transfer line exchanger of a steam cracker; and

an aniline catalyst.

8. An apparatus ( 200 ) for predicting a progress of degradation in an equipment of a chemical production plant, comprising:

a) an input unit ( 210 ) configured for receiving a future value of at least one operating parameter of the equipment within a prediction horizon that defines a first future time period over which the progress of degradation in the equipment is predicted,

wherein the at least one operating parameter has an influence on the degradation of the equipment, and

wherein the at least one operating parameter is known and/or controllable over a prediction horizon;

b) a processing unit ( 220 ) configured for:

using a prediction model to estimate a future value of at least one key performance indicator within the prediction horizon based on an input data set comprising the future value of the at least one operating parameter,

wherein the prediction model is parametrized or trained based on a sample set including historical data of the at least one process variable and the at least one operating parameter, wherein the at least one process variable is used to determine the at least one key performance indicator; and

predicting the progress of degradation in the equipment within the prediction horizon based on the future value of the at least one key performance indicator; and

c) an output unit ( 230 ) configured for outputting the predicted progress of degradation in the equipment

wherein the progress of degradation comprises one or more of:

a heat exchanger that suffers from a coking or other fouling process due to at least one of coke layer formation, polymerization, microbial deposits, and inorganic deposits;

a pipe where mass flow is impeded by a coking or other fouling process due to coke layer formation and/or polymerization;

a fixed bed reactor that suffers from a coking or other fouling process due to coke layer formation, polymerization, and/or deposits of solid material originating from an upstream unit operation;

a fluidized bed reactor that suffers from a coking or other fouling process due to coke layer formation, polymerization, and/or deposits of solid material originating from an upstream unit operation;

a fluidized bed reactor that suffers from a coking or other fouling process due to coke layer formation, polymerization and/or deposits of solid material originating from an upstream unit operation; and

a filter, the efficiency of which deteriorates due to polymerization and/or deposits of solid material originating from an upstream unit operation.

9. The apparatus according to claim 8 ,

wherein the input unit is configured for obtaining a value of at least one operating parameter of the equipment during the current and/or past operation of the equipment; and

wherein the input data set comprises the value of the at least one operating parameter obtained during the current and/or past operation of the equipment.

10. The apparatus according to claim 8 ,

wherein the input unit is configured for obtaining at least one process variable that is measured during a current and/or past operation of the equipment;

wherein the processing unit is configured for determining a value of the at least one key performance indicator based on the at least one process variable obtained during the current and/or past operation of the equipment; and

wherein the input data set further comprises the value of the at least one key performance indicator obtained during the current and/or past operation of the equipment.

11. The apparatus according to claim 8 ,

wherein the processing unit is configured for repeatedly performing the estimation over a further prediction horizon that defines a second future time period over which the progress of degradation in the equipment is predicted, wherein the first future time period precedes the second future time period in time.

12. The apparatus according to claim 11 ,

wherein the further prediction horizon is partially overlapped with the prediction horizon; or

wherein the further prediction horizon is separate from the prediction horizon.

13. The apparatus according to claim 8 ,

wherein the prediction model comprises a multiple linear regression model, optionally with regularization.

14. A non-transitory computer readable medium containing computer instructions stored therein for causing a computer processor to perform the steps according to claim 1 .

Assignments (4)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 30, 2022
From: SAUER, SIMEON
To: BASF SE
Reel/Frame 060938/0188 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 30, 2022
From: KECK, DANIEL; JENNE, ERIC; BADINSKI, ALEXANDER; HAHKALA, MIRIAM ANGELA ANNA; BUCK, BRITTA CAROLIN
To: BASF SE
Reel/Frame 060938/0221 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 30, 2022
From: BLANKERS, BART; DE WINNE, HENDRIK
To: BASF ANTWERPEN N.V.
Reel/Frame 060938/0415 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 30, 2022
From: BASF ANTWERPEN N.V.
To: BASF SE
Reel/Frame 060938/0438 →
Priority Claims (2)
EP 19188437 · Jul 25, 2019 · regional
EP 19197875 · Sep 17, 2019 · regional
Continuity (1)
Related Publication 20220243133A1 · Aug 4, 2022
References Cited (23)
US 20080140352A1 · Goebel et al. · 2008 [cited by applicant]
US 20090048816A1 · Srinivasa et al. · 2009 [cited by applicant]
US 20100191361A1 · McCready et al. · 2010 [cited by applicant]
US 20110016073A1 · Katnikov · 2011 [cited by applicant]
US 20170101586A1 · Iliyas et al. · 2017 [cited by applicant]
US 20190188584A1 · Rao · 2019 [cited by examiner]
CN 101370926A · 2009 [cited by applicant]
CN 103207949A · 2013 [cited by applicant]
CN 104711009A · 2015 [cited by applicant]
CN 105423770A · 2016 [cited by applicant]
JP 52040384B2 · 1977 [cited by applicant]
JP 07268356A · 1995 [cited by applicant]
JP 2017524041A · 2017 [cited by applicant]
RU 2503948C2 · 2014 [cited by applicant]
English translation for CN 105423770 A (Year: 2016). [cited by examiner]
International Search Report and Written Opinion received for PCT Patent Application No. PCT/EP2020/071140, mailed on Nov. 27, 2020, 9 pages. [cited by applicant]
Kelling et al., “Development ofacontrolconceptforcatalystregenerationby coke combustion” Chemical Engineering Science, vol. 83, 2012, pp. 138-148. [cited by applicant]
Liu C et al., “Cyclic scheduling for best profitability of industrial cracking furnace system”, Computers & Chemical Engineering, Pergamon Press, Oxford, GB, vol. 34, No. 4, Apr. 5, 2010 (Apr. 5, 2010), pp. 544-554. [cited by applicant]
Rostrup-Nielsen et al., “Industrial relevance of coking”, Catalysis Today, vol. 37, 1997, pp. 225-232. [cited by applicant]
Genkin, Equipment of chemical plants: Textbook for technical schools.—3rd ed.,rev. and ext, 1978, 272, 7 pages. [cited by applicant]
International Preliminary Report on Patentability received for PCT Patent Application No. PCT/EP2020/071140, mailed on Feb. 3, 2022, 8 pages. [cited by applicant]
Izmenenie, Change of efficiency of chemical equipment in the process of operation Candidate of technical sciences A.A. Toporov, doctor of technical sciences, Prof. A.S.Parfenyuk. Donetsk National Technical University. S… [cited by applicant]
Yuelong et al., “Heat exchanger health status state prediction”, vol. 1, No. 1, Jan. 28, 2015, pp. 91-96. [cited by applicant]