US 20140248882A1
· Wang et al.
· 2014
[cited by applicant]
US 20210211945A1
· Rugeland et al.
· 2021
[cited by applicant]
WO 2019194649A1
· 2019
[cited by applicant]
3GPP TS 23.401 V16.5.0 (Dec. 2019); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; General Packet Radio Service (GPRS) enhancements for Evolved Un…
[cited by applicant]
3GPP TS 23.501 V16.3.0 (Dec. 2019); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; System architecture for the 5G System (5GS); Stage 2; (Release …
[cited by applicant]
3GPP TS 23.502 V16.3.0 (Dec. 2019); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Procedures for the 5G System (5GS); Stage 2; (Release 16).
[cited by applicant]
3GPP TS 24.301 V16.3.0 (Dec. 2019); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; Non-Access-Stratum (NAS) protocol for Evolved Packet System (EPS…
[cited by applicant]
3GPP TS 24.501 V16.3.0 (Dec. 2019); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; Non-Access-Stratum (NAS) protocol for 5G System (5GS); Stage 3; …
[cited by applicant]
3GPP TS 33.401 V16.1.0 (Dec. 2019); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; 3GPP System Architecture Evolution (SAE); Security architecture…
[cited by applicant]
3GPP TS 33.501 V15.5.0 (Jun. 2019); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Security architecture and procedures for 5G system (Release 15).
[cited by applicant]
3GPP TS 36.300 V16.0.0 (Dec. 2019); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Univer…
[cited by applicant]
3GPP TS 36.304 V15.5.0 (Dec. 2019); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); User Equipment (U…
[cited by applicant]
3GPP TS 36.321 V15.7.0 (Sep. 2019); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Medium Access Con…
[cited by applicant]
3GPP TS 36.331 V15.7.0 (Sep. 2019); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Radio Resource Co…
[cited by applicant]
3GPP TS 36.331 V15.8.0 (Dec. 2019); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA); Radio Resource Co…
[cited by applicant]
3GPP TS 36.413 V16.0.0 (Dec. 2019); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access Network (E-UTRAN);S1 Applic…
[cited by applicant]
3GPP TS 36.423 V16.0.0 (Dec. 2019); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access Network (E-UTRAN); X2 appli…
[cited by applicant]
3GPP TS 38.300 V16.0.0 (Dec. 2019); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; NR and NG-RAN Overall Description; Stage 2; (Release 16).
[cited by applicant]
3GPP TS 38.304 V15.6.0 (Dec. 2019); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; User Equipment (UE) procedures in Idle mode and RRC Inactive state…
[cited by applicant]
3GPP TSG-RAN WG2 Meeting #103bis; R2-1813836; Chengdu, China, Oct. 8-12, 2018; CR-Form-v11.2; Correction on UE behaviour in inactive state upon inter-RAT cell (re)selection; (Release 15).
[cited by applicant]
3GPP TS 38.321 V15.8.0 (Dec. 2019); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Medium Access Control (MAC) protocol specification; (Release 15).
[cited by applicant]
3GPP TS 38.331 V15.8.0 (Dec. 2019); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NR; Radio Resource Control (RRC) protocol specification; (Release 15).
[cited by applicant]
3GPP TS 38.413 V16.0.0 (Dec. 2019); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NG-RAN; NG Application Protocol (NGAP); (Release 16).
[cited by applicant]
3GPP TS 38.423 V16.0.0 (Dec. 2019); Technical Specification; 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; NG-RAN; Xn application protocol (XnAP); (Release 16).
[cited by applicant]
R2-1707911; 3GPP TSG-RAN WG2 #99; Berlin, Germany, Aug. 21-25, 2017; Resubmission of R2-1706412;Source: CATT; Title:Service types in inactive Mode; Agenda Item:10.4.2.2.
[cited by applicant]
R2-1708075; 3GPP TSG-RAN WG2#99 Meeting; Berlin, Germany,Aug. 21-25, 2017updates of R2-1706740; Agenda Item:10.4.2.2; Source: Huawei, HiSilicon; Title: Cell selection and reselection rules; Agenda Item: 10.4.2.2.
[cited by applicant]
R2-1708256; 3GPP TSG-RAN WG2 Meeting NR #99; Berlin, Germany, Aug. 21-25, 2017 Revision of R2-1706760; Source: MediaTek Inc.; Title:Cell Selection and Reselection in NR; Agenda Item:10.4.2.2.
[cited by applicant]
R2-1708315; 3GPP TSG-RAN WG2 NR RAN2#99; Berlin, Germany, Aug. 21-25, 2017(revision of R2-1707447); Source: HTC, Mediatek; Title:Discussion on cell (re)selection while the beam number is less than N; Agenda Item:10.4.2.…
[cited by applicant]
R2-1708476; 3GPP TSG-RAN WG2 #99; Berlin, Germany, Aug. 21-25, 2017; Source:Nokia, Alcatel-Lucent Shanghai Bell; Title: Implementing Reselections in NR—cell selection and reselection; Agenda item:10.4.2.2.
[cited by applicant]
R2-1708816; 3GPP TSG-RAN WG2 Meeting #99; Berlin, Germany, Aug. 21-25, 2017(Resubmitted R2-1707055); Source: Intel Corporation; Title:Further considerations for cell (re)selection; Agenda item:10.4.2.2.
[cited by applicant]
R2-1708858; 3GPP TSG-RAN WG2# 99; Berlin, Germany, Aug. 21-25, 2017; Source: China telecom; Title:Service based Inter-RAT cell reselection; Agenda Item:10.4.2.2.
[cited by applicant]
R2-1708983 A cell-specific parameter for cell reselection; 3GPP TSG RAN WG2 Meeting #99; Berlin, Germany Aug. 21-25, 2017; Source:CMCC; Title:A cell-specific parameter for cell reselection; Agenda item:10.4.2.2.
[cited by applicant]
R2-1709298; 3GPP TSG-RAN WG2 #99 on NRTdoc; Berlin, Germany, Aug. 21-25, 2017 (Revision of R2-1707278); Source: Ericsson; Title:Cell selection and re-selection criteria and measurement configuration; Agenda Item:10.4.2.…
[cited by applicant]
R2-1709594NR; 3GPP TSG-RAN WG2 2017 RAN2#99 Meeting; Berlin, Germany, Aug. 21-25, 2017 (Resubmission of R2-1707313); Source:Samsung; Title:NR IDLE mode Cell Selection/Reselection; Agenda item:10.4.2.2.
[cited by applicant]
R2-1709634; 3GPP TSG-RAN2 Meeting #99; Berlin, Germany, Aug. 21-25, 2017; Source: Qualcomm Incorporated; Title: Cell selection and reselection for NR; Agenda item:10.4.2.2.
[cited by applicant]
R2-1710120; 3GPP TSG-RAN WG2 #99bis; Prague, Czech Republic, Oct. 9-13, 2017; Source:Samsung; Title:RAN paging area for NR; Agenda item:10.4.1.7.1.
[cited by applicant]
R2-1713058; 3GPP TSG-RAN WG2 #100; Reno, Nevada, USA, Nov. 27-Dec. 1, 2017; Source:Ericsson; Title:Evaluation for early data transmissions; Agenda Item:9.14.2.
[cited by applicant]
R2-1713785 9.13.2; 3GPP TSG-RAN2 Meeting RAN2 #100; Reno, USA, Nov. 27-Dec. 1, 2017Revision of R2-1711402; Source:LG Electronics Inc.; Title:Early Data Transmission Failure Handling in NB-IoT; Agenda Item: 9.13.2.
[cited by applicant]
R2-1805015; 3GPP TSG RAN WG2 Meeting#101bis; Sanya, China, Apr. 16-20, 2018; Source:Intel Corporation; Title: Open issues related to connection resume procedure; Agenda item:10.4.1.3.6.
[cited by applicant]
R2-1805078; 3GPP TSG-RAN WG2 Meeting#101bis; Sanya, China, Apr. 16-20, 2018; Source:Huawei; Title:Report of the Email discussion [101#57][NB-IoT/MTC R15] EDT remaining issues; Agenda Item: 9.14.2.
[cited by applicant]
R2-1805270; 3GPP TSG-RAN WG2 Meeting #101bis; Sanya, China, Apr. 16-20, 2018; (Early data transmission); Source: LG Electronics Inc.; Agenda Item: 9.14.2.
[cited by applicant]
R2-1807356; 3GPP TSG RAN WG2 Meeting#102; Busan, Korea, May 21-25, 2018 ; Source:Intel Corporation; Title:Clarification on cell reselection during resume procedure; Agenda item:10.4.1.3.6.
[cited by applicant]
R2-1807910; 3GPP TSG-RAN WG2 #102Tdoc R2-180xxxx; Busan, Korea, May 21-25, 2018; CR-Form-v11.2; Title: Connection control TP; Change Request: 38.331CR CRNum rev—current version: 15.1.0.
[cited by applicant]
R2-1906054; 3GPP TSG-RAN WG2 Meeting #106; Reno, USA, May 13-17, 2019 Revision of R2-1904687; Source:Qualcomm Incorporated, Huawei, HiSilicon; Title:Access Stratum Release Assistance Indicator for eMTC; Agenda item:12.2…
[cited by applicant]
R2-1913118; 3GPP TSG-RAN WG2 #107bisTdoc; Chongqing, China, Oct. 14-18, 2019; Source:Ericsson; Title:Remaining issues for UP solution and 5GC; Agenda Item:7.1.12.1.
[cited by applicant]
R2-1913757; 3GPP TSG-RAN WG2 #107bisR2- 1913757; Chongqing, China, Oct. 14-18, 2019Revision of R2-1910897; Source:Ericsson; Title:RRC release after EDT for User Plane CloT EPS optimization; Agenda Item:7.1.13.
[cited by applicant]
R2-1914356_S2-1910804; 3GPP TSG RAN WG2#108; Reno, USA, Nov. 18-22, 2019; SA WG2 Meeting #S2-135S2-1910804; Oct. 14-18, 2019, Split Croatia(e-mail revision 6 of S2-1910631).
[cited by applicant]
R2-1915309 MT-EDT; 3GPP TSG-RAN WG2 Meeting #108; Reno, Nevada, USA, Nov. 18-22, 2019; Source: Huawei, HiSilicon; Title:Discussion on remaining aspects of MT-EDT; Agenda Item:7.1.2.
[cited by applicant]
R2-1915393; 3GPP TSG-RAN WG2 Meeting #108; Reno, Nevada, USA, Nov. 18-22, 2019; CR-Form-v12.0.
[cited by applicant]
R2-1915531; 3GPP TSG-RAN WG2 Meeting #108; Reno, USA, Nov. 18-22, 2019; Source:Huawei, HiSilicon; Title:Remaining issues of DL quality report; Agenda Item: 7.1.6.
[cited by applicant]
R2-1915609; 3GPP TSG-WG2 Meeting #108; Reno, USA, Nov. 18-22, 2019; CR-Form-v12.0; Source to WG: Qualcomm Incorporated; Source to TSG: R2; Title: Introduction of additional enhancements for eMTC; Change Request 38.300 C…
[cited by applicant]
R2-1915717 eMTC-36.331-runningCR-RAN2#108; 3GPP TSG-RAN2 Meeting #18; Reno, Nevada, Nov. 18-22, 2019; CR-Form-v12.0; Source to WG: Qualcomm Incorporated; Source to TSG: R2; Title: Introduction of Rel-16 eMTC enhancement…
[cited by applicant]
R2-1915718; 3GPP TSG-RAN WG2 Meeting #108; Reno, Nevada, USA Nov. 18-22, 2019; Source: Qualcomm Incorporated; Title: Discussion on reply LS from SA2 on MT-EDT; Agenda item:7.1.1.
[cited by applicant]
R2-1915719; 3GPP TSG-RAN2 Meeting #108; Reno, Nevada, Nov. 18-22, 2019; Title:[Draft] Reply LS on Mobile-terminated Early Data Transmission; Reply to: Reply LS on Mobile-terminated Early Data Transmission (S2-19108041);…
[cited by applicant]
R2-1915720; 3GPP TSG-RAN WG2 Meeting #108; Reno, Nevada, USA Nov. 18-22, 2019; Agenda item :7.1.2, 7.2.2; Source: Qualcomm Incorporated; Title: MT-EDT related Editor's Notes and FFSes in RRC running CR; Document for: Di…
[cited by applicant]
R2-1915772 ; 3GPP TSG-RAN WG2 #108R2-1915772 Reno, NV, USA, Nov. 18-22, 2019; Revision of R2-1913757; Agenda Item: 7.2.10; Source: Ericsson; Title: RRC release assistance for Control and User Plane CloT EPS optimization…
[cited by applicant]
R2-1915947; 3GPP TSG-RAN WG2 Meeting #107bis; Reno, USA, Nov. 18-Nov. 22, 2019; Agenda Item: 7.1.2, 7.2.2 (MT EDT); Source: LG Electronics Inc.; Title: Discussion on MT EDT support for 5G CloT; Document for: Discussion …
[cited by applicant]
R2-1916357; 3GPP TSG-RAN2 Meeting #108; Reno, Nevada, Nov. 18-22, 2019; Title: [Draft] Reply LS on Mobile-terminated Early Data Transmission; Reply to: Reply LS on Mobile-terminated Early Data Transmission (S2-19108041)…
[cited by applicant]
R2-1916361; 3GPP TSG-TSG-WG2 Meeting #108; Reno, USA, Nov. 18-22, 2019; Title: Introduction of Rel-16 eMTC enhancements.
[cited by applicant]
R3-193415; 3GPP TSG-RAN WG3 Meeting #105; Ljubljana, Slovenia, Aug. 26-30, 2019; Title: Consideration on RLF for NB-IoT; Source: Huawei; Agenda item: 14.4; Document for: Discussion.
[cited by applicant]
RP-193252; 3GPP TSG RAN Meeting #86; Sitges, Spain, Dec. 9-12, 2019; Source: ZTE Corporation Title: Work Item on NR smalldata transmissions in Inactive state; Document for: Approval; Agenda Item: 9.1.2.
[cited by applicant]