IP Library Granted Patent US 12,305,542
Granted Patent B2
US 12,305,542 · App. 18/366,812 · Granted May 20, 2025

Combined power generation system and control method thereof

Inventors: Young Hoon Bae (Changwon, KR); Woo Won Jeon (Changwon, KR); Kwang Hun Jeong (Gimhae, KR)
Assignee: DOOSAN ENERBILITY CO., LTD.
F01K9/04F01K7/16F01K19/00F01K23/10
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,305,542
App. No.
18/366,812
Granted
May 20, 2025
Kind
B2
Abstract

Disclosed herein is a combined power generation system that includes a heat recovery steam generator configured to recover exhaust heat from a gas turbine to produce steam and including a high-pressure superheater and a reheater, a steam turbine operated by receiving the produced steam and including a high-pressure turbine, a medium-pressure turbine, and a low-pressure turbine, a condenser installed under the low-pressure turbine to condense steam, a high-pressure steam line for supplying the high-pressure turbine with the steam produced by the high-pressure superheater, a medium-pressure steam line for supplying the medium-pressure turbine with the steam that has passed through the high-pressure turbine, a high-pressure bypass line connected from the high-pressure steam line to the medium-pressure steam line, a reheat steam bypass line connected from downstream of the medium-pressure steam line to the condenser, and an additional high-pressure bypass line connected from the high-pressure steam line to the condenser.

Claims (25)

1. A combined power generation system comprising:

a heat recovery steam generator configured to recover exhaust heat from a gas turbine to produce steam, the heat recovery steam generator comprising a high-pressure superheater and a reheater;

a steam turbine operated by receiving the produced steam, the steam turbine comprising a high-pressure turbine, a medium-pressure turbine, and a low-pressure turbine;

a condenser installed under the low-pressure turbine to condense the steam;

a high-pressure steam line for supplying the high-pressure turbine with the steam produced by the high-pressure superheater;

a medium-pressure steam line for supplying the medium-pressure turbine with the steam that has passed through the high-pressure turbine;

a high-pressure bypass line connected from the high-pressure steam line to the medium-pressure steam line;

a reheat steam bypass line connected from downstream of the medium-pressure steam line to the condenser, and

an additional high-pressure bypass line connected from the high-pressure steam line to the condenser,

wherein the additional high-pressure bypass line has a physical capacity which is equal to a value determined by:

multiplying a difference in the amount of steam that is able to be discharged from the high-pressure bypass line and from the reheat steam bypass line, by a ratio of a design condition flux of the high-pressure bypass line and a discharge flux at startup, and

wherein the amount of steam is calculated by multiplying a reference cross-sectional area derived by multiplying a reciprocal of a product of density and sound speed under design pressure and temperature conditions by a design flux, and a product of density and sound speed under steam turbine pressure and temperature conditions required at startup.

2. The combined power generation system according to claim 1 , further comprising:

a high-pressure bypass valve provided in the high-pressure bypass line;

a reheat steam bypass valve provided in the reheat steam bypass line; and

an additional high-pressure bypass valve provided in the additional high-pressure bypass line.

3. The combined power generation system according to claim 2 , wherein when the reference cross-sectional area is derived,

in the high-pressure bypass line, a maximum cross-sectional area is obtained by dividing a design flux by a maximum steam flux per unit area and dividing the same by a valve position at the time of design, and

in the reheat steam bypass line, a maximum cross-sectional area is obtained by dividing a design flux by a maximum steam flux per unit area and dividing the same by a valve position at the time of design.

4. The combined power generation system according to claim 2 , wherein when the amount of steam that is able to be discharged at startup is derived,

in the high-pressure bypass line, under conditions at startup, a steam flux is calculated by multiplying a maximum steam flux per unit area by the reference cross-sectional area, and

in the reheat steam bypass line, under conditions at startup, a steam flux is calculated by multiplying a maximum steam flux per unit area by the reference cross-sectional area.

5. The combined power generation system according to claim 2 , wherein when the capacity of the additional high-pressure bypass line is determined,

for conversion into design conditions, the difference in the amount of steam that is able to be discharged from the high-pressure bypass line and from the reheat steam bypass line is multiplied by the ratio of the design condition flux and the discharge flux at startup, and

the capacity of the additional high-pressure bypass line is designed to be a maximum valve position by dividing the design condition flux by a valve position at the time of design.

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 8, 2023
From: BAE, YOUNG HOON; JEON, WOO WON; JEONG, KWANG HUN
To: DOOSAN ENERBILITY CO., LTD.
Reel/Frame 064518/0909 →
Priority Claims (1)
KR 10-2022-0163033 · Nov 29, 2022 · national
Continuity (1)
Related Publication 20240175379A1 · May 30, 2024
References Cited (19)
US 10385733B2 · Gobrecht · 2019 [cited by applicant]
US 11428115B2 · Frazer · 2022 [cited by applicant]
US 20070113562A1 · Tomlinson · 2007 [cited by examiner]
US 20090158738A1 · Hu · 2009 [cited by examiner]
US 20120233978A1 · Chillar · 2012 [cited by examiner]
US 20150113988A1 · Ichinose · 2015 [cited by applicant]
US 20170152762A1 · Murakami · 2017 [cited by applicant]
EP 3258074A1 · 2017 [cited by applicant]
JP 4503995B2 · 2010 [cited by applicant]
JP 2013502538A · 2013 [cited by applicant]
JP 5638237B2 · 2014 [cited by applicant]
JP 5734792B2 · 2015 [cited by applicant]
JP 2020084947A · 2020 [cited by applicant]
JP 2022123455A · 2022 [cited by applicant]
KR 100417202B1 · 2004 [cited by applicant]
KR 101753526B1 · 2017 [cited by applicant]
KR 102196876B1 · 2020 [cited by applicant]
Office Action from Korean Patent Office, dated Aug. 1, 2024. [cited by applicant]
EP EESR, dated Feb. 16, 2024. [cited by applicant]