IP Library Granted Patent US 12,332,678
Granted Patent B2
US 12,332,678 · App. 17/573,135 · Granted Jun 17, 2025

Transmission and distribution coordination for distributed energy resources integration to electricity markets

Inventors: Yikui Liu (Jersey City, NJ); Lei Wu (Princeton, NJ); Yonghong Chen (Zionsville, IN); Yafei Yang (Shaanxi, CN)
Assignees: MIDCONTINENT INDEPENDENT SYSTEM OPERATOR, INC.; THE TRUSTEES OF THE STEVENS INSTITUTE OF TECHNOLOGY
G05F3/04G06F17/14G06Q30/0202G06Q50/06H02J3/003H02J3/0075H02J2203/10H02J2203/20H02J2310/64
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,332,678
App. No.
17/573,135
Granted
Jun 17, 2025
Kind
B2
Abstract

One or more systems and methods according to the present disclosure may apply a model for integrating distribution systems having proliferated distributed energy resources into the independent system operator energy market, particularly when one or more distribution systems are connected to a transmission system via multiple interconnection buses. Additionally, systems and methods for applying a compact multi-port model for power exchanges and associated bidding strategies are described. A the multi-port power exchange model may be constructed based on the operational feasible region of a distribution system; describing physical operation characteristics of distributed energy resources, flexible loads, and the distribution network; and the bidding strategy model may describe total operating cost of the distribution system, while recognizing electrically coupled injections of multiple interconnection buses.

Claims (65)

1. A method of operating an electrical power grid, comprising:

collecting bids describing one or more electricity characteristics, by an operator, in an energy market from one or more electricity transmitters and one or more distributors, wherein at least one of the distributors includes interconnected distributed energy resources, the distributed energy resources intermittently providing electricity to their interconnected distributor; and

clearing in an operator day-ahead energy market model, by the operator, the energy market with consideration of a transfer limit on the electrical power grid to determine commitments of electrical power;

providing one or more electricity characteristics to the one or more distributors and to the distributed energy resources; and

causing a controlling of dispatch of the electrical power through the electrical power grid based on the commitments to capture impacts of the interconnected distributed energy resources while respecting the transfer limit on the electrical power grid;

wherein, in the collecting step, the one or more distributors prepares a projected feasible operation region of a corresponding distribution system and submits it to the operator, together with bids of distributed energy resources, the projected feasible operation region including one or more desired variables; and

wherein, in the clearing step, solutions to the one or more desired variables are sent to the one or more distributors.

2. The method of claim 1 , wherein the projected feasible operation region is based on a feasible operation region represented by the following:

p ii′,t =G ii′ ·( v i,t −v i,t )− B ii′ ·(θ i,t −θ i′,t ); ii′∈ d D ,t∈   (12)

q ii′,t =−B ii′ ·( v i,t −v i′,t )− G ii′ ·(θ i,t −θ i′,t ); ii′∈ d D ,t∈   (13)

+ = + ; i∈ d D / d B ,t∈   (14)

+ = + ; i∈ d D / d B ,t∈   (15)

= P i,t ; i∈ d B ,t∈   (16)

= q i,t ; i∈ d B ,t∈   (17)

v i,t =1; i∈ d B ,t∈   (18)

− P ii′ UB ≤p ii′,t ≤P ii′ UB ; ii′∈ d D ,t∈   (19)

V i LB ≤v i,t ≤V i UB ; i∈ d D / t∈   (20)

− P i UB ≤p i,t ≤P i UB ; i∈ d B ,t∈   (21)

− Q i UB ≤q i,t ≤Q i UB ; i∈ d B ,t∈   (22)

P g LB ≤p g,t ≤p g UB ; g∈ d D ,t∈   (23)

Q g LB ≤q g,t ≤Q g UB ; g∈ d D ,t∈   (24)

wherein p ii′,t represents active power flow along line ii′ at time t; q ii′,t represents reactive power flow along line ii′ at time t; G ii′ and B ii′ represent conductance and susceptance of line ii′; v i,t represents voltage magnitude of bus i at time t; θ i,t represents a voltage phase angle of bus i at time t; p g,t represents active power dispatch of unit g at time t; q g,t represents reactive power dispatch of unit g at time t; notations , , , and denote sets of buses, lines, DERs, flexible loads, and fixed loads in a distribution system; denotes a set of time intervals in a scheduling horizon, indexed by time t; Q f,t represents reactive power demand of fixed load f at time t; P ii′ UB represents an active power limit of line ii′; V i LB /V i UB represents a lower/upper voltage limit of bus i; and P g LB /P g UB and Q g LB /Q g UB represent active and reactive power bounds limiting dispatch ranges of DERs.

3. The method of claim 1 , wherein the projected feasible operation region is realized through a process of eliminating one or more variables by applying a Gaussian elimination and a Fourier-Motzkin elimination sequentially.

4. The method of claim 3 , wherein applying the Fourier-Motzkin elimination includes executing one or more filtering techniques to eliminate redundant constraints.

5. The method of claim 2 , wherein the projected feasible operation region is realized through a process of eliminating one or more variables by applying a Gaussian elimination and a Fourier-Motzkin elimination sequentially.

6. The method of claim 5 , wherein applying the Fourier-Motzkin elimination includes executing one or more filtering techniques to eliminate redundant constraints.

7. The method of claim 4 , wherein the projected feasible operation region is represented by the following:

·θ i,t + ·p i,t + ·p g,t ≤B h,t ; h∈ d,t ,t∈   (27)

wherein θ i,t represents a voltage phase angle of bus i at time t; A h,i,t θ , A h,i,t P , and A h,g,t G are generated coefficients to desired variables θ i,t (i∈ d B ), P i,t , and P g,t ; B h,t is a generated constant term; d,t , indexed by h, represents all generated constraints at time t of distribution system d; and denotes a set of time intervals in a scheduling horizon, indexed by time t.

8. The method of claim 6 , wherein the projected feasible operation region is represented by the following

·θ i,t + ·p i,t + ·p g,t ≤B h,t ; h∈ d,t ,t∈   (27)

wherein θ i,t represents a voltage phase angle of bus i at time t; where A h,i,t θ , A h,i,t P , and A h,g,t G are generated coefficients to desired variables θ i,t (i∈ d B ), P i,t , and P g,t ; B h,t is a generated constant term; d,t , indexed by h, represents all generated constraints at time t of distribution system d; and denotes a set of time intervals in a scheduling horizon, indexed by time t.

9. The method of claim 7 , wherein one or more distribution-side variables is set to equal one or more transmission-side counterparts as follows:

{circumflex over (p)} i′,d,t =p i,t ; i′∈ i,d T ,i∈ d B ,t∈   (28)

θ i′t =θ i,t ; i′∈ i,d T ,i∈ d B ,t∈   (29)

wherein {circumflex over (p)} i′,d,t and {circumflex over (θ)} i′,t represent transmission system counterparts of p i,t and θ i,t ; d B represents a set of duplicated interconnection buses in distribution system d; i,d T represents a transmission system counterpart of d B ; and denotes a set of time intervals in a scheduling horizon, indexed by time t.

10. The method of claim 4 , wherein the operator includes the projected feasible operation region in the day-ahead energy market model.

11. The method of claim 6 , wherein the operator includes the projected feasible operation region in the day-ahead energy market model.

12. A method of operating an electrical power grid, comprising:

collecting bids describing one or more electricity characteristics, by an operator, in an energy market from an electricity transmitter and one or more distributors, wherein the one or more distributors include interconnected distributed energy resources, each distributed energy resource intermittently providing electricity to its interconnected distributor;

calculating, by the operator, a distribution-to-distribution sub-matrix of an energy market clearing model for each distributor and releasing the calculated distribution-to-distribution sub-matrix to each distributor;

preparing, by each distributor, a multi-port power-exchange model from the calculated distribution-to-distribution sub-matrix and submitting the prepared multi-port power-exchange model to the operator; and

clearing, in the energy market clearing model, by the operator, the energy market with consideration of a transfer limit on the electrical power grid to determine commitments of electrical power;

providing one or more electricity characteristics to the one or more distributors and to the distributed energy resources; and

causing a controlling of dispatch of the electrical power through the electrical power grid based on the commitments to capture impacts of the interconnected distributed energy resources while respecting the transfer limit on the electrical power grid;

wherein the energy market clearing model additionally includes one or more elements of a distribution-to-transmission sub-matrix to account for impacts of the distributors on one or more transmission line constraints.

13. The method of claim 12 , wherein the multi-port power-exchange model accounts for one or more physical operation features of a corresponding distributor.

14. The method of claim 13 , wherein the multi-port power-exchange model is represented by the following:

· p n ≤B h ; h∈   (40)

wherein represents a set of ports indexed by n; A h,n represents a generated coefficient to p n ; p n denotes power flow injected into a distribution system through port n; B h represents a generated constant term; and represents a set of generated constraints indexed by h.

15. The method of claim 12 , wherein the preparing step includes formulating an operation feasible region.

16. The method of claim 15 , wherein the operation feasible region is represented by the following:

− F l UB ≤ ·( − − )≤ F l UB ; l∈   (41)

p n = ·( − − ); n∈   (42)

− F n UB ≤p n ≤F n UB ; n∈   (43)

P g LB ≤p g ≤P g UB ; g∈   (44)

P d LB ≤p d ≤P d UB ; d∈   (45)

wherein F l UB and F n UB represent capacity limits of distribution line l and port n; SF l,i and SF n,i represents shift factors of bus i to line l and port n, respectively; P f represents demand level of fixed load f; [P g LB , P g UB ] and [P d LB , P d UB ] represent dispatch ranges of DER g and flexible load d; and represents a set of ports is indexed by n.

17. The method of claim 16 , wherein the multi-port power-exchange model is constructed from (41)-(45) by applying Gaussian elimination and Fourier-Motzkin elimination.

18. The method of claim 17 , wherein the application of Fourier-Motzkin elimination includes a step of removing redundant constraints through the sequential application of Imbert's acceleration theorems, boundary filtering, and linear programming filtering.

19. The method of claim 16 , further comprising optimizing a total operating cost of each distribution system by solving the following or an approximation thereof:

min C ( {circumflex over (p)} n )= · p g − ·p d   (46)

Constraints (41) and (44)-(45);  (47)

{circumflex over (p)} n = ·( − − ); n∈   (48)

wherein p n represents power flow injected into a distribution system through port n; {circumflex over (·)} indicates a known solution of a variable; C({circumflex over (p)} n ) represents an operating cost as a function of p n over a feasible region; C g and C d represents price of DER g and flexible load d; p g and p d denote dispatches of DER g and flexible load d; P f represents demand level of fixed load f; SF n,i is shift factor of bus i to port n; i , i , and i denote sub-sets of DERs, flexible loads, and fixed loads at bus i, indexed by g, d, and f, and represents a set of ports is indexed by n.

Assignments (2)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 29, 2025
From: LIU, YIKUI; WU, LEI; YANG, YAFEI
To: THE TRUSTEES OF THE STEVENS INSTITUTE OF TECHNOLOGY
Reel/Frame 070968/0796 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Apr 28, 2022
From: CHEN, YONGHONG
To: MIDCONTINENT INDEPENDENT SYSTEM OPERATOR, INC.
Reel/Frame 059707/0829 →
Continuity (2)
Provisional Application 63136303 · Jan 12, 2021
Related Publication 20220229459A1 · Jul 21, 2022
References Cited (41)
US 7835978B2 · Camenisch · 2010 [cited by examiner]
US 20030220864A1 · Peljto · 2003 [cited by examiner]
US 20030229576A1 · Peljto · 2003 [cited by examiner]
US 20090319415A1 · Stoilov · 2009 [cited by examiner]
US 20160077507A1 · Sheble · 2016 [cited by examiner]
US 20180287382A1 · Genc · 2018 [cited by examiner]
US 20200082422A1 · Sun · 2020 [cited by examiner]
US 20220284458A1 · Sun · 2022 [cited by examiner]
US 20220285942A1 · Koo · 2022 [cited by examiner]
Wang et al., Day-ahead optimal bidding and scheduling strategies for DER aggregator considering responsive uncertainty under real-time pricing, 2020 (Year: 2020). [cited by examiner]
On Accurate and Compact Model of High DER-Penetrated Sub-Transmission/Primary Distribution Systems in ISO Energy Market (Year: 2021). [cited by examiner]
Vincente-Pastor et al.; “Evaluation of Flexibility Markets for Retailer-DSO-TSO Coordination”; IEEE Transactions on Power Systems; vol. 34; May 2019; p. 2003-2012. [cited by applicant]
Barkin et al.; “Toward Coordinated Transmission and Distribution Operations”; IEEE Power & Energy Society General Meeting; 2018; 5 pages. [cited by applicant]
Safdarian et al.; “Optimal Electricity Procurement in Smart Grids With Autonomous Distributed Energy Resources”; IEEE Transactions on Smart Grid; vol. 6(6); 2015; p. 2795-2984. [cited by applicant]
Saint-Pierre et al.; “Active Distribution System Management: A Dual-Horizon Scheduling Framework for DSO/TSO Interface Under Uncertainty”; IEEE Transactions on Smart Grid; vol. 8 No. 5; Sep. 2017; p. 2186-2197. [cited by applicant]
Anthony Papavasiliou; “Coordination Schemes for the Integration of Transmission and Distribution System Operations”; Center for Operations Research and Econometrics; Oct. 2017; 28 pages. [cited by applicant]
Yuan et al.; “Hierarchical coordination of TSO-DSO economic dispatch considering large-scale integration of distributed energy resources”; Applied Energy; vol. 195; 2017; p. 600-615 (abstract only). [cited by applicant]
Silva et al.; “Estimating the Active and Reactive Power Flexibility Area at the TSO-DSO Interface”; IEEE Transactions on Power Systems; vol. 33; 2018; p. 4741-4750. [cited by applicant]
Shahidehpour et al.; “Market Operations in Electric Power Systems—Forecasting, Scheduling, and Risk Management”; The Institute of Electrical and Electronics Engineers Inc. New York; John Wiley & Sons Inc.; © 2002; 531 p… [cited by applicant]
Wu et al.; “Stochastic SCUC Solution with Variable Wind Energy Using Constrained Ordinal Optimization”; IEEE Transactions on Sustainable Energy; vol. 5 No. Apr. 2, 2014; p. 379-388. [cited by applicant]
Doe; Quadrennial Energy Review Transforming the Nation's Electricity System: The Second Installment of the QER; Jan. 2017; 512 pages. [cited by applicant]
Li et al.; “Valuation of distributed energy resources in active distribution networks”; The Electricity Journal; vol. 32; May 2019; p. 27-36 (abstract only). [cited by applicant]
Hadush et al.; “DSO-TSO cooperation issues and solutions for distribution grid congestion management”; Energy Policy; vol. 120; Sep. 2018; 49 pages. [cited by applicant]
Verzijlberg et al.; “Renewable Energy Sources and Responsive Demand. Do We Need Congestion Management in the Distribution Grid?”; IEEE Transactions on Power Systems; vol. 29; Sep. 2014; p. 2119-2128 (abstract only). [cited by applicant]
Birk et al.; “TSO/DSO Coordination in a Context of Distributed Energy Resource Penetration”; MIT Center for Energy and Environmental Policy Research; Working Paper Series; Oct. 2017; 28 pages. [cited by applicant]
Wu et al.; “Demand Response Exchange in the Stochastic Day-Ahead Scheduling with Variable Renewable Generation”; IEEE Transactions on Sustainable Energy; vol. 6 No. 2; Apr. 2015; p. 516-525. [cited by applicant]
Bragin et al.; “Toward Coordinated Transmission and Distribution Operations”; IEEE Power & Energy Society General Meeting; Mar. 2018; 5 pages. [cited by applicant]
Fu et al.; “Different models and properties on LMP calculations”; IEEE Power Engineering Society General Meeting; 2006; 11 pages. [cited by applicant]
G. Strang; Linear Algebra and Its Application; 4 [cited by applicant]
J. L. Imbert; “Fourier's Elimination: Which to Choose?”; In Proc. PPCP; Chapter 1; 1993; 26 pages. [cited by applicant]
Paulraj et al.; “A Comparative Study of Redundant Constraints Identification Methods in Linear Programming Problems”; Mathematical Problems in Engineering; vol. 2010; 2010; 16 pages. [cited by applicant]
Vielma et al.; “Modeling disjunctive constraints with a logarithmic number of binary variables and constraints”; Mathematical Programming; vol. 128; 2011; 20 pages. [cited by applicant]
Misener et al.; “Piecewise-Linear Approximations of Multidimensional Functions”; Journal of Optimization Theory and Applications; vol. 145; 2010; 31 pages. [cited by applicant]
Wu et al.; “Accelerating NCUC Via Binary Variable-Based Locally Ideal Formulation and Dynamic Global Cuts”; IEEE Transactions on Power Systems; vol. 31; Sep. 2016; p. 4097-4107 (abstract only). [cited by applicant]
Lofberg et al.; “YALMIP: a toolbox for modeling and optimization in MATLAB”; IEEE Int'l Conf. on Robotics and Automation; 2004; 6 pages. [cited by applicant]
W. Hogan et al.; “Electricity Markets and the Clean Power Plan”; The Electricity Journal; vol. 28; Sep. 2015; 31 pages. [cited by applicant]
Keane et al.; “Enhanced Utilisation of Voltage Control Resources with Distributed Generation”; IEEE Transactions on Power Systems; vol. 26; May 2011; p. 252-260. [cited by applicant]
Nyiso; “Distributed Energy Resources Roadmap for New York's Wholesale Electricity Markets”; Jan. 2017; 39 pages. [cited by applicant]
Daraeepour et al.; “Strategic Demand-Side Response to Wind Power Integration”; IEEE Transactions on Power Systems; vol. 31 No. 5; Sep. 2016; p. 3495-3505. [cited by applicant]
Yang et al.; “Solving OPF using linear approximations: fundamental analysis and numerical Demonstration”; IET Generation, Transmission & Distribution; vol. 11 No. 17; 2017; p. 4115-4125. [cited by applicant]
Abiri-Jahromi et al.; “On the Loadability Sets of Power Systems—Part II: Minimal Representations”; IEEE Transactions on Power Systems; vol. 32; 2017; p. 146-156. [cited by applicant]