IP Library › Granted Patent US 12,341,467
Granted Patent B2
US 12,341,467 · App. 18/235,671 · Granted Jun 24, 2025

Solar panel installation system

Inventor: Shingo Hosaka (Yamaguchi, JP)
Assignee: KABUSHIKI KAISHA LAILE
H02S20/30
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,341,467
App. No.
18/235,671
Granted
Jun 24, 2025
Kind
B2
Abstract

A solar panel installation system includes solar panels with orientations or positions changeable. A solar panel installation system ( 1 B) includes a first rail ( 20 ) on a rooftop of a building ( 33 ), a support carrier ( 23 a ) located on the first rail ( 20 ), including a portion protruding outward from the building ( 33 ), and movable along the first rail ( 20 ), a post ( 10 ) extending in a vertical direction along a side surface of the building ( 33 ) and directly or indirectly supported by the portion of the support carrier ( 23 a ) protruding outward from the building ( 33 ), a plurality of solar panels ( 13 ) fixed to the post ( 10 ), and a carrier driver that moves the support carrier ( 23 a ) in a first direction along a length of the first rail ( 20 ) or in a second direction opposite to the first direction.

Claims (47)

1. A solar panel installation system ( 1 , 1 B′), comprising:

a first rail ( 20 ) on a rooftop of a building ( 33 ) or on a structure;

a first support carrier ( 23 a , 23 b , 23 c , 23 d ) located on the first rail ( 20 ) and including a portion protruding outward from the building ( 33 ) or from the structure, the first support carrier ( 23 a , 23 b , 23 c , 23 d ) being movable along the first rail ( 20 );

a first post ( 10 ) directly or indirectly supported by the portion of the first support carrier ( 23 a , 23 b , 23 c , 23 d ) protruding outward from the building ( 33 ) or from the structure, the first post ( 10 ) extending in a vertical direction along a side surface of the building ( 33 ) or of the structure;

a plurality of solar panels ( 13 ) fixed to the first post ( 10 ); and

a carrier driver configured to move the first support carrier ( 23 a , 23 b , 23 c , 23 d ) in a first direction along a length of the first rail ( 20 ) or in a second direction opposite to the first direction.

2. The solar panel installation system ( 1 , 1 B′) according to claim 1 , wherein

the building ( 33 ) or the structure includes the side surface including a first side surface and a second side surface,

the first rail ( 20 ) includes a first portion being straight and extending along the first side surface, a second portion being straight and extending along the second side surface, and a curved portion connecting the first portion and the second portion, and

the carrier driver moves the first support carrier ( 23 a , 23 b , 23 c , 23 d ) from the first portion to the second portion through the curved portion, and moves the first support carrier ( 23 a , 23 b , 23 c , 23 d ) from the second portion to the first portion through the curved portion.

3. The solar panel installation system ( 1 B, 1 B′) according to claim 2 , wherein

the carrier driver moves the first support carrier ( 23 a , 23 b , 23 c , 23 d ) from the first portion to the second portion in response to a predetermined time point being reached.

4. The solar panel installation system ( 1 B, 1 B′) according to claim 1 , wherein

the carrier driver includes a first winder ( 29 ) configured to move the first support carrier ( 23 a , 23 b , 23 c , 23 d ) in the first direction and a second winder ( 30 ) configured to move the first support carrier ( 23 a , 23 b , 23 c , 23 d ) in the second direction,

the first winder ( 29 ) winds a first wire ( 31 ) connected to an end of the first support carrier ( 23 a , 23 b , 23 c , 23 d ) in a movement direction of the first support carrier ( 23 a , 23 b , 23 c , 23 d ) to move the first support carrier ( 23 a , 23 b , 23 c , 23 d ) in the first direction, and

the second winder ( 30 ) winds a second wire ( 32 ) connected to another end of the first support carrier ( 23 a , 23 b , 23 c , 23 d ) in the movement direction to move the first support carrier ( 23 a , 23 b , 23 c , 23 d ) in the second direction.

5. The solar panel installation system ( 1 B, 1 B′) according to claim 2 , further comprising:

a second support carrier ( 23 b , 23 c , 23 d ) spaced from the first support carrier ( 23 a , 23 b , 23 c ) in a movement direction of the first support carrier ( 23 a , 23 b , 23 c ), the second support carrier ( 23 b , 23 c , 23 d ) being movable along the first rail ( 20 ), the second support carrier ( 23 b , 23 c , 23 d ) being coupled to the first support carrier ( 23 a , 23 b , 23 c ) with a coupler ( 24 a , 24 b , 24 c ), the second support carrier ( 23 b , 23 c , 23 d ) being located on the first rail ( 20 ) and including a portion protruding outward from the building ( 33 ) or from the structure;

a second post ( 10 ) directly or indirectly supported by the portion of the second support carrier ( 23 b , 23 c , 23 d ) protruding outward from the building ( 33 ) or from the structure, the second post ( 10 ) extending in the vertical direction along the side surface of the building ( 33 ) or of the structure; and

a plurality of solar panels ( 13 ) fixed to the second post ( 10 ),

wherein the carrier driver moves the first support carrier ( 23 a , 23 b , 23 c ) and the second support carrier ( 23 b , 23 c , 23 d ) from the first portion to the second portion through the curved portion, and moves the first support carrier ( 23 a , 23 b , 23 c ) and the second support carrier ( 23 b , 23 c , 23 d ) from the second portion to the first portion through the curved portion.

6. The solar panel installation system ( 1 B′) according to claim 1 , further comprising:

a gear ( 12 ) fixed directly or indirectly to the first post ( 10 ); and

a drive included in the first support carrier ( 23 a , 23 b , 23 c , 23 d ), the drive being configured to rotate the gear ( 12 ) to rotate the first post ( 10 ) in a circumferential direction of the first post ( 10 ).

7. The solar panel installation system ( 1 B′) according to claim 6 , wherein

the drive includes a drive gear ( 16 ) meshing with the gear ( 12 ), and a motor ( 15 ) configured to rotate the drive gear ( 16 ), and

the gear ( 12 ) rotates in response to rotation of the drive gear ( 16 ).

8. The solar panel installation system ( 1 B′) according to claim 1 , further comprising:

a base ( 5 ) at a lower end of the first post ( 10 );

a connecting wire ( 7 ) placed in a hollow in the first post ( 10 ) being tubular, the connecting wire ( 7 ) connecting the base ( 5 ) to the portion of the first support carrier ( 23 a , 23 b , 23 c , 23 d ) protruding outward from the building ( 33 ) or from the structure;

a hook ( 9 ) at a lower end of the connecting wire ( 7 ); and

a hook engagement portion ( 6 ) on the base ( 5 ),

wherein the connecting wire ( 7 ) has the lower end connected to the base ( 5 ) with the hook ( 9 ) being hooked on the hook engagement portion ( 6 ).

9. The solar panel installation system ( 1 B′) according to claim 6 , wherein

the first post ( 10 ) includes a plate ( 11 ) fixed to an upper end of the first post ( 10 ), and

the gear ( 12 ) is fixed to the first post ( 10 ) with the plate ( 11 ) between the gear ( 12 ) and the first post ( 10 ).

10. The solar panel installation system ( 1 B′) according to claim 1 , wherein

the first rail ( 20 ) comprises steel,

the first support carrier ( 23 a , 23 b , 23 c , 23 d ) includes a first movable portion ( 35 ) movable along the first rail ( 20 ), and

the first movable portion ( 35 ) includes an electromagnet ( 37 a ).

11. The solar panel installation system ( 1 B′) according to claim 1 , further comprising:

a second rail ( 34 ) at a lower end of the first post ( 10 ),

wherein the first post ( 10 ) moves with the lower end along the second rail ( 34 ) in response to movement of the first support carrier ( 23 a , 23 b , 23 c , 23 d ).

12. The solar panel installation system ( 1 B′) according to claim 11 , wherein

the second rail ( 34 ) comprises steel,

the first post ( 10 ) includes a second movable portion ( 36 ) at the lower end, and the second movable portion ( 36 ) is movable along the second rail ( 34 ), and

the second movable portion ( 36 ) includes an electromagnet ( 37 b ).

Assignments (1)
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Aug 18, 2023
From: HOSAKA, SHINGO
To: KABUSHIKI KAISHA LAILE
Reel/Frame 064638/0538 →
Priority Claims (2)
JP 2021-026973 · Feb 24, 2021 · national
JP 2021-136992 · Aug 25, 2021 · national
Continuity (2)
Continuation PCTJP2022005870 · Feb 15, 2022
Related Publication 20230396209A1 · Dec 7, 2023
References Cited (10)
US 10020410B1 · Weston · 2018 [cited by applicant]
US 10938337B1 · Carleton · 2021 [cited by examiner]
US 20160230394A1 · Secco · 2016 [cited by examiner]
JP 2010199359A · 2010 [cited by applicant]
JP 2011129664A · 2011 [cited by applicant]
JP 2013194503A · 2013 [cited by applicant]
JP 6896948B · 2021 [cited by applicant]
WO 2015029728A1 · 2015 [cited by applicant]
International Search Report issued in PCT/JP2022/005870 mailed on Apr. 5, 2022 with English Translation (5 pages). [cited by applicant]
Written Opinion of International Searching Authority issued in PCT/JP2022/005870 mailed on Apr. 5, 2022 with English Translation (5 pages). [cited by applicant]