IP Library Granted Patent US 12,362,563
Granted Patent B2
US 12,362,563 · App. 18/455,898 · Granted Jul 15, 2025

Power plant having a flexible firm skid

Inventors: Willy Steve Ziminsky (Greenville, SC); Brock McLaren Wilson (Huntsville, AL)
Assignee: GE Vernova Infrastructure Technology LLC
H02J3/14H02J3/381H02J3/46H02J11/00H02J13/00002H02J2300/10H02J2300/20H02J2310/18
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,362,563
App. No.
18/455,898
Granted
Jul 15, 2025
Kind
B2
Abstract

A method of operating a power plant is provided. The method includes generating, with the one or more power generators, a total plant power. The method further includes supplying, with a back up power source, a backup power output. The method further includes providing a first portion of the total plant power to one or more auxiliary devices to meet an auxiliary demand. The method further includes providing at least one of a second portion of the total plant power and the backup power output to the flexible firm skid to meet the flexible firm demand. The method further includes providing a third portion of the total plant power to a power grid outside of the power plant to meet a grid demand.

Claims (48)

1. A method of operating a power plant, the method comprising:

generating, with one or more power generators, a total plant power;

supplying, with a back up power source, a backup power output;

providing a first portion of the total plant power to one or more auxiliary devices to meet an auxiliary demand, the auxiliary demand being generated through operation of the one or more auxiliary devices, the one or more auxiliary devices being one of thermally, fluidly, or mechanically coupled to the one or more power generators;

providing at least one of a second portion of the total plant power and the backup power output to a flexible firm skid to meet a flexible firm power demand, the flexible firm skid including one or more digital assets configured to generate the flexible firm power demand through operation of the one or more digital assets;

providing a third portion of the total plant power to a power grid outside of the power plant to meet a grid demand;

comparing a magnitude of the grid demand to one or more power thresholds; and

adjusting a ratio of the second portion of the total plant power and the backup power output used to meet the flexible firm power demand based on the comparison.

2. The method as in claim 1 , wherein providing at least one of the second portion and the backup power output further comprises:

providing both the second portion of the total plant power and the backup power output to the flexible firm skid to meet the flexible firm power demand.

3. The method as in claim 1 , wherein the one or more power generators comprises a gas turbine, and wherein the method further comprises:

starting the gas turbine at least partially with the backup power output.

4. The method as in claim 3 , wherein starting the gas turbine at least partially with the backup power output further comprises:

providing the backup power output to an electric motor coupled to a shaft of the gas turbine;

rotating the shaft with the electric motor; and

initiating combustion in a combustion section of the gas turbine.

5. The method as in claim 4 , wherein the combustion section of the gas turbine is fluidly coupled to a fuel supply, and wherein the back up power source is fluidly coupled to the fuel supply.

6. The method as in claim 1 , wherein the flexible firm skid includes a containerized demand sink having the one or more digital assets disposed within a housing, and wherein the one or more digital assets comprises at least one of data centers, digital factory equipment, and computing units.

7. The method as in claim 6 , wherein the containerized demand sinks are disposed within a proximity of 0 meters and 500 meters of the one or more power generators.

8. The method as in claim 1 , further comprising:

receiving an increase in the grid demand that exceeds a power ramp rate of the one or more power generators;

adjusting an operation of the flexible firm skid to modify the flexible firm demand in response to the increase in the grid demand; and

reducing the flexible firm demand by an amount that is approximately equal to the increase in the grid demand to adjust the operation of the flexible firm skid in response to the increase in the grid demand.

9. A power plant comprising:

one or more power generators electrically connected to a power grid outside of the power plant;

one or more auxiliary devices that is at least one of mechanically, thermally, or fluidly coupled to the one or more power generators, the one or more auxiliary devices configured to generate an auxiliary demand;

a flexible firm skid disposed within the power plant, the flexible firm skid including a containerized demand sink and a back up power source electrically connected to the containerized demand sink and the one or more power generators, the flexible firm skid including one or more digital assets configured to generate a flexible firm power demand through operation of the one or more digital assets; and

a controller operably connected to the one or more power generators and the flexible firm skid, the controller including memory and one or more processors, the memory storing instructions that when executed by the one or more processors cause the power plant to perform operations including the following:

generate, with the one or more power generators, a total plant power;

supply, with the back up power source, a backup power output;

provide a first portion of the total plant power to the one or more auxiliary devices to meet the auxiliary demand;

provide at least one of a second portion of the total plant power and the backup power output to the flexible firm skid to meet the flexible firm power demand, the flexible firm power demand being generated through operation of the flexible firm skid;

provide a third portion of the total plant power to the power grid to meet a grid demand;

compare a magnitude of the grid demand to one or more power thresholds; and

adjust a ratio of the second portion of the total plant power and the backup power output used to meet the flexible firm power demand based on the comparison.

10. The power plant as in claim 9 , wherein the one or more power generators comprises a gas turbine, and wherein the operations further include:

start the gas turbine at least partially with the backup power output.

11. The power plant as in claim 10 , wherein in starting the gas turbine at least partially with the backup power output, the operations further include:

provide the backup power output to an electric motor coupled to a shaft of the gas turbine;

rotate the shaft with the electric motor; and

initiate combustion in a combustion section of the gas turbine.

12. The power plant as in claim 11 , wherein the combustion section of the gas turbine is fluidly coupled to a fuel supply system, and wherein the back up power source is fluidly coupled to the fuel supply system.

13. The power plant as in claim 9 , wherein the back up power source is fluidly coupled to a standalone fuel supply.

14. The power plant as in claim 9 , wherein the flexible firm skid includes the containerized demand sink having the one or more digital assets disposed within a housing.

15. The power plant as in claim 14 , wherein the one or more digital assets comprises at least one of data centers, digital factory equipment, and computing units.

16. The power plant as in claim 14 , wherein the containerized demand sinks are disposed within a proximity of 0 meters and 500 meters of the one or more power generators.

17. The power plant as in claim 9 , wherein in providing at least one of the second portion and the backup power output, the operations further comprise:

provide both the second portion of the total plant power and the backup power output to the flexible firm skid to meet the flexible firm power demand.

Assignments (2)
CHANGE OF NAME Recorded May 27, 2025
From: GE INFRASTRUCTURE TECHNOLOGY LLC
To: GE VERNOVA INFRASTRUCTURE TECHNOLOGY LLC
Reel/Frame 071395/0184 →
ASSIGNMENT OF ASSIGNOR'S INTEREST Recorded Sep 8, 2023
From: ZIMINSKY, WILLY STEVE; WILSON, BROCK MCLAREN
To: GE INFRASTRUCTURE TECHNOLOGY LLC
Reel/Frame 064837/0830 →
Continuity (1)
Related Publication 20250070554A1 · Feb 27, 2025
References Cited (74)
US 8146374B1 · Zien · 2012 [cited by applicant]
US 9160175B2 · Cservolgyi et al. · 2015 [cited by applicant]
US 10110003B2 · Stalker · 2018 [cited by applicant]
US 10287988B2 · Asati et al. · 2019 [cited by applicant]
US 10367353B1 · McNamara et al. · 2019 [cited by applicant]
US 10444818B1 · McNamara et al. · 2019 [cited by applicant]
US 10452127B1 · McNamara et al. · 2019 [cited by applicant]
US 10608433B1 · McNamara et al. · 2020 [cited by applicant]
US 10618427B1 · McNamara et al. · 2020 [cited by applicant]
US 10626817B1 · Piche et al. · 2020 [cited by applicant]
US 10857899B1 · McNamara et al. · 2020 [cited by applicant]
US 10873211B2 · McNamara et al. · 2020 [cited by applicant]
US 10910873B2 · Bonachea · 2021 [cited by applicant]
US 11016456B2 · Henson et al. · 2021 [cited by applicant]
US 11016458B2 · McNamara et al. · 2021 [cited by applicant]
US 11016553B2 · McNamara et al. · 2021 [cited by applicant]
US 11025060B2 · McNamara et al. · 2021 [cited by applicant]
US 11031783B2 · McNamara et al. · 2021 [cited by applicant]
US 11031787B2 · McNamara et al. · 2021 [cited by applicant]
US 11031813B2 · McNamara et al. · 2021 [cited by applicant]
US 11042948B1 · McNamara et al. · 2021 [cited by applicant]
US 11128165B2 · McNamara et al. · 2021 [cited by applicant]
US 11221597B2 · Dempster · 2022 [cited by applicant]
US 11256320B2 · McNamara et al. · 2022 [cited by applicant]
US 11275427B2 · McNamara et al. · 2022 [cited by applicant]
US 11283261B2 · McNamara et al. · 2022 [cited by applicant]
US 11342746B2 · McNamara et al. · 2022 [cited by applicant]
US 11397999B2 · McNamara et al. · 2022 [cited by applicant]
US 11431195B2 · McNamara et al. · 2022 [cited by applicant]
US 11437821B2 · Cavness et al. · 2022 [cited by applicant]
US 11451059B2 · Cavness et al. · 2022 [cited by applicant]
US 11537183B2 · Lewis et al. · 2022 [cited by applicant]
US 11574372B2 · Barbour · 2023 [cited by applicant]
US 11581734B2 · McNamara et al. · 2023 [cited by applicant]
US 11592886B2 · Marks et al. · 2023 [cited by applicant]
US 11594888B2 · McNamara et al. · 2023 [cited by applicant]
US 11611219B2 · McNamara et al. · 2023 [cited by applicant]
US 20080018175A1 · McNamara et al. · 2008 [cited by applicant]
US 20090078401A1 · Cichanowicz · 2009 [cited by applicant]
US 20130328395A1 · Krizman et al. · 2013 [cited by applicant]
US 20140044261A1 · Massimo · 2014 [cited by applicant]
US 20150261240A1 · Mokhtari · 2015 [cited by examiner]
US 20180145511A1 · Biellmann · 2018 [cited by examiner]
US 20190339756A1 · Lewis · 2019 [cited by examiner]
US 20200040272A1 · Cavness · 2020 [cited by examiner]
US 20200359572A1 · Henson et al. · 2020 [cited by applicant]
US 20210010385A1 · Spears · 2021 [cited by applicant]
US 20210027223A1 · Koide · 2021 [cited by applicant]
US 20210035242A1 · McNamara · 2021 [cited by examiner]
US 20210036547A1 · McNamara et al. · 2021 [cited by applicant]
US 20210092875A1 · Hellmann-Regen · 2021 [cited by applicant]
US 20210101499A1 · McNamara et al. · 2021 [cited by applicant]
US 20210288496A1 · McNamara et al. · 2021 [cited by applicant]
US 20210296928A1 · McNamara et al. · 2021 [cited by applicant]
US 20210312574A1 · McNamara et al. · 2021 [cited by applicant]
US 20220050714A1 · Grimshaw et al. · 2022 [cited by applicant]
US 20220065162A1 · Hunt et al. · 2022 [cited by applicant]
US 20220085603A1 · McNamara et al. · 2022 [cited by applicant]
US 20220171449A1 · McNamara et al. · 2022 [cited by applicant]
US 20220197363A1 · McNamara et al. · 2022 [cited by applicant]
US 20220271563A1 · Hug · 2022 [cited by applicant]
US 20220278531A1 · Ough · 2022 [cited by examiner]
US 20220294219A1 · McNamara et al. · 2022 [cited by applicant]
US 20220300394A1 · Webber · 2022 [cited by applicant]
US 20220335543A1 · Roston et al. · 2022 [cited by applicant]
US 20220407350A1 · McNamara et al. · 2022 [cited by applicant]
US 20230121669A1 · McNamara et al. · 2023 [cited by applicant]
US 20230387682A1 · Tateiwa · 2023 [cited by examiner]
US 20240162746A1 · Billingsley, Jr. · 2024 [cited by examiner]
CN 115760400A · 2023 [cited by applicant]
EP 3738014A4 · 2022 [cited by applicant]
KR 20230000865A · 2023 [cited by applicant]
Kordkheili et al., On-Site Power Generation for Data Centers, Sustainable Digital Infrastructure Alliance (SDIA), Integrating Data Centers with Low Carbon Energy Assets, 2021, 12 Pages. Retrieved May 18, 2023 from Webpa… [cited by applicant]
European Search Report Corresponding to U.S. Appl. No. 24/191,974 on Feb. 21, 2025. [cited by applicant]
Cited By (1)
US 12,709,132