IP Library › Granted Patent US 12,376,129
Granted Patent B2
US 12,376,129 · App. 18/594,780 · Granted Jul 29, 2025

Supplementary uplink transmissions in wireless systems

Inventors: Faris Alfarhan (Montreal, CA); Mouna Hajir (Montreal, CA); Ghyslain Pelletier (Montreal, CA); J. Patrick Tooher (Montreal, CA); Paul Marinier (Brossard, CA); Martino M. Freda (Laval, CA)
Assignee: InterDigital Patent Holdings, Inc.
H04W72/23H04L5/0082H04W72/0446H04W72/0453H04W72/56H04W80/02H04W80/08
View Patent ↗
Loading inventors, assignments & file history…
Monitor This Case
Get email alerts when status or documents change.
Order Certified Copies
Most orders are placed with the USPTO same day — all within 24 business hours.
Order via The Patent Place →
Pre-filled with this patent's details
Quick Facts
Patent No.
US 12,376,129
App. No.
18/594,780
Filed
Mar 4, 2024
Granted
Jul 29, 2025
Kind
B2
Art Unit
2413
USPC
370/329
Abstract

Systems, methods, and instrumentalities are disclosed for uplink (UL) transmissions in wireless systems. The systems, methods and instrumentalities may include a wireless transmit/receive unit (WTRU) with a receiver configured to receive one or more uplink (UL) grants that may include allocations associated with a regular UL (RUL) carrier and a supplementary UL (SUL) carrier. The RUL and SUL carriers may be associated with a common downlink (DL) carrier of a serving cell. The WTRU may include a processor configured to select data from one or more logical channels for transmission in accordance with the allocations. The WTRU may include a transmitter configured to transmit data from one logical channel on the RUL carrier and to transmit data from another logical channel on the SUL carrier in accordance with the allocations.

Claims (28)

1. A wireless transmit/receive unit (WTRU), comprising a processor and memory, the processor and memory configured to:

receive configuration information, the configuration information indicating that data corresponding to a first set of one or more logical channels can be transmitted using a first type of uplink (UL) grant and that data corresponding to a second set of one or more logical channels can be transmitted using a second type of UL grant;

receive a first UL grant and a second UL grant, wherein the first UL grant and the second UL grant at least partially overlap in a time domain, the first UL grant corresponds to the first type of UL grant, and the second UL grant corresponds to the second type of UL grant;

determine that the first set of one or more logical channels comprises a first logical channel that has data available for transmission, the first logical channel being associated with a first priority;

determine that the second set of one or more logical channels comprises a second logical channel that has data available for transmission, the second logical channel being associated with a second priority, the first priority being higher than the second priority;

prioritize the first UL grant over the second UL grant based on the first priority being higher than the second priority; and

transmit data associated with the first set of one or more logical channels in accordance with the first UL grant based on prioritizing the first UL grant over the second UL grant.

2. The WTRU of claim 1 , wherein the processor and memory being configured to prioritize the first UL grant over the second UL grant comprises the processor and memory being configured to ignore the second UL grant.

3. The WTRU of claim 1 , wherein the processor and memory are configured to receive at least one of the first or second UL grant via radio resource control (RRC) signaling.

4. The WTRU of claim 1 , wherein the processor and memory are configured to receive at least one of the first or second UL grant via downlink control information (DCI).

5. The WTRU of claim 1 , wherein the first logical channel corresponds to a highest priority logical channel with data available for transmission of the first set of one or more logical channels, and the second logical channel corresponds to a highest priority logical channel with data available for transmission of the second set of one or more logical channels.

6. The WTRU of claim 1 , wherein the first UL grant is associated with a first UL transmission resource and the second UL grant is associated with a second UL transmission resource.

7. The WTRU of claim 1 , wherein the processor and memory are configured to receive the configuration information in a radio resource control (RRC) message.

8. The WTRU of claim 1 , wherein at least one of the first UL grant or the second UL grant is a configured grant.

9. A method implemented by a wireless transmit receive unit (WTRU), the method comprising:

receiving configuration information, the configuration information indicating that data corresponding to a first set of one or more logical channels can be transmitted using a first type of uplink (UL) grant and that data corresponding to a second set of one or more logical channels can be transmitted using a second type of UL grant;

receiving a first UL grant and a second UL grant, wherein the first UL grant and the second UL grant at least partially overlap in a time domain, the first UL grant corresponds to the first type of UL grant, and the second UL grant corresponds to the second type of UL grant;

determining that the first set of one or more logical channels comprises a first logical channel that has data available for transmission, the first logical channel being associated with a first priority;

determining that the second set of one or more logical channels comprises a second logical channel that has data available for transmission, the second logical channel being associated with a second priority, the first priority being higher than the second priority;

prioritizing the first UL grant over the second UL grant based on the first priority being higher than the second priority; and

transmitting data associated with the first set of one or more logical channels in accordance with the first UL grant based on prioritizing the first UL grant over the second UL grant.

10. The method of claim 9 , wherein prioritizing the first UL grant over the second UL grant comprises ignoring the second UL grant.

11. The method of claim 9 , wherein at least one of the first or second UL grant is received via radio resource control (RRC) signaling.

12. The method of claim 9 , wherein at least one of the first or second UL grant is received via downlink control information (DCI).

13. The method of claim 9 , wherein the first logical channel corresponds to a highest priority logical channel with data available for transmission of the first set of one or more logical channels, and the second logical channel corresponds to a highest priority logical channel with data available for transmission of the second set of one or more logical channels.

14. The method of claim 9 , wherein the first UL grant is associated with a first UL transmission resource and the second UL grant is associated with a second UL transmission resource.

15. The method of claim 9 , wherein the configuration information is received in a radio resource control (RRC) message.

16. The method of claim 9 , wherein at least one of the first UL grant or the second UL grant is a configured grant.

Continuity (4)
Continuation 16763704
Provisional Application 62615404 · Jan 9, 2018
Provisional Application 62586095 · Nov 14, 2017
Related Publication 20240276507A1 · Aug 15, 2024
References Cited (36)
US 10334598B2 · Loehr et al. · 2019 [cited by applicant]
US 10880916B2 · Tang · 2020 [cited by applicant]
US 20110170495A1 · Earnshaw et al. · 2011 [cited by applicant]
US 20160050658A1 · Tabet et al. · 2016 [cited by applicant]
US 20170318594A1 · Babaei · 2017 [cited by examiner]
US 20180092122A1 · Babaei et al. · 2018 [cited by applicant]
US 20180176937A1 · Chen et al. · 2018 [cited by applicant]
US 20180279262A1 · Babaei · 2018 [cited by examiner]
US 20180279358A1 · Babaei et al. · 2018 [cited by applicant]
US 20180324768A1 · Shaheen et al. · 2018 [cited by applicant]
US 20180324833A1 · He et al. · 2018 [cited by applicant]
US 20180368133A1 · Park et al. · 2018 [cited by applicant]
US 20190261408A1 · Lou et al. · 2019 [cited by applicant]
US 20190335448A1 · Yang · 2019 [cited by examiner]
US 20190364586A1 · Li et al. · 2019 [cited by applicant]
US 20200022094A1 · You et al. · 2020 [cited by applicant]
US 20200037345A1 · Ryoo et al. · 2020 [cited by applicant]
US 20200068600A1 · Yu et al. · 2020 [cited by applicant]
US 20200170035A1 · Lee et al. · 2020 [cited by applicant]
US 20200196327A1 · Zhang et al. · 2020 [cited by applicant]
US 20200267753A1 · Adjakple et al. · 2020 [cited by applicant]
US 20200314888A1 · Kolding et al. · 2020 [cited by applicant]
US 20210176740A1 · Lee et al. · 2021 [cited by applicant]
US 20210185642A1 · Sebire et al. · 2021 [cited by applicant]
JP 2013059050A · 2013 [cited by applicant]
JP 2016042701A · 2016 [cited by applicant]
Third Generation Partnership Project (3GPP), “WF on SUL Operations”, 3GPP TSG RAN WG1 Meeting 90bis Prague, CZ, R1-1719112, Oct. 9-13, 2017, 2 pages. [cited by applicant]
Third Generation Partnership Project (3GPP), “LCP for grant-free transmissions”, 3GPP TSG-RAN WG2 #99bis, R2-1711423, Prague, The Czech Republic, Oct. 9-13, 2017 Revision of R2-1708101, Oct. 9-13, 2017, 5 pages. [cited by applicant]
R2-1708622, “LCP procedure for NR”, Lenovo, Motorola Mobility, 3GPP TSG RAN WG2 #99, Aug. 11, 2017. [cited by applicant]
3rd Generation Partnership Project (3GPP), R2-1704397, “Logical Channel Prioritization and Multiple Numerologies”, Ericsson, 3GPP TSG-RAN WG2 #98, Hangzhou, P.R. of China, May 15-19, 2017, pp. 1-4. [cited by applicant]
3rd Generation Partnership Project (3GPP), R2-1709600, “The Impact of Processing Order of UL Grants on LCP”, Samsung, 3GPP TSG RAN WG2 #99, Berlin, Germany, Aug. 21-25, 2017, pp. 1-5. [cited by applicant]
3rd Generation Partnership Project (3GPP), R1-1717097, “HARQ/CSI Feedback and Scheduling Timing for SUL”, Huawei, HiSilicon, 3GPP TSG RAN WG1 Meeting 90bis, Prague, Czech Republic, Oct. 9-13, 2017, 7 pages. [cited by applicant]
3rd Generation Partnership Project (3GPP), R2-1706588, “Details on LCP”, Nokia, Alcatel-Lucent Shanghai Bell, 3GPP TSG-RAN WG2 NR Adhoc #2, Qingdao, China, Jun. 27-29, 2017, 2 pages. [cited by applicant]
3rd Generation Partnership Project (3GPP), R2-1707739, “Parameters in the Profile for LCP”, OPPO, 3GPP TSG RAN WG2 #99, Berlin, Germany, Aug. 21-25, 2017, pp. 1-3. [cited by applicant]
3rd Generation Partnership Project (3GPP), R2-1711029, “LCP Procedure for NR”, Lenovo, Motorola Mobility, 3GPP TSG-RAN WG2 Meeting #99bis, Prague, Czech Republic, Oct. 9-13, 2017, 6 pages. [cited by applicant]
3rd Generation Partnership Project (3GPP), R2-1711824, “Considerations on Support of Supplementary Uplink Frequency”, CMCC, 3GPP TSG-RAN WG2 Meeting #99bis, Prague, Czech Republic, Oct. 9-13, 2017, 6 pages. [cited by applicant]